Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions
      • Ministerial Statements
      • Ministerial decisions (s45(8))

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chairman's Determinations

    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • (-) Remove Infrastructure filter Infrastructure
  • Iron Ore (16) Apply Iron Ore filter
  • Industrial (1) Apply Industrial filter
  • Oil and gas (1) Apply Oil and gas filter

Filter by current status:

  • Ministerial Statement published (40) Apply Ministerial Statement published filter
  • Awaiting Ministerial decision (2) Apply Awaiting Ministerial decision filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter
  • Decision on whether to assess has been published (1) Apply Decision on whether to assess has been published filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter

Filter by relevant environmental factors:

  • (-) Remove Flora and Vegetation filter Flora and Vegetation
  • (-) Remove Hydrological Processes filter Hydrological Processes
  • (-) Remove Terrestrial Fauna filter Terrestrial Fauna
  • Inland Waters Environmental Quality (38) Apply Inland Waters Environmental Quality filter
  • Social Surroundings (30) Apply Social Surroundings filter
  • Air Quality (12) Apply Air Quality filter
  • Terrestrial Environmental Quality (11) Apply Terrestrial Environmental Quality filter
  • Subterranean Fauna (9) Apply Subterranean Fauna filter
  • Marine Environmental Quality (7) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (6) Apply Benthic Communities and Habitats filter
  • Marine Fauna (5) Apply Marine Fauna filter
  • Landforms (3) Apply Landforms filter
  • Coastal Processes (2) Apply Coastal Processes filter

Filter by Proponent:

  • Fortescue Metals Group Limited (5) Apply Fortescue Metals Group Limited filter
  • Main Roads WA (3) Apply Main Roads WA filter
  • Main Roads Western Australia (3) Apply Main Roads Western Australia filter
  • API Management Pty Limited (2) Apply API Management Pty Limited filter
  • Fortescue Metals Group Ltd (2) Apply Fortescue Metals Group Ltd filter
  • Grange Resources Limited (2) Apply Grange Resources Limited filter
  • Hamersley Iron Pty Limited (2) Apply Hamersley Iron Pty Limited filter
  • Oakajee Port and Rail Pty Ltd (2) Apply Oakajee Port and Rail Pty Ltd filter
  • Public Transport Authority (2) Apply Public Transport Authority filter
  • Water Corporation (2) Apply Water Corporation filter
  • Australian Methanol Company Pty Ltd (1) Apply Australian Methanol Company Pty Ltd filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Brockman Iron Pty Ltd (1) Apply Brockman Iron Pty Ltd filter
  • Commissioner of Railways (1) Apply Commissioner of Railways filter
  • Cranford Pty Ltd (1) Apply Cranford Pty Ltd filter
  • Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited (1) Apply Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited filter
  • Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Ltd (1) Apply Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Ltd filter
  • Ferro Metals Australia Pty Ltd (1) Apply Ferro Metals Australia Pty Ltd filter
  • FMG (1) Apply FMG filter
  • Griffin Power 3 Pty Ltd (1) Apply Griffin Power 3 Pty Ltd filter
  • Iron Ore Holdings Ltd (1) Apply Iron Ore Holdings Ltd filter
  • Karara Mining Limited (1) Apply Karara Mining Limited filter
  • Lanco Resources Australia Pty Ltd (1) Apply Lanco Resources Australia Pty Ltd filter
  • Macarthur Minerals Limited (1) Apply Macarthur Minerals Limited filter
  • Main Roads (1) Apply Main Roads filter
  • PIOP Mine Co NL (1) Apply PIOP Mine Co NL filter
  • Point Grey Development Company Pty Ltd (1) Apply Point Grey Development Company Pty Ltd filter
  • Subsea 7 Australia Contracting PTY LTD (1) Apply Subsea 7 Australia Contracting PTY LTD filter
  • The Minister for State Development (1) Apply The Minister for State Development filter
  • Water Corporation of Western Australia (1) Apply Water Corporation of Western Australia filter

Filter by region:

