This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 17, 2008
The proposal is to develop a new iron ore mine approximately 60 kilometres west-north-west of Tom Price and 25 kilometres south-west of the existing Brockman 2 mine. The major components of the project include: Three new mine pits- with approximately 20% of the orebody occurring below the water table; Dry processing plant- including crushers, overland conveyor and screens; this will be located to the north of the pits running east/west to the rail loop; Associated mine infrastructure- this... Read more...Last updated: May 7, 2008
Mr H J Hawke proposes to subdivide Lot 2 Ellenbrook Road, Bullsbrook, into 8 lots of approximately 2 hectares (ha) each and a service road, for rural residential purposes. The land, which is located within the Environmental Protection (Western Swamp Tortoise) Policy area, covers an area of approximately 17.15 ha and is adjacent to the Ellen Brook. A Conservation Category Wetland (CCW)s and Bush Forever Site 296 extend along and into the eastern boundary of the property. Read more...Last updated: February 25, 2008
The implementation of a one-year, pilot scale yellowfin tuna seacage aquaculture trial in the Zeewijk Channel, Abrolhos Islands (approximately 75 kilometres west of Geraldton). Read more...Last updated: February 7, 2008
Proposal to carry out an onshore 3D seismic survey, 20 kilometres west of Brand Highway, northwest of Cataby in the Shire of Dandaragan, by Empire Oil Company (WA) Limited Read more...Last updated: August 9, 2007
The installation of a wet compression system and associated infrastructure within the existing Kemerton Power Station, and the construction of evaporation ponds and a water pipeline to deliver water from an existing offtake located about 4 kilometres to the east. The wet compression system will enable the power station to generate additional power at ambient temperatures above International Standards Organisation conditions by eliminating the sensitivity of the installed gas turbines to ambient... Read more...Last updated: November 29, 2006
This proposal is for the Development of Industrial Land on the Burrup Peninsula. The proposed site is designated Industrial Lease Area A (Site A). Approval would allow Woodside Energy Ltd to undertake limited site preparation activities for the future installation of infrastructure, such as LNG and condensate storage tanks, which would be needed should the proposed Pluto LNG Development be allowed to proceed. Read more...Last updated: November 17, 2006
The proposal is for the remaining life of the mine (50+ years), located west of Jimblebar Creek on Mining Lease 266SA. It entails increasing the iron ore production rate at the mine from 8 million tonnes per annum (Mtpa) to approximately 12Mtpa, and the mining of the currently undeveloped deposits on either side of the existing operation, including both in-situ hard rock and detrital ores. Approximately 600 million tonnes of Marra Mamba iron ore have been identified within the mining envelope.... Read more...Last updated: June 29, 2006
The proponent proposes to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are nine separate looping sections proposed from CS 1 south of Karratha, to CS 9, north of Gingin. Looping is a process of duplicating an existing pipeline between compressor stations for a certain distance. Once the specified distance is reached, it then ties back to the parallel pipeline. This design... Read more...Last updated: May 25, 2006
The proposal is for residential development on the East Clontarf site, approximately 18ha in size. The site is bounded by Manning Road, Centenary Avenue and the Canning River. It is zoned Urban in the Metropolitan Region Scheme (MRS) and Residential in the City of South Perth Town Planning Scheme. The foreshore area adjacent to the proposed development is identified for protection as Bush Forever site 333 and reserved for Parks and Recreation in the MRS. Read more...Last updated: March 28, 2006
The proposal is for the developing of mining operations at the areas of Trilogy and Kundip, construction of a haul road, construction and operation of a processing plant, and disposal of tailings at the RAV 8 site. Read more...Last updated: December 28, 2005
The proposal is to construct and operate a 23-kilometre pipeline from Kwinana Junction, in Kwinana to Hopelands (between Punrak Road and Henderson Road). This proposal is known as the Southern Looping Project, and comprises loop 10. The proponent has also referred a proposal to construct and operate a 194-kilometre pipeline from Compressor Station 1 south of Karratha, to Compressor Station 9, north of Gingin. This proposal, known as the Northern Looping Project , and comprising loops 1 to 9,... Read more...Last updated: November 29, 2005
The proposal is to construct and operate a pipeline to supply gas to the Kemerton Power Station (located approximately 22km north east of Bunbury nearby the Kemerton Industrial Estate) and to construct a meter station at the power station site. The proposed pipeline would be 5km long and would connect to the DBNGP at MLV 154/155 and then run parallel to the existing DBNGP until it deviates west to supply the Kemerton Power Station. The proposed pipeline would be installed in the existing 16-... Read more...Last updated: July 8, 2005
The proposal is to construct a marina, resort and residential/ canal development as a land backed extension to the Exmouth Boat Harbour immediately south of the Exmouth township. Read more...Last updated: March 4, 2005
The proposal is to construct and operate the South West Metropolitan Railway from Perth to Mandurah. The proposal includes the establishment of rail infrastructure between Perth and Mandurah with the northern section of the line running from the Perth Central Business District to Anketell tunnel via the Kwinana Freeway. South of the Anketell tunnel, the proposed railway passes through the local government areas of the Town of Kwinana, the City of Rockingham and the City of Mandurah, and... Read more...Last updated: September 20, 2004
Proposal to subdivide approximately 89 hectares of land being Lot 502 bounded by North Lake, Phoenix and Sudlow Roads and a rail reserve, for industrial and mixed business purposes. The proponent for the proposal is the Western Australian Land Authority trading as LandCorp (LandCorp). Read more...Last updated: June 25, 2004
Proposal by the Water Corporation to construct a Water Treatment Plant in Mundaring and Water Storage Tanks in Sawyers Valley. Read more...Last updated: May 27, 2004
Inquiry under section 46 of the, Environmental Protection Act 1986, to the Telfer Project power suppy and infrastruction corridor.The recommended change to the environmental conditions of Ministerial Statement 605 will reduce the length of open trench permitted for the approved project from 60 km to 20 km and accordingly reduce the level of fauna mortality experienced during the construction of the pipeline. Read more...Last updated: December 4, 2003
The Conservation Commission of Western Australia has prepared through the agency of the Department of Conservation and Land Management, a Proposed Forest Management Plan to apply to the Swan, South West and Warren Regions of the Department of Conservation and Land Management during 2004-2013. This is the EPA's assessment of the environmental factors relating to the proposed plan and the Authority's advice and recommendations to the Minister for Environment. Read more...Last updated: November 24, 2003
Proposal by Hamersley Iron to increase the capacity of its Dampier Port operations from 80 million tonnes per annum (Mtpa) (licensed capacity) to 95 Mtpa. Read more...Last updated: November 3, 2003
Proposal by Mr B Sorgiovanni to clear approximately 1128 hectares (ha) of native vegetation for agriculture on Victoria Location 10877 corner of Garibaldi-Willis and Willmott Roads, approximately 47 kilometres west of Coorow. Read more...