Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • (-) Remove Iron Ore filter Iron Ore
  • Infrastructure (7) Apply Infrastructure filter

Filter by current status:

  • Ministerial Statement published (25) Apply Ministerial Statement published filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter
  • Decision on whether to assess has been published (1) Apply Decision on whether to assess has been published filter
  • EPA Report and Recommendations released - appeals closed (1) Apply EPA Report and Recommendations released - appeals closed filter
  • EPA Report and Recommendations released - no appeals received (1) Apply EPA Report and Recommendations released - no appeals received filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter

Filter by relevant environmental factors:

  • (-) Remove Hydrological Processes filter Hydrological Processes
  • (-) Remove Subterranean Fauna filter Subterranean Fauna
  • Flora and Vegetation (29) Apply Flora and Vegetation filter
  • Terrestrial Fauna (23) Apply Terrestrial Fauna filter
  • Inland Waters Environmental Quality (21) Apply Inland Waters Environmental Quality filter
  • Social Surroundings (12) Apply Social Surroundings filter
  • Air Quality (6) Apply Air Quality filter
  • Terrestrial Environmental Quality (2) Apply Terrestrial Environmental Quality filter
  • Landforms (1) Apply Landforms filter

Filter by Proponent:

  • BHP Billiton Iron Ore Pty Ltd (5) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Hamersley Iron Pty Limited (4) Apply Hamersley Iron Pty Limited filter
  • Robe River Mining Co. Pty. Ltd (4) Apply Robe River Mining Co. Pty. Ltd filter
  • Fortescue Metals Group Ltd (3) Apply Fortescue Metals Group Ltd filter
  • Fortescue Metals Group Limited (2) Apply Fortescue Metals Group Limited filter
  • Atlas Iron Limited (1) Apply Atlas Iron Limited filter
  • BC Pilbara Iron Ore Pty Ltd (1) Apply BC Pilbara Iron Ore Pty Ltd filter
  • Cliffs Asia Pacific Iron Ore Pty Ltd (1) Apply Cliffs Asia Pacific Iron Ore Pty Ltd filter
  • FerrAus Pty Limited (1) Apply FerrAus Pty Limited filter
  • FI Joint Venture Pty Ltd (FIJV) (1) Apply FI Joint Venture Pty Ltd (FIJV) filter
  • Flinders Mines Limited (1) Apply Flinders Mines Limited filter
  • FMG (1) Apply FMG filter
  • Hamersley Iron – Yandi Pty Limited (1) Apply Hamersley Iron – Yandi Pty Limited filter
  • Hamersley Iron Pty Ltd (1) Apply Hamersley Iron Pty Ltd filter
  • Hope Downs Management Services Pty Ltd (1) Apply Hope Downs Management Services Pty Ltd filter
  • Iron Ore Holdings Ltd (1) Apply Iron Ore Holdings Ltd filter
  • Mount Bruce Mining Pty Ltd (1) Apply Mount Bruce Mining Pty Ltd filter
  • Roy Hill Iron Ore Pty Ltd (1) Apply Roy Hill Iron Ore Pty Ltd filter

Filter by region:

  • Pilbara (26) Apply Pilbara filter
  • Perth (2) Apply Perth filter
  • Mid West (1) Apply Mid West filter
  • Wheatbelt (1) Apply Wheatbelt filter

Filter by last updated:

  • 2021 (2) Apply 2021 filter
  • 2020 (6) Apply 2020 filter
  • 2019 (4) Apply 2019 filter
  • 2017 (1) Apply 2017 filter
  • 2016 (4) Apply 2016 filter
  • 2015 (2) Apply 2015 filter
  • 2014 (3) Apply 2014 filter
  • 2013 (3) Apply 2013 filter
  • 2012 (1) Apply 2012 filter
  • 2011 (1) Apply 2011 filter
  • 2010 (1) Apply 2010 filter
  • 2006 (2) Apply 2006 filter
  1. Home
  2. Proposal search
  3. Hydrological Processes
  4. Subterranean Fauna
  5. Iron Ore

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

West Angelas Iron Ore Project Deposits C, D and G

Last updated: April 16, 2021

Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman.   Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. Mine dewatering will be required to accommodate below water table mining, requiring an additional  ... Read more...

Koodaideri Iron Ore Mine and Infrastructure Project

Last updated: January 4, 2021

Hamersley Iron Pty. Limited (a wholly -owned subsidiary of Rio Tinto) proposes the development of a major iron ore mining operation in the central Pilbara region of Western Australia. The development will be centered around its Koodaideri deposits, located 110 kilometres west-north-west of Newman. The Proposal will involve the construction and operation of a greenfields mine and associated infrastructure. Mining will consist of open pits and supporting infrastructure, including a 167 kilometre... Read more...

Yogi Magnetite Project

Last updated: October 6, 2020

FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo. The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network. Mining of the magnetite will... Read more...

Roy Hill 1 Iron Ore Mining Stage 2

Last updated: September 30, 2020

Proposal to mine iron ore from the Stage 2 project area on the southern slopes of the Chichester Range and develop a remote borefield and pipeline by Roy Hill Iron Ore Pty Ltd (RHIO). Read more...

Mesa H Proposal (Revision to Mesa J Iron Ore Development)

Last updated: July 9, 2020

Robe River Mining Co. Pty Limited (the proponent) proposes to develop the Mesa H deposit to sustain its iron ore production operations within the Robe Valley, Pilbara. The proposal is located approximately 16 km south west of Pannawonica. The proposal would include a total disturbance of 2,200 hectares to develop above and below water table open cut iron ore pits and associated infrastructure, including water management infrastructure. The proposal is located adjacent to the existing Mesa J... Read more...

