This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 4, 2013
This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for Environment on the proposal by the Shire of Manjimup to construct, operate and maintain a 6.5 kilometre (km) long all-weather, year-round access track from Windy Harbour Road to Nelson Location 7965, located entirely within the Doggerup Road reserve. Read more...Last updated: January 30, 2013
The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...Last updated: January 22, 2013
The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...Last updated: January 11, 2013
Brockman Iron Pty Ltd is proposing to construct a railway line and associated infrastructure in the Hamersley Iron province in the Pilbara region of Western Australia, approximately 100 kilometres (km) north west of Newman. The railway line would be approximately 79 km in length. The proposal will connect the previously approved Brockman Marillana Iron Ore Project ( Ministerial Statement 855 ) to the existing Fortescue Metals Group (FMG) railway line. Read more...Last updated: December 20, 2012
The proposal is for seven borrow pits in the Millstream Chichester National Park (MCNP) where up to 118 hectares (ha) will be disturbed, of which 90 ha is within the national park and the remainder in the excised rail corridor. All borrow pits within the MCNP are within existing Rio Tinto Iron Ore licence areas granted under the, Mining Act 1978, (Robe River Mining Company is a subsidiary of Rio Tinto) and all borrow material will only be used for projects or portions of projects that are... Read more...Last updated: December 17, 2012
Empire is proposing to conduct a 3D seismic survey over the Gingin Gas Fields including parts of the Boonanarring and Bartlett's Well nature reserves, utilising a helicopter assisted or 'heliportable' technique, transporting drilling and seismic receiver equipment by a long-line, suspended beneath a helicopter. The equipment is lowered into position and released at pre-programmed points. Charges are detonated one at a time and seismic data is recorded. Site remediation and site... Read more...Last updated: December 4, 2012
The proposal is for mining of iron ore below the watertable from the Orebody 23 deposit on the Ophthalmia Range, including de-watering operations, approximately 13 kilometres north-east of Newman, Shire of East Pilbara. Read more...Last updated: June 19, 2012
The proposal is to construct and operate approximately 70 km of duplicate rail line and supporting infrastructure from the Cape Lambert Port facilities to Emu Siding. Read more...Last updated: November 24, 2011
The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...Last updated: November 22, 2011
The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...Last updated: August 5, 2011
The proposal is to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are eleven separate looping sections proposed from south of Dampier to Wagerup West. Read more...Last updated: April 21, 2011
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. Read more...Last updated: March 14, 2011
The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...Last updated: March 11, 2011
The proposal is to mine hematite and magnetite iron ore from the Blue Hills North and Terapod deposits, and construction of associated mine infrastructure, upgraded access road to Morawa, Tilley Siding, and powerline corridor in the Midwest region of Western Australia. Read more...Last updated: January 20, 2011
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...Last updated: November 4, 2010
Identification of potential corridors and areas for future installation of water and waste water pipelines and associated infrastructure throughout the southern suburbs of Perth. Read more...Last updated: October 28, 2010
The proposal is to develop an iron ore mine at the Koolyanobbing Iron Ore Project-Mt Jackson J1 Deposit (Mt Jackson J1 Deposit), located approximately 110 kilometres (km) north-north-east of Southern Cross in the Shire of Yilgarn. The proposal includes two mine pits to extract approximately 33 million tonnes of iron ore and associated mining infrastructure. The proposed mine required disturbance of approximately 605 hectares (ha) of native vegetation for pits, associated mine infrastructure,... Read more...Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: June 30, 2010
The proposal is to construct and operate a minimum 50 GL/annum and up to 100 GL/annum desalination plant on Lots 32 and 33, and Part Lot 8 Taranto Road, Binningup; marine inlet/outlet pipes; and a water supply pipeline to transport potable water to the Integrated Water Supply Scheme via a storage facility near Harvey. Read more...Last updated: June 15, 2010
The strategic proposal is to: extend the Leeuwin Naturaliste National Park into the western part of Sussex Location 413; and develop the eastern part of Sussex Location 413 for tourism and residential purposes with associated public open space and foreshore reserves as generally depicted on the Development Guide Plan. Read more...