Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • EPA Board Meetings
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Iron Ore (21) Apply Iron Ore filter
  • Infrastructure (14) Apply Infrastructure filter
  • Oil and gas (5) Apply Oil and gas filter
  • Industrial (4) Apply Industrial filter
  • Utilities (4) Apply Utilities filter
  • Gold (3) Apply Gold filter
  • Land use (3) Apply Land use filter
  • Copper (2) Apply Copper filter
  • Manganese (1) Apply Manganese filter
  • Mineral sands (1) Apply Mineral sands filter
  • Nickel (1) Apply Nickel filter
  • Rare earth elements (1) Apply Rare earth elements filter
  • Salt (1) Apply Salt filter

Filter by current status:

  • Ministerial Statement published (34) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (13) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (3) Apply Assessment has been terminated under s40A of the EP Act filter
  • Assessment on Proponent Information – Request for More Information published (1) Apply Assessment on Proponent Information – Request for More Information published filter
  • Response to submission published (1) Apply Response to submission published filter

Filter by relevant environmental factors:

  • (-) Remove Flora and Vegetation filter Flora and Vegetation
  • Terrestrial Fauna (44) Apply Terrestrial Fauna filter
  • Social Surroundings (28) Apply Social Surroundings filter
  • Subterranean Fauna (16) Apply Subterranean Fauna filter
  • Hydrological Processes (15) Apply Hydrological Processes filter
  • Inland Waters (14) Apply Inland Waters filter
  • Inland Waters Environmental Quality (14) Apply Inland Waters Environmental Quality filter
  • Air Quality (10) Apply Air Quality filter
  • Benthic Communities and Habitats (7) Apply Benthic Communities and Habitats filter
  • Marine Environmental Quality (6) Apply Marine Environmental Quality filter
  • Marine Fauna (6) Apply Marine Fauna filter
  • Terrestrial Environmental Quality (6) Apply Terrestrial Environmental Quality filter
  • Landforms (4) Apply Landforms filter
  • Coastal Processes (2) Apply Coastal Processes filter
  • Human Health (2) Apply Human Health filter
  • Greenhouse Gas Emissions (1) Apply Greenhouse Gas Emissions filter

Filter by Proponent:

  • Forge Resources Swan Pty Ltd (3) Apply Forge Resources Swan Pty Ltd filter
  • Atlas Iron Pty. Ltd. (2) Apply Atlas Iron Pty. Ltd. filter
  • BHP Billiton Iron Ore Pty Ltd (2) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Hamersley Iron Pty Limited (2) Apply Hamersley Iron Pty Limited filter
  • Main Roads WA (2) Apply Main Roads WA filter
  • Main Roads Western Australia (2) Apply Main Roads Western Australia filter
  • NW Interconnected Power Pty Ltd (2) Apply NW Interconnected Power Pty Ltd filter
  • PIOP Mine Co NL (2) Apply PIOP Mine Co NL filter
  • Public Transport Authority (2) Apply Public Transport Authority filter
  • ACH Minerals Pty Ltd (1) Apply ACH Minerals Pty Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • Austral Bricks (WA) Pty Ltd (1) Apply Austral Bricks (WA) Pty Ltd filter
  • BCI Minerals Pty Ltd (1) Apply BCI Minerals Pty Ltd filter
  • Beach Energy Limited (1) Apply Beach Energy Limited filter
  • BHP Billiton Nickel West (1) Apply BHP Billiton Nickel West filter
  • Chevron Australia Pty Ltd (1) Apply Chevron Australia Pty Ltd filter
  • Consolidated Minerals Pty Ltd (1) Apply Consolidated Minerals Pty Ltd filter
  • Eastern Metropolitan Regional Council (1) Apply Eastern Metropolitan Regional Council filter
  • Energy Resources Limited (1) Apply Energy Resources Limited filter
  • Fortescue Metals Group Limited (1) Apply Fortescue Metals Group Limited filter
  • GINDALBIE METALS LTD (1) Apply GINDALBIE METALS LTD filter
  • GrainCorp Liquid Terminals Australia Pty Ltd (1) Apply GrainCorp Liquid Terminals Australia Pty Ltd filter
  • Grange Resources Ltd (1) Apply Grange Resources Ltd filter
  • Iron Ore Holdings Ltd (1) Apply Iron Ore Holdings Ltd filter
  • Ivan Yujnovich (1) Apply Ivan Yujnovich filter
  • Kalgoorlie Consolidated Gold Mines Pty Ltd (1) Apply Kalgoorlie Consolidated Gold Mines Pty Ltd filter
  • Meynell Pty Ltd (1) Apply Meynell Pty Ltd filter
  • Minister for State Development (1) Apply Minister for State Development filter
  • Mount Gibson Mining Limited (1) Apply Mount Gibson Mining Limited filter
  • Northern Minerals Limited (1) Apply Northern Minerals Limited filter
  • Polaris Metals Pty Ltd (1) Apply Polaris Metals Pty Ltd filter
  • Resource Group (WA) Pty Ltd (1) Apply Resource Group (WA) Pty Ltd filter
  • Reward Minerals (1) Apply Reward Minerals filter
  • Robe River Mining Co. Pty. Ltd (1) Apply Robe River Mining Co. Pty. Ltd filter
  • Roy Hill Iron Ore Pty Ltd (1) Apply Roy Hill Iron Ore Pty Ltd filter
  • Smiths 2014 Pty Ltd (1) Apply Smiths 2014 Pty Ltd filter
  • St Ives Gold Mining Company Pty Limited (1) Apply St Ives Gold Mining Company Pty Limited filter
  • Subsea 7 Contracting Pty Ltd (1) Apply Subsea 7 Contracting Pty Ltd filter
  • UIL Energy (1) Apply UIL Energy filter
  • Venturex Resources Limited (1) Apply Venturex Resources Limited filter
  • Yilgarn Iron Pty Ltd (1) Apply Yilgarn Iron Pty Ltd filter

