This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 25, 2024
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: November 25, 2024
Hinckley Range Pty Ltd proposes to mine nickeliferous limonite ore from the Wingellina deposit located approximately 1,400 km north-east of Perth in the Shire of Ngaanyatjarraku close to the Northern Territory and South Australia borders Read more...Last updated: November 25, 2024
FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo. The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network. Mining of the magnetite will... Read more...Last updated: April 24, 2024
The proposal is for the Stage 2 expansion of the Murrin Murrin Nickel-Cobalt mining and processing operation (Stage 1), 60 kilometres east of Leonora. The Stage 2 expansion includes the mining of additional ore; an expansion of the processing plant to process additional ore; and the development of additional infrastructure associated with mining and processing of the ore. Read more...Last updated: February 9, 2024
The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...Last updated: November 6, 2023
Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price. Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years. The proposal involves the clearing of up to 8,560 ha of native... Read more...Last updated: September 18, 2023
The proposal involves the excavation and processing of a low-grade (2.7%) heavy mineral sands deposit near Keysbrook to produce 920,000 tonnes of Heavy Mineral Concentrate (HMC) over 8 years. An area of 30 hectares (ha) would be progressively mined at any time. Topsoil would be removed and stockpiled for use in rehabilitation. The ore would be excavated and unloaded into a dump hopper located on the pit floor. The ore would be conveyed to a screening plant where oversize material would be... Read more...Last updated: June 24, 2021
Open cut dry mining of mineral sands and the processing of mined material through primary and secondary concentration plants and dry minerals separation. It includes the construction and operation of associated infrastructure and a modification to the intersection of Brand Hwy with Wannamal Road West. Read more...Last updated: April 16, 2021
Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman. Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. Mine dewatering will be required to accommodate below water table mining, requiring an additional ... Read more...Last updated: April 6, 2020
Hamersley Iron Pty Limited propose to expand its existing Brockman 4 Syncline Iron Ore Mine. The expansion would include further clearing of up to 4,800 hectares and expand its current development envelope by 2,567 hectares. Additional dewatering would also take place resulting in dewater discharge extending further along Boolgeeda Creek by nine kilometres. Read more...Last updated: December 3, 2018
Wesfarmers Chemicals, Energy & Fertilisers Limited proposes to construct and operate a methanol plant with a production capacity of approximately 5,000 tonnes per day ( tpd ) on Site E within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. The proposal is adjacent to the Murujuga National Park. The proposal would result in the disturbance of approximately 75 hectares within Site E. Read more...Last updated: April 4, 2018
Griffin Power Pty Ltd, proposes to construct and operate a 200MW coal-fired power station known as the Bluewaters Power Station Phase II (Bluewaters II) adjacent to the proposed Bluewaters Power Station (Bluewaters I) on a site located approximately 4km north-east of Collie. It would be a subcritical coal-fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters II Power Station would supplement the Bluewaters I Power Station and supply electricity... Read more...Last updated: November 24, 2017
Section 46 Change to Conditions withdrawn 24 November 2017. Read more...Last updated: April 3, 2017
The Western Australian Planning Commission and the City of Armadale propose to develop a water-based recreation park incorporating an international rowing course and other facilities including a residential component on land situated on Lake Road in the City of Armadale. Read more...Last updated: January 9, 2017
Toro proposes to revise the Approved Project by developing Millipede and Lake Maitland uranium deposits and developing associated infrastructure. The Proposed Extension would result in the additional direct disturbance of approximately 1,582 hectares (ha) within an additional Development Envelope of approximately 3,891 ha. The Proposed Extension would include open mine pits at Millipede and Lake Maitland, in-pit tailings storage facility (TSF) at Millipede, accommodation village, workshop, run-... Read more...Last updated: December 16, 2016
The proposal is to mine four poly-metallic deposits containing commercial concentrations of uranium and to produce uranium oxide concentrate and other metal concentrates including copper, zinc, nickel and cobalt, approximately 240km east-northeast of Kalgoorlie. The proposal also includes the construction of associated mine infrastructure consisting of mine dewatering and reinjection infrastructure (including borefields and pipelines), non-mineralised overburden landforms, run of mine stockpile... Read more...Last updated: November 30, 2016
The Site is approximately 16.9 ha and is proposed to be remediated and regenerated. It was previously mined for building and construction sands and was later used as a licensed “inert” landfill. It has been reported that non-approved waste streams were disposed of at the Site. In October 2010 following a compliance inspection the Site was classified “Contaminated – Remediation Required” under Section 13 of the Contaminated Sites Act 2003 The proponent is proposing to redevelop the area by... Read more...Last updated: September 6, 2016
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. The proposal is further documented in EPA Report 1375 and Ministerial Statement 861 . Read more...Last updated: August 7, 2015
The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...