This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 4, 2012
The proposal is for mining of iron ore below the watertable from the Orebody 23 deposit on the Ophthalmia Range, including de-watering operations, approximately 13 kilometres north-east of Newman, Shire of East Pilbara. Read more...Last updated: October 22, 2012
To develop an open-cut vanadium mine and process plant at Barrambie, 75 kilometres north-west of the Sandstone townsite and 116 kilometres south-east of Meekatharra Read more...Last updated: October 18, 2012
The proposal is for construction of up to 100 wind turbines each up to 152 metres (m) high, with a capacity of up to 250 Megawatts and all associated infrastructure: electricity transformers; underground cabling; access tracks, all weather access to Garibaldi Willis Road; crane hardstands; a substation compound including a metering building, site office and workshop and a communication mast. The proposal location is 15 km north-east of Warradarge, Shire of Coorow and Shire of Carnamah. Read more...Last updated: September 10, 2012
The proposal is for exploration activities on mining leases E47/1301, E47/1302, E47/1196 and E47/2037, approximately 75 km north-west of Tom Price, Pilbara region. Read more...Last updated: August 1, 2012
The proposal is for the construction of an onshore marina (and associated boating infrastructure e.g. boat pens, jetties, navigational aids, entrance channel, protective groynes, public boat ramps and car parks) on the western side of the Point Grey peninsula. The proposal also includes the construction of a 2.5 kilometre navigation channel across the Harvey Estuary from the marina to the Dawesville Channel. Read more...Last updated: July 6, 2012
The proposal is to mine iron ore from the Stage 1 project area on the southern slopes of the Chichester Range and develop associated mining infrastructure. Inquiry under s46 into request to change condition 9 of Ministerial Statement 824 - Short-Range Endemic Invertebrates. Read more...Last updated: June 19, 2012
The proposal is to construct and operate approximately 70 km of duplicate rail line and supporting infrastructure from the Cape Lambert Port facilities to Emu Siding. Read more...Last updated: May 22, 2012
The project site is located approximately 15 kilometres south of Eneabba in the Shires of Coorow and Carnamah, Western Australia. The CWC Project involves open cut mining and supply of approximately 75 Mt of sub-bituminous grade coal to the proposed Coolimba Power Station at a rate of 2 to 2.5 Mtpa over 30 years. The South Eneabba Nature Reserve is at the southern end, east of the proposed mine, while the Lake Logue Nature Reserve is towards the northern end and on the western side of the... Read more...Last updated: April 2, 2012
The proposal is to expand Fortescue Metals' current operations within the Pilbara region, Western Australia to include the development of a new iron ore project, known as the Io Project, which is located within the Nyidinghu Study Area. The Project is located on Marillana Station approximately 40 kilometres (km) south of Fortescue’s Cloudbreak operations and approximately 100 km north-west of Newman. The major components of the Project are: An iron ore mine and resource comprising Brockman... Read more...Last updated: March 28, 2012
The original proposal, as set out in the proponent’s PER, comprised four iron ore mines in the Pilbara region, an ore beneficiation plant, a borefield, an accommodation village and 160km of east-west railway connecting to the north-south link to Port Hedland. Since release of the PER, FMG has made several major modifications to the proposal: the proposed mines at Mt Lewin and Mt Nicholas have been excised; the connecting infrastructure to those minesites is not now needed, leading to a change... Read more...Last updated: March 28, 2012
The proposal is to construct and operate a second port (Port B) at Cape Lambert to process and export up to 130 million tonnes of ore per annum. Read more...Last updated: March 12, 2012
The proposal is for the mining of a 53-hectare area and processing of approximately 1.3 million tonnes of gypsum recovered from Mining Lease 70/1161 using the facilities currently employed for operations in the adjacent Mining Lease 70/750. The proposal involves dredging and will form a permanent hypersaline water body of approximately four metres maximum depth. Dredging operations are proposed to be undertaken every second year over a 2 to 4 week period to excavate approximately 100,000 tonnes... Read more...Last updated: January 17, 2012
The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...Last updated: January 9, 2012
The proposal consists of a designated mining area containing two open pits, integrated waste and tailings landform, ore beneficiating plant and workshops, a combined gas pipeline spur and water pipe corridor, a services (possible water, gas, power transmission) corridor to Weld Range, the Byro Sub-basin Borefield and the Murchison Palaeochannel Borefield, a power station, airstrip, village and ancillaries. The Jack Hills Expansion Project is contiguous with the Stage 1 mine. Read more...Last updated: November 24, 2011
The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...Last updated: November 22, 2011
The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...Last updated: October 24, 2011
The proposal is to develop and operate an open pit nickel mine and associated infrastructure on Mining Lease 77/00583 and haulage road on Mining Lease 77/00545 within the Shire of Kondinin. Read more...Last updated: August 5, 2011
The proposal is to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are eleven separate looping sections proposed from south of Dampier to Wagerup West. Read more...Last updated: August 1, 2011
The proposal is to increase the mine dewatering rate up to 50 Gigalitres per annum and to inject surplus water into two brackish and one saline injection zones at the Christmas Creek Mine. Read more...Last updated: May 30, 2011
The proposal is to subdivide lots 1000, 2240, 2275, 2657 and 3045 Preston Beach Road, Lake Clifton. The proposal was withdrawn from the WAPC during the appeals process, thus no Ministerial decision was required. Read more...