Filter by region:

  • Pilbara (23) Apply Pilbara filter
  • Perth (11) Apply Perth filter
  • Mid West (5) Apply Mid West filter
  • South West (4) Apply South West filter
  • Goldfields Esperance (2) Apply Goldfields Esperance filter
  • Great Southern (2) Apply Great Southern filter
  • Kimberley (2) Apply Kimberley filter
  • Wheatbelt (2) Apply Wheatbelt filter
  • Gascoyne (1) Apply Gascoyne filter

Filter by last updated:

  • (-) Remove 2020 filter 2020
  1. Home
  2. Proposal search
  3. Flora and Vegetation
  4. 2020

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Bunbury Outer Ring Road (Northern and Central Sections)

Last updated: December 14, 2020

The Commissioner of Main Roads Western Australia is proposing to construct and operate the northern section and upgrade the central section of the Bunbury Outer Ring Road (BORR).   The proposal includes 19km of freeway-standard dual carriageway and associated interchanges between Forrest Highway and Boyanup-Picton Road (northern section) and between Boyanup-Picton Road and South West Highway (central section).  The proposal would require the clearing of up to 73 hectares of native vegetation... Read more...

EP371 Laurel Gas Exploration and Appraisal Program

Last updated: December 2, 2020

Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to six wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...

Cardup Brickworks Redevelopment

Last updated: November 30, 2020

Austral Bricks is proposing the redevelopment of the Cardup Brickworks, which includes the expansion of the existing factory, increasing the design capacity from 200,000 to 250,000 tonnes per annum.  The site is located in the southern extremity of Byford.  Additional ancillary improvements include the installation of a new baghouse scrubber and a new primary crusher located in the floor of the pit.  The proposal would include:  Expanding the capacity from 200,000 to 250,000 tonnes per annum; ... Read more...

Miralga Creek DSO Project

Last updated: November 23, 2020

Atlas Iron Pty. Ltd (the proponent) propose to develop the Miralga Creek DSO Project (the proposal), an iron ore project located in the Pilbara region of Western Australia.  The proposal includes the development of five open pits using conventional drill and blast, load and haul methods.  8 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of four to five years.   Associated infrastructure will include waste rock dumps.  Existing borefield and... Read more...

Asian Renewable Energy Hub Revised Proposal

Last updated: November 9, 2020

NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub.  The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020.   This referral is for ... Read more...

Yanchep Rail Extension: Part 2 – Eglinton to Yanchep

Last updated: November 4, 2020

The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area. The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation that includes... Read more...

Asian Renewable Energy Hub

Last updated: October 15, 2020

NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...

Yanchep Rail Extension: Part 1 – Butler to Eglinton

Last updated: October 12, 2020

The Public Transport Authority (PTA) proposes to extend the existing Joondalup railway line by 7.3 kilometres from Butler Station to the suburb of Eglinton in the City of Wanneroo. The proposal is to construct and operate the rail extension and includes two new intermodal (rail, bus, ‘park and ride’, ‘kiss and ride’, walk and cycle) transit stations at Alkimos and Eglinton. The PTA will operate train services between Perth and Eglinton Stations and bus services from the Alkimos and Eglinton... Read more...

Flinders Pilbara Iron Ore Project – Stage 1

Last updated: October 5, 2020

The proposal is to develop and operate an iron ore mine on the Blacksmith tenement located approximately 70 km north-west of Tom Price in the Pilbara region of Western Australia. Read more...

Pilbara Iron Ore Project - revised proposal

Last updated: October 5, 2020

Flinders Mines Ltd proposes to revise the already approved Pilbara Iron Ore Project located approximately 70 kilometres north-west of Tom Price in the Hamersley sub-region. The revised proposal includes additional clearing up to 300 hectares (ha) to include the Paragon ore deposit and external infrastructure (including haul roads, airstrip and accommodation camp), as well as an increase in abstraction of groundwater of up to 2 Gigalitre per annum. Read more...

Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning

Last updated: September 30, 2020

The proposal is for the continuation of mining operations at the Fimiