This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 17, 2008
The proposal is to develop a new iron ore mine approximately 60 kilometres west-north-west of Tom Price and 25 kilometres south-west of the existing Brockman 2 mine. The major components of the project include: Three new mine pits- with approximately 20% of the orebody occurring below the water table; Dry processing plant- including crushers, overland conveyor and screens; this will be located to the north of the pits running east/west to the rail loop; Associated mine infrastructure- this... Read more...Last updated: November 29, 2006
This proposal is for the Development of Industrial Land on the Burrup Peninsula. The proposed site is designated Industrial Lease Area A (Site A). Approval would allow Woodside Energy Ltd to undertake limited site preparation activities for the future installation of infrastructure, such as LNG and condensate storage tanks, which would be needed should the proposed Pluto LNG Development be allowed to proceed. Read more...Last updated: November 17, 2006
The proposal is for the remaining life of the mine (50+ years), located west of Jimblebar Creek on Mining Lease 266SA. It entails increasing the iron ore production rate at the mine from 8 million tonnes per annum (Mtpa) to approximately 12Mtpa, and the mining of the currently undeveloped deposits on either side of the existing operation, including both in-situ hard rock and detrital ores. Approximately 600 million tonnes of Marra Mamba iron ore have been identified within the mining envelope.... Read more...Last updated: May 25, 2006
The proposal is for residential development on the East Clontarf site, approximately 18ha in size. The site is bounded by Manning Road, Centenary Avenue and the Canning River. It is zoned Urban in the Metropolitan Region Scheme (MRS) and Residential in the City of South Perth Town Planning Scheme. The foreshore area adjacent to the proposed development is identified for protection as Bush Forever site 333 and reserved for Parks and Recreation in the MRS. Read more...Last updated: May 17, 2006
The proposal is for the development of a titanium minerals mine at Tutunup, approximately 20 km east of Busselton. The proposal has the following main components: disturbance of 120 hectares of mainly cleared agricultural land; construction of water and fines dams, and topsoil, tails and overburden stockpiles; dewatering and mining, using dry mining techniques at up to two million tonnes per annum; abstraction of groundwater from the Yarragadee aquifer for process use; haulage of the Heavy... Read more...Last updated: March 4, 2005
The proposal is to construct and operate the South West Metropolitan Railway from Perth to Mandurah. The proposal includes the establishment of rail infrastructure between Perth and Mandurah with the northern section of the line running from the Perth Central Business District to Anketell tunnel via the Kwinana Freeway. South of the Anketell tunnel, the proposed railway passes through the local government areas of the Town of Kwinana, the City of Rockingham and the City of Mandurah, and... Read more...Last updated: December 4, 2003
The Conservation Commission of Western Australia has prepared through the agency of the Department of Conservation and Land Management, a Proposed Forest Management Plan to apply to the Swan, South West and Warren Regions of the Department of Conservation and Land Management during 2004-2013. This is the EPA's assessment of the environmental factors relating to the proposed plan and the Authority's advice and recommendations to the Minister for Environment. Read more...Last updated: November 24, 2003
Proposal by Hamersley Iron to increase the capacity of its Dampier Port operations from 80 million tonnes per annum (Mtpa) (licensed capacity) to 95 Mtpa. Read more...Last updated: July 11, 2003
The proposal is for the first stage of a Coral Coast Resort (CCR), which includes tourist, residential and incidental commercial facilities centred around an inland marina, at the site called Mauds Landing. The CCR proposal envisages the establishment, in the first stage, of a marina, a caravan park, an interpretative centre, a back-packers facility, stage one of a resort complex, provision of utilities infrastructure and the preparation of land with services for sale at a later date. The CCR... Read more...Last updated: May 26, 2003
The proposal involves the construction and operation of a 30 GL desalination plant at one of two locations in the Kwinana Industrial Area. The alternative sites are at the Kwinana Power Station (KPS) or on the corner of Patterson and Office Roads, East Rockingham. Read more...Last updated: May 12, 2003
Cable Sands (WA) Pty Ltd proposal to develop a mineral sands mine in a section of State Forest No.2, near Ludlow. Read more...Last updated: December 20, 2002
Methanex proposes to develop a methanol complex on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay – Hearson Cove Industrial Area, approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. Approximately 84 hectares of the 100 hectare site will be cleared to accommodate the methanol complex. Read more...Last updated: December 20, 2002
The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...Last updated: December 18, 2002
This proposal relates to the establishment, by undertaking clearing and earthworks, of a section of the western portion of the Burrup East-West Corridor west of Burrup Road, for the installation of anticipated infrastructure services within it. Services to be potentially located in the proposed corridor include sealed conveyors, an inspection and maintenance track, pipelines, transmission lines and cables, and communications. Pipelines using this corridor are anticipated to carry liquid... Read more...Last updated: September 13, 2002
The proposal being assessed is for the diversion of 8 gigalitres a year (on average) (GL/yr) of unallocated water resources in the Samson Catchment to be diverted for public water supply, the construction of a pipe head dam and related infrastructure. The Samson Brook Redevelopment Scheme is a key element of the Water Corporation’s drought recovery plan. Read more...Last updated: June 12, 2002
The proposal is to design and construct the extension of the Tonkin Highway from Mills Road West to South Western Highway. The proposal is approximately 32 km in length and includes the design, construction and use of a highway of six lanes from Mills Road West to Mundijong Road and four lanes from Mundijong Road to South Western Highway. Read more...Last updated: April 10, 2002
The proposal involves an expansion of the existing Dampier Public Wharf to provide improved facilities capable of servicing the future needs of industry in the area. The key components of the proposal are: construction of a 60-81 m long load-out facility south of the existing wharf; cut and fill operations to create a land backing to the facility (1.9 ha, of which 0.8 ha is reclaimed land); and quarrying of a 4.1 ha cargo lay-down and storage area. Read more...Last updated: February 6, 2002
The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains. The M2 Project is located near Kununurra within the Victoria-Bonaparte Biogeographic Region and the project area extends over approximately 76,000 ha of land comprising the Weaber, Keep River and Knox Creek Plains, and involves approximately equal areas within WA and the NT. The proposal has been assessed in two parts: biodiversity and management. This assessment is of the management component. See... Read more...Last updated: February 6, 2002
The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains. The M2 Project is located near Kununurra within the Victoria-Bonaparte Biogeographic Region and the project area extends over approximately 76,000 ha of land comprising the Weaber, Keep River and Knox Creek Plains, and involves approximately equal areas within WA and the NT. The proposal has been assessed in two parts: biodiversity and management. This assessment is of the biodiversity. See here for... Read more...Last updated: September 14, 2001
The proposal is for a large-scale nickel and cobalt mining and processing operation which will involve the mining and processing of up to 15 million dry tonnes per annum (Mtpa) of lateritic ore to produce approximately 60,000 tonnes per annum (tpa) of nickel and up to 8,000 tpa of cobalt. The ore will be mined at Marshall Pool, 55 km south-south-east of Leinster, and Lawlers, 10 km south of Leinster. Read more...