Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions
      • Ministerial Statements
      • Ministerial decisions (s45(8))

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chairman's Determinations

    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidelines for planners and developers
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Infrastructure (3) Apply Infrastructure filter
  • Power generation (1) Apply Power generation filter
  • Waste management (1) Apply Waste management filter

Filter by current status:

  • Ministerial Statement published (3) Apply Ministerial Statement published filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter

Filter by relevant environmental factors:

  • (-) Remove Flora and Vegetation filter Flora and Vegetation
  • (-) Remove Social Surroundings filter Social Surroundings
  • (-) Remove Terrestrial Environmental Quality filter Terrestrial Environmental Quality
  • Terrestrial Fauna (3) Apply Terrestrial Fauna filter
  • Inland Waters Environmental Quality (2) Apply Inland Waters Environmental Quality filter
  • Air Quality (1) Apply Air Quality filter
  • Hydrological Processes (1) Apply Hydrological Processes filter
  • Inland Waters (1) Apply Inland Waters filter

Filter by Proponent:

  • Alkina Holdings Pty Ltd (1) Apply Alkina Holdings Pty Ltd filter
  • Coolimba Power Pty Ltd (1) Apply Coolimba Power Pty Ltd filter
  • Main Roads Western Australia (1) Apply Main Roads Western Australia filter
  • Western Power Corporation (1) Apply Western Power Corporation filter

Filter by region:

  • (-) Remove Wheatbelt filter Wheatbelt
  • Perth (1) Apply Perth filter

Filter by last updated:

  • 2020 (1) Apply 2020 filter
  • 2019 (1) Apply 2019 filter
  • 2010 (1) Apply 2010 filter
  • 2002 (1) Apply 2002 filter
  1. Home
  2. Proposal search
  3. Terrestrial Environmental Quality
  4. Flora and Vegetation
  5. Wheatbelt
  6. Social Surroundings

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Great Southern Landfill at Allawuna Farm Lots 4869, 5931, 9926 and 26934 Great Southern Highway, St Ronans

Last updated: August 10, 2020

The proposal involves the construction and use of a landfill and associated infrastructure for receiving Class II and III waste of 150,000 to 250,000 tonnes per annum (tpa) over a period of 20 years. The proposal is located at Allawuna Farm, St Ronans, within the Shire of York. Read more...

Coastal Road from Lancelin to Cervantes

Last updated: January 7, 2019

Read more...

Coolimba Power Station Project, Eneabba

Last updated: September 17, 2010

The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...

Transmission Line from Pinjar Gas Turbine to Cataby Substation

Last updated: August 21, 2002

The proposal is to build a transmission line with a maximum capacity of 330 kV from the Pinjar gas turbine station to the Cataby substation. The transmission line, which is primarily lattice tower construction up to 60 m high, traverses State Forest 65 South (Gnangara Park), Bush Forever Site 380, Gingin Stock Route Nature Reserve, State Forest 65 North and private property. The proposed line route is approximately 123 km long and involves the permanent clearing of up to approximately 2.9 ha of... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
+618 6364 7000
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2021 Government of Western Australia. All rights reserved.