Buckland Project

Last updated: April 28, 2020

To develop and operate an iron ore mine, processing facilities and supporting infrastructure, 45 km south-south-east of Pannawonica in the Shire of Ashburton, and a 176 km haul road from the mine site to the customer delivery point near Cape Preston. Read more...

Brockman Syncline 4 Iron Ore Project – Marra Mambas Proposal

Last updated: April 6, 2020

Hamersley Iron Pty Limited propose to expand its existing Brockman 4 Syncline Iron Ore Mine. The expansion would include further clearing of up to 4,800 hectares and expand its current development envelope by 2,567 hectares. Additional dewatering would also take place resulting in dewater discharge extending further along Boolgeeda Creek by nine kilometres. Read more...

Mining Area C - Southern Flank

Last updated: January 15, 2020

The proposal is to revise the Mining Area C operation (located approximately 90km WNW of Newman) to include a new satellite ore body which is located approximately 8 km to the south of the existing approved Mining Area C operations. The revised proposal would require the additional clearing of approximately 19,850 hectares of vegetation and mining below the water table. Read more...

Revised Iron Valley Iron Ore Project

Last updated: November 26, 2019

The Proposal is located within the Pilbara Interim Biogeographic Regionalisation for Australia (IBRA) region and is located within the Fortescue and Hamersley IBRA subregions. The Approved Project (authorised by Ministerial Statement 933 , 1 February 2013) is an above the water table open cut mine and associated infrastructure, located on mining tenement M470/1439. This proposal is to mine below the water table. Read more...

Mesa A Hub Revised Proposal

Last updated: August 21, 2019

Robe River Mining Co Pty Ltd is seeking to extend the existing Mesa A / Warramboo Iron Ore Mining Project by extending the existing mining operation and developing four new nearby deposits. The proposal is 43 kilometres west of Pannawonica in the Pilbara Region. The proposal would require an additional 3000 hectares of clearing of native vegetation, with some below water table mining. A water supply would also be required and discharge of any excess water to Warramboo Creek. Read more...

Eliwana Iron Ore Mine

Last updated: August 14, 2019

Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price. Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years. The proposal involves the clearing of up to 8,560 ha of native... Read more...

Christmas Creek Iron Ore Mine Expansion

Last updated: July 8, 2019

The proposal is to revise the existing Pilbara Iron Ore and Infrastructure Project: East-West Railway and Mine Sites Stage B located approximately 70 to 100 km north of Newman in the Pilbara region of Western Australia. The proposal includes mines and associated infrastructure at Christmas Creek and Mindy Mindy, and an east-west railway to link the Stage A north-south railway (to Port Hedland) to the Christmas Creek Mine. The revision includes modification/expansion or development of additional... Read more...

Flinders Pilbara Iron Ore Project – Stage 1 (s46)

Last updated: November 20, 2017

Read more...

Solomon Iron Ore Project Expansion

Last updated: December 7, 2016

Fortescue Metals Group Limited is proposing to increase the footprint and mining life of the Solomon Iron Ore Project. The proposal consists of expanding mining operations and rail infrastructure beyond the current footprint. Fortescue Metals Group Limited is also seeking approval for an external borefield to provide an additional water supply to support the expansion. The extent of proposed ground disturbance is approximately: 11,322 hectares for the mine expansion within a development... Read more...

Yandicoogina Iron Ore Project – Pocket and Billiard South deposits

Last updated: November 8, 2016

The proposal is an expansion of an existing approved proposal: Yandicoogina Iron Ore Project ( Ministerial Statement 914 ) to develop iron ore deposits at Junction Central, Junction South East, Junction South West and Oxbow, located in the central Pilbara region of Western Australia, on mining lease 274SA. The proposal is located within the Pilbara Interim Biogeographic Regionalisation for Australia (IBRA) region and is located within the Fortescue and Hamersley IBRA subregions. Read more...

Jimblebar Iron Ore Project (s. 46)

Last updated: June 1, 2016

The proposal involves an extension to the Wheelarra Hill open pits and overburden storage areas, and the mining of the South Jimblebar and Hashimoto deposits, with disposal of overburden into adjacent Overburden Storage Areas (OSAs) and in-pit disposal. Inquiry under s46 related to Ministerial Statement 857, the subject of EPA Report 1371. Read more...

Yandicoogina Iron Ore Project - Expansion to include Junction South West and Oxbow Deposits

Last updated: March 3, 2016

The proposal includes the existing Hamersley Yandicoogina iron ore project and proposed expansion. The existing project includes open pit mining at the Junction Central and Junction South East operations and associated infrastructure, dewatering activities, closure and rehabilitation. The expansion includes the development of new pits at Junction South West and Oxbow, temporary waste landforms, the development of new infrastructure, additional dewatering and water disposal activities. The... Read more...

Orebody 31 Iron Ore Mine

Last updated: November 12, 2015

The proposal is to construct and operate an open-cut iron ore mine, and associated infrastructure, approximately 40 kilometres (km) east of Newman. Read more...

Nammuldi-Silvergrass Expansion Project

Last updated: July 10, 2015

The proposal involves the expansion of existing operations of the Nammuldi-Silvergrass Iron Ore Project and is therefore a Revised Proposal.The proposal includes the additional clearing of approximately 3,900 ha of vegetation for mine pits, waste dumps and associated mine infrastructure and facilities, and approximately 2,500 ha for the IAA. Read more...

Solomon Iron Ore Project

Last updated: October 15, 2014

Fortescue Metals Group Limited (Fortescue) proposes to develop two new mines within the Solomon Project, a greenfield site approximately 60 kilometres (km) north of Tom Price and adjacent to the North Eastern boundary of the Karijini National Park, and to construct a 127 km railway from the new mines eastwards to the existing Fortescue railway. Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
+618 6364 7000
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2022 Government of Western Australia. All rights reserved.