This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 13, 2023
Mt Weld Mining Pty Ltd proposes to expand the Mt Weld Mine, which includes the construction and operation of a rare earths mine and processing plant, to its life of mine extent. The expansion proposes to increase the development envelope from the currently approved 505 hectares (ha) to 2,802 ha, to allow for expansion of infrastructure and activities, including: a staged transition from diesel fuelled power generation to gas hybrid renewable (including solar and battery energy storage, and... Read more...Last updated: February 9, 2023
Tellus Holdings Ltd are proposing to increase the tonnage of waste accepted at the Sandy Ridge Facility from the current approved (Ministerial Statement 1078) 100,000 tonnes per annum to up to 280,000 tonnes per annum for permanent isolation in the Site’s waste disposal cells. The Proposal will occur within the existing and approved development envelope as outlined in Ministerial Statement 1078 Read more...Last updated: January 23, 2023
Image Resources NL proposes to develop a mineral sands extraction project south of Orange Springs Road, Cowalla (Shire of Gingin). The proposal includes progressive and linear dredge mining of the sand resource operating over a 10-year period and the development of temporary waste dumps and tailings storage, processing facilities, solar drying ponds, water supply infrastructure and associated supporting infrastructure. The proposed mine disturbance area is approximately 950 hectares (ha) within... Read more...Last updated: December 23, 2022
Image Resources NL is seeking to develop a greenfields mineral sands project, located at Nambung, approximately 18 km east of Cervantes in the Wheatbelt region of Western Australia (WA). The proposal includes the progressive development of mine pits, processing facilities, groundwater bores and water management infrastructure, temporary waste dumps, solar drying ponds and associated infrastructure (power supply, communications, workshop, laydown, offices etc.). Two alternative mining methods... Read more...Last updated: December 22, 2022
Leichhardt Industrials Pty Ltd propose to develop the Eramurra Solar Salt project approximately 55 km west-south-west of Karratha in the Pilbara region of Western Australia. The proposal includes the development of a series of concentrator and crystalliser ponds and a processing plant. Supporting infrastructure includes seawater intake, bitterns outfall, desalination plant and groundwater bores, power supply and other infrastructure. Export of product would be via a previously approved trestle... Read more...Last updated: November 28, 2022
FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo. The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network. Mining of the magnetite will... Read more...Last updated: November 24, 2022
Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...Last updated: October 5, 2022
DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...Last updated: September 7, 2022
The proposal involves the construction and use of a landfill and associated infrastructure for receiving Class II and III waste of 150,000 to 250,000 tonnes per annum (tpa) over a period of 20 years. The proposal is located at Allawuna Farm, St Ronans, within the Shire of York. Read more...Last updated: August 29, 2022
South32 Worsley Alumina Pty Ltd currently operates the Boddington Bauxite Mine (located approximately 5km south-west of Boddington), Worsley Refinery (located approximately 15 km north-west of Collie) and port operations at the Bunbury Port. The new proposal is for the: · expansion of the existing mining area and incorporation of new mining areas; · development of a bauxite transport corridor; · development of a contingency mining area and maintenance work at the Refinery; and · development of... Read more...Last updated: August 24, 2022
The Proposal is located 210 km south of Port Hedland and 180 km north west of Newman in the Pilbara region of Western Australia. The proposal is located within a 40,653 ha Development Envelope and will require clearing of no more than 9,628 ha of native vegetation. The proposal includes, but is not limited to, the following: - The development of a series of above and below water table mine pits; - Ore processing facility; - Groundwater abstraction for water supply (for the mine and all... Read more...Last updated: May 30, 2022
AGI Operations Pty Limited propose to construct and operate a gas processing plant and pipeline associated with the development of the West Erregulla gas field, located approximately 230 kilometres (km) north-east of Perth, and 50 km south-east of Dongara, Western Australia. The processing plant will process gas produced from third party owned upstream wells. The processed gas will then be transported via a new interconnecting pipeline to the Dampier to Bunbury Natural Gas Pipeline (DBNGP). The... Read more...Last updated: May 16, 2022
Iluka proposes to develop the Tutunup Mineral Sands Project, located approximately 195 km south of Perth, and 17 km east of Busselton. The proposal involves mineral sands mining, including the development of mine pits, processing plant, dams for water and clay fines management, material stockpiles and associated supporting infrastructure. Up to 4.02 gigalitres of water would be required to support the proposal. Heay mineral concentrate would be transported for further processing at the Capel... Read more...Last updated: May 6, 2022
Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to twenty wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...Last updated: May 4, 2022
The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford and... Read more...Last updated: March 28, 2022
Remove Condition 2 (Proponent Commitments) if the proponent commitments in schedule 2 have been completed, are no longer relevant to the proposal or can be managed under Part V of the Environmental Protection Act 1986 (EP Act). Read more...Last updated: March 14, 2022
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: March 14, 2022
The Public Transport Authority (PTA) proposes to construct and operate a new 13 kilometre (km) dual railway track between Malaga and Ellenbrook. The proposed Malaga to Ellenbrook extends from the proposed Bayswater to Malaga railway line. The proposal includes three new stations at Malaga, Whiteman Park and Ellenbrook with intermodal rail, bus, carpark and active mode (cycling and walking) facilities at each station. A potential future station is also proposed at Bennett Springs and rail... Read more...Last updated: February 1, 2022
Lynas Kalgoorlie Pty Ltd (Lynas) propose to construct and operate a new Rare Earths Processing Facility at Lot 500 Great Eastern Highway, Yilkari and a By-product storage facility on Common Reserve 8767, Yarri Road, Parkerston in the City of Kalgoorlie-Boulder. The Rare Earths Processing Facility will process rare earth concentrate from the Mt Weld mine to produce a rare earth carbonate for export. Read more...Last updated: November 9, 2021
The proposal is to develop a mineral sand mine for the excavation and processing of a portion of the low-grade heavy mineral sand deposit, the Amy Zone, into a heavy mineral concentrate (HMC) in the Shark Bay district of Western Australia. The Amy Zone is approximately 35 km long, up to 3 km wide and 5 - 40 m thick. Read more...