This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: July 27, 2017
Tungsten Mining NL proposes to extract and process tungsten and molybdenum from the Mulgine Hill and Mulgine Trench deposits at Mount Mulgine over a period of 15 years. The proposal is located approximately 15 km north east of Rothsay, within the Shire of Perenjori. The proposal is partially located: on M59/425, which was previously mined for gold as part of the Minjar Gold Mine Project within the former Warriedar pastoral station, which is managed for conservation purposes by the Department of... Read more...Last updated: July 17, 2017
The proposal is to subdivide Lot 21 Webster Road, Forrestfield into seven (7) industrial lots as documented in Schedule 1 of Ministerial Statement 841 . The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions relating to the Industrial Subdivision of Lot 21 Webster Road Forrestfield proposal in order to extend the “Commencement and Time Limit of Approval” for substantial... Read more...Last updated: July 17, 2017
The proposal is for the development and operation of the Parker Range Project, located in the Mount Caudan section of the Parker Range within the Shire of Yilgarn. It includes the development and operation of an above and below the watertable greenfields iron ore mine and associated infrastructure. This is an inquiry under s46 into a request to extend the Time Limit of Authorisation of Ministerial Statement 892 . Read more...Last updated: June 6, 2017
The proposal is to construct and operate a freeway-standard dual carriageway between the Reid Highway/Tonkin Highway junction and the Great Northern Highway at Muchea. Read more...Last updated: May 22, 2017
In response to matters raised in the 7-day public comments on the referral, the proponent provided the following clarifying information: 1. Proponent consultation with the Shire of Irwin; 2. Rehabilitation Monitoring Report for the Redhill South 01 well site; 3. Proponent response to 7-day public comments. Read more...Last updated: April 10, 2017
Condition 3-1 of Ministerial Statement 906 requires the proponent to substantially commence the proposal within five years of the date of issue of the Statement (that is, before 1 August 2017). The proposal has not yet substantially commenced. The proponent for the proposal, Point Grey Development Company Pty Ltd, has requested an extension of the Time Limit of Authorisation (now referred to as “Time Limit for Proposal Implementation”) for substantial commencement to be extended to be... Read more...Last updated: April 3, 2017
The Western Australian Planning Commission and the City of Armadale propose to develop a water-based recreation park incorporating an international rowing course and other facilities including a residential component on land situated on Lake Road in the City of Armadale. Read more...Last updated: March 22, 2017
Westralian Iron Pty Ltd proposes to develop three bulk sample pits at Koolanooka South (Figure 1). The project site is located approximately 20 kilometres (km) due east of Morawa and 370 km north of Perth. Bulk sampling is required to assist with future planning and design for the proposed development and to provide sufficient material for a test regime to fully understand the characteristics of the ore to enable an efficient Magnetite processing plant to be designed. The bulk sampling... Read more...Last updated: January 25, 2017
The proponent proposes to extend its existing Yilgarn mining operations to include the Koolyanobbing Range F Deposit (the proposal), located on the southern Koolyanobbing Range, approximately 50 kilometres (km) north-east of the town of Southern Cross. Read more...Last updated: January 25, 2017
The proposal involves the development and operation of a 750 Mt iron ore mine, processing facility and associated infrastructure within mining leases M47/1414 and M47/1419. The project area is located approximately 100km north west of Newman in the Fortescue valley. The project area is approximately 15km south of the Fortescue Marsh, a wetland of national significance, and is intersected by Weeli Wolli Creek, which is a major Pilbara drainage system that discharges to the Marsh. Read more...Last updated: January 16, 2017
The proposal is to mine uranium ore from the Yeelirrie deposit, approximately 70 km south-west of Wiluna, and the construction of associated mine infrastructure, including ore processing facilities, water (includes borefield and corridors) abstraction and reinjection infrastructure, roads, accommodation, offices and workshops, stockpile and laydown areas and evaporation pond. Tailings would be discharged into the mine open pit. Read more...Last updated: January 12, 2017
Three Springs Solar Pty Ltd is proposing to construct and operate a 100MW solar photovoltaic power station on Lots M761-M764 and Lot 50 Bruce Road, approximately 2km north east of the Three Springs Townsite. The sites are predominately cleared farm land and no vegetation clearing is proposed. Read more...Last updated: January 9, 2017
Toro proposes to revise the Approved Project by developing Millipede and Lake Maitland uranium deposits and developing associated infrastructure. The Proposed Extension would result in the additional direct disturbance of approximately 1,582 hectares (ha) within an additional Development Envelope of approximately 3,891 ha. The Proposed Extension would include open mine pits at Millipede and Lake Maitland, in-pit tailings storage facility (TSF) at Millipede, accommodation village, workshop, run-... Read more...Last updated: January 9, 2017
Lost Sands Pty Ltd (Lost Sands) proposes to develop and operate the Cyclone Mineral Sands Project, located on the northern margin of the Eucla Basin, approximately 317 kilometres (km) north of Eucla and 220 km north of the Trans-Australia Railway. The proposal is for a mining operation to produce zircon and two high titanium mineral products. The conceptual layout of the mine includes open cut pits, mining and processing infrastructure, airstrip, camp and bore fields. The proposal is located in... Read more...Last updated: December 30, 2016
The proposal is to expand existing open-cut and underground gold mining developments within a defined project area on the surface of Lake Lefroy, approximately 20 kilometres south east of Kambalda. The proposal includes the discharge of dewatering to the lake’s surface and the construction of associated mining infrastructure (including open pits and waste rock dumps). Read more...Last updated: December 21, 2016
Note: In the matter of The Wilderness Society of WA (Inc) –v- Minister for Environment [2013] WASC, the Supreme Court of Western Australia found the Minister’s agreement decision invalid because the EPA’s decision to report was invalid., The proposal is a strategic environmental assessment for a common user LNG hub precinct for future Browse Basin gas processing in the Kimberley Region. Read more...Last updated: December 20, 2016
Mineral Resources Limited (the proponent) proposes to construct and operate a Pilbara Bulk Ore Transportation System (BOTS), and associated infrastructure. The BOTS extends 330 kilometres from the Iron Valley mine site tenement boundary (M47/1439) to the Port Hedland Pilbara Port Authority boundary. Read more...Last updated: December 16, 2016
The proposal is to mine four poly-metallic deposits containing commercial concentrations of uranium and to produce uranium oxide concentrate and other metal concentrates including copper, zinc, nickel and cobalt, approximately 240km east-northeast of Kalgoorlie. The proposal also includes the construction of associated mine infrastructure consisting of mine dewatering and reinjection infrastructure (including borefields and pipelines), non-mineralised overburden landforms, run of mine stockpile... Read more...