  • Pilbara (19) Apply Pilbara filter
  • Perth (14) Apply Perth filter
  • Mid West (3) Apply Mid West filter
  • Great Southern (2) Apply Great Southern filter
  • Peel (2) Apply Peel filter
  • South West (2) Apply South West filter
  • Goldfields Esperance (1) Apply Goldfields Esperance filter
  • Kimberley (1) Apply Kimberley filter
  • Wheatbelt (1) Apply Wheatbelt filter

Filter by last updated:

  • 2022 (1) Apply 2022 filter
  • 2020 (5) Apply 2020 filter
  • 2019 (5) Apply 2019 filter
  • 2018 (3) Apply 2018 filter
  • 2017 (1) Apply 2017 filter
  • 2016 (4) Apply 2016 filter
  • 2015 (1) Apply 2015 filter
  • 2014 (3) Apply 2014 filter
  • 2013 (4) Apply 2013 filter
  • 2012 (2) Apply 2012 filter
  • 2011 (7) Apply 2011 filter
  • 2010 (1) Apply 2010 filter
  • 2009 (2) Apply 2009 filter
  • 2008 (1) Apply 2008 filter
  • 2006 (1) Apply 2006 filter
  • 2005 (1) Apply 2005 filter
  • 2004 (1) Apply 2004 filter
  • 2002 (2) Apply 2002 filter
  1. Home
  2. Proposal search
  3. Hydrological Processes
  4. Flora and Vegetation
  5. Terrestrial Fauna
  6. Infrastructure

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Thornlie-Cockburn Link

Last updated: May 4, 2022

The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford and... Read more...

Yanchep Rail Extension: Part 1 – Butler to Eglinton

Last updated: October 12, 2020

The Public Transport Authority (PTA) proposes to extend the existing Joondalup railway line by 7.3 kilometres from Butler Station to the suburb of Eglinton in the City of Wanneroo. The proposal is to construct and operate the rail extension and includes two new intermodal (rail, bus, ‘park and ride’, ‘kiss and ride’, walk and cycle) transit stations at Alkimos and Eglinton. The PTA will operate train services between Perth and Eglinton Stations and bus services from the Alkimos and Eglinton... Read more...

Flinders Pilbara Iron Ore Project – Stage 1

Last updated: October 5, 2020

The proposal is to develop and operate an iron ore mine on the Blacksmith tenement located approximately 70 km north-west of Tom Price in the Pilbara region of Western Australia. Read more...

Roe Highway Extension (s46) [2164]

Last updated: August 6, 2020

Section 46 change to conditions - Inquire into the suitability of the implementation conditions and whether any of them should be changed. Read more...

Great Northern Highway Muchea to Wubin Upgrade – Stage 2 - Bindoon Bypass

Last updated: July 6, 2020

The proposal is to construct and operate a new 48 km section of the Great Northern Highway within the Shire of Chittering. The proposal would bypass the town of Bindoon located approximately 70 km north east of Perth, Western Australia. The Proposal would consist of a combination of four lane dual carriageway, four lane single carriageway and two lane single carriageway and would divert from the existing GNH at the Chittering Roadhouse running west of Bindoon and re-joining the GNH between Hay... Read more...

Buckland Project

Last updated: April 28, 2020

To develop and operate an iron ore mine, processing facilities and supporting infrastructure, 45 km south-south-east of Pannawonica in the Shire of Ashburton, and a 176 km haul road from the mine site to the customer delivery point near Cape Preston. Read more...

Eliwana Railway Project

Last updated: August 14, 2019

Fortescue Metals Group Limited proposes to build a 120 km railway linking their existing Solomon Mine with their proposed Eliwana Iron Ore Mine, located 90 km west-northwest of Tom Price (Shire of Ashburton). The eastern section of the proposed Eliwana Railway Project development envelope is adjacent to Karijini National Park. Proposed Infrastructure within the Rail Development Envelope includes: Railway and associated embankment; Rail loop; Crossing/passing loops; Railway overpass; Train... Read more...

Christmas Creek Iron Ore Mine Expansion

Last updated: July 8, 2019

The proposal is to revise the existing Pilbara Iron Ore and Infrastructure Project: East-West Railway and Mine Sites Stage B located approximately 70 to 100 km north of Newman in the Pilbara region of Western Australia. The proposal includes mines and associated infrastructure at Christmas Creek and Mindy Mindy, and an east-west railway to link the Stage A north-south railway (to Port Hedland) to the Christmas Creek Mine. The revision includes modification/expansion or development of additional... Read more...

Cloudbreak Life of Mine Expansion

Last updated: June 6, 2019

The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...

Learmonth Bundle Site

Last updated: May 15, 2019

Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...

Coastal Road from Lancelin to Cervantes

Last updated: January 7, 2019

Read more...

Roe Highway Stage 8 Extension

Last updated: December 12, 2018

The proposal is to construct and operate a dual carriageway road from the current terminus of Roe Highway at Kwinana Freeway in Jandakot to Stock Road in Coolbellup., Note:, The decision of the Supreme Court of Western Australia in, Save Beeliar Wetlands (Inc) and Anor v. Jacob, [2015] WASC 482 was overturned by the Court of Appeal on Friday 15 July 2016 in, Access the Court of Appeal decision, Jacob v Save Beeliar Wetlands (Inc), [2016] WASCA 126. The effect of the Court of Appeal decision is... Read more...

Perth Groundwater Replenishment Scheme Stage 2

Last updated: December 4, 2018

The proposal is to duplicate the existing Advanced Water Recycling Plant (AWRP) at the Beenyup facility in Craigie. The proposal also includes the construction of two water recharge sites and pipeline infrastructure along a 12.8 km route through the suburbs of Woodvale, Wanneroo, Ashby and Neerabup to recharge approximately 14 GL of recycled water to the Leederville and Yarragadee aquifers. The proposal forms Stage 2 of the Perth Groundwater Replenishment Scheme (GRWS) with the expansion of 14... Read more...

West Pilbara Iron Ore Project Stage 2 - Hardey Proposal

Last updated: November 12, 2018

The proposal is to develop and operate an iron ore mine approximately 50 km west-northwest of Paraburdoo, Western Australia, a 20 km long gas pipeline corridor, and a 150 km long rail transport corridor that would connect the proposed mine to the West Pilbara Iron Ore Project Stage 1 infrastructure. Read more...

Perth Darwin National Highway (Swan Valley Section)

Last updated: June 6, 2017

The proposal is to construct and operate a freeway-standard dual carriageway between the Reid Highway/Tonkin Highway junction and the Great Northern Highway at Muchea. Read more...

Mangles Bay Marine Based Tourist Precinct

Last updated: December 7, 2016

The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...

Bunbury Berth 14A Expansion Project

Last updated: December 6, 2016

The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...

Ellenbrook Bus Rapid Transit

Last updated: September 12, 2016

The Commissioner for Main Roads Western Australia proposes to construct and maintain the Ellenbrook Bus Rapid Transit to provide a dedicated busway from the Ellenbrook town centre to Reid Highway.  It involves the construction of: approximately 10 kilometres of dedicated busway; grade separations of the busway at road crossings; upgrades of all existing intersections;  three bus stations with Park and Ride facilities; realignment of Lord Street from Reid Highway to Youle-Dean Road and from Park... Read more...

Yandicoogina Iron Ore Project - Expansion to include Junction South West and Oxbow Deposits

Last updated: March 3, 2016

The proposal includes the existing Hamersley Yandicoogina iron ore project and proposed expansion. The existing project includes open pit mining at the Junction Central and Junction South East operations and associated infrastructure, dewatering activities, closure and rehabilitation. The expansion includes the development of new pits at Junction South West and Oxbow, temporary waste landforms, the development of new infrastructure, additional dewatering and water disposal activities. The... Read more...

Orebody 18 Iron Ore Mine (s46)

Last updated: August 7, 2015

The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...

Pages

  • 1
  • 2
  • 3
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
+618 6364 7000
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2022 Government of Western Australia. All rights reserved.