This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 13, 2002
The proposal being assessed is for the diversion of 8 gigalitres a year (on average) (GL/yr) of unallocated water resources in the Samson Catchment to be diverted for public water supply, the construction of a pipe head dam and related infrastructure. The Samson Brook Redevelopment Scheme is a key element of the Water Corporation’s drought recovery plan. Read more...Last updated: July 15, 2002
Two proposals to clear native vegetation for agricultural purposes on Melbourne Location 3927 within the Shire of Dandaragan. It is intended that the cleared land resulting from both proposals will be used for the purposes of horticulture and grazing. The level of assessment for the first proposal was published on 17 April 1998, and the second on 4 March 2002. Read more...Last updated: June 12, 2002
The proposal is to design and construct the extension of the Tonkin Highway from Mills Road West to South Western Highway. The proposal is approximately 32 km in length and includes the design, construction and use of a highway of six lanes from Mills Road West to Mundijong Road and four lanes from Mundijong Road to South Western Highway. Read more...Last updated: February 12, 2002
The proposal is to clear 100 hectares of native vegetation on Kent Location 1910 for agriculture. Specifically, the stated purpose of the proposed clearing is to enable the expansion of an existing grazing and cropping enterprise. Location 1910 is located approximately 40 km south of Jerramungup on Roberts Road, in the Shire of Jerramungup. The proposed clearing, if allowed to proceed, would reduce the amount of native vegetation on the property from 400 hectares (approximately 36% of the... Read more...Last updated: February 6, 2002
Proposal by the Midland Redevelopment Authority (MRA) to remediate 22 hectare (ha) of land which includes a portion of the former Midland Railway Workshop Site (Area E) within the Clayton Precinct, Clayton Street road extension and the Helena Street and Viveash Road rail crossings outside of the Clayton Precinct in Midland. Read more...Last updated: February 6, 2002
The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains. The M2 Project is located near Kununurra within the Victoria-Bonaparte Biogeographic Region and the project area extends over approximately 76,000 ha of land comprising the Weaber, Keep River and Knox Creek Plains, and involves approximately equal areas within WA and the NT. The proposal has been assessed in two parts: biodiversity and management. This assessment is of the management component. See... Read more...Last updated: February 6, 2002
The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains. The M2 Project is located near Kununurra within the Victoria-Bonaparte Biogeographic Region and the project area extends over approximately 76,000 ha of land comprising the Weaber, Keep River and Knox Creek Plains, and involves approximately equal areas within WA and the NT. The proposal has been assessed in two parts: biodiversity and management. This assessment is of the biodiversity. See here for... Read more...Last updated: November 14, 2001
The proposed airport will be located in a site approximately 12 km north-east of Broome townsite. The proposal involves the construction of one main runway, parallel taxiway, turning nodes, apron parking, general aviation parking, maintenance and storage hangers and fuel storage. It also includes domestic and international terminals, land-side and airside commercial activities and a short future parallel runway for light aircraft. Read more...Last updated: November 28, 2000
The proposal is to develop two iron ore deposits (Nammuldi and Silvergrass) near Hamersley Iron Pty Limited’s current Brockman No. 2 iron ore mine, 65 kilometres north-west of Tom Price. Read more...Last updated: September 18, 2000
Proposal to construct a gas to synthetics plant on the Burrup peninsula. Read more...Last updated: September 14, 2000
The proposal is for the widespread distribution and use of bauxite residue from Alcoa of Australia's Kwinana, Wagerup and Pinjarra refineries for the purpose of soil amendment for the currently approved land use activities on the Swan Coastal Plain portion of the catchment of the Peel inlet and Harvey Estuary. This inquiry under s46 is in regard to a request for extension of approval time limit. Read more...Last updated: August 9, 2000
Proposal to develop the Wallaby Gold Mine. Located on the shore of Lake Carey, a naturally occurring saline wetland approximately 27 km south-west of Laverton. The Wallaby Gold Mine Project includes development of an open cut gold mine, waste rock dumps and infrastructure to support mining on the northern shoreline of the lake. Gold ore produced at the mine will be transported via overland conveyor to an existing processing plant with tailings placed in both an extended and a new tailings... Read more...Last updated: July 20, 2000
Proposal by Cable Sands (WA) Pty Ltd to mine mineral sands and relocate an existing rubbish tip in a portion of "C" Class Reserve 31900 which is vested in the Shire of Harvey for the purpose of sand extraction and rubbish disposal. Read more...Last updated: July 13, 2000
The proposal includes gold mining developments within a defined project area on Lake Lefroy a naturally occurring salt lake approximately 7 kilometres south-east of Kambalda. Thirteen sites have already been identified for development of open-cut gold mining pits, some with underground portals and mining. Additional sites may be identified within the defined project area. Waste rock dumps, access infrastructure and mining support facilities such as workshops and contractor's compounds will... Read more...Last updated: May 26, 2000
The proponent has notified to clear approximately 266 hectares (ha) of native vegetation on Fitzgerald Locations 470, 525, 527, 557 and 1480, north-west of Salmon Gums, Shire of Esperance Read more...Last updated: April 19, 2000
Inquiry under section 46 of the Environmental Protection Act 1986 to extend the time limit of the environmental approval for the Great Eastern Highway Northam bypass. Read more...Last updated: April 4, 2000
The proposal is to construct and operate an extension to the Bibra Lake Main Sewer. Read more...Last updated: March 13, 2000
Subdivision of Lots 1 and 2 Baldivis Road, City of Rockingham. Read more...Last updated: February 24, 2000
Inquiry under section 46 of the, Environmental Protection Act 1986, to change condition 4 of the existing environmental conditions relating to Tonkin Industrial Park Stage II development to be changed to allow the proponent to remediate the Tonkin Park Stage II site in Bassendean by the use of one or a combination of the following remediation options: Containment on site and/or Disposal at a landfill site Read more...Last updated: December 15, 1999
The proposal is for the stages 1 and 2 of the development of the Busselton Wastewater Treatment Plant, Queen Elizabeth Avenue, Busselton, to an output of 6,750 cubic metres per day, and disposal of treated wastewater from the plant via an onsite wetland to the Vasse Agricultural drain and consequently to the Vasse Diversion Drain. Read more...