This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 24, 2021
Open cut dry mining of mineral sands and the processing of mined material through primary and secondary concentration plants and dry minerals separation. It includes the construction and operation of associated infrastructure and a modification to the intersection of Brand Hwy with Wannamal Road West. Read more...Last updated: January 22, 2021
Tronox Management Pty Limited proposes to develop the Cooljarloo West Titanium Minerals Project, 30 kilometres west from Cervantes, Shire of Dandaragan. The proposal involves the dredge mining of three orebodies: Woolka, Harrier and Kestrel. The proposal will require movement of the mining dredge and ore processing plant (concentrator) from the existing Cooljarloo Mine to Cooljarloo West and back again via flotation across an open channel. Read more...Last updated: March 28, 2019
The EPA has received a third party referral for the development and operation of a Class II or III Putrescible Landfill on a property known as Allawuna, within the Shire of York. The proponent has advised the EPA that only Class II waste will be accepted. The proposal is located on Lots 9926, 26934, 4869 and 5831 Great Southern Highway, Saint Ronans. The proposal has a nominal life expectancy of 37 years and will accept between 150,000 and 250,000 tonnes of waste each year. Read more...Last updated: April 29, 2013
The development and operation of a quarry. Inquiry under s46 to delete conditions 11, 12 and 17 of Ministerial Statement 706 and condition 6 of Ministerial Statement 872 . Read more...Last updated: March 12, 2012
The proposal is for the mining of a 53-hectare area and processing of approximately 1.3 million tonnes of gypsum recovered from Mining Lease 70/1161 using the facilities currently employed for operations in the adjacent Mining Lease 70/750. The proposal involves dredging and will form a permanent hypersaline water body of approximately four metres maximum depth. Dredging operations are proposed to be undertaken every second year over a 2 to 4 week period to excavate approximately 100,000 tonnes... Read more...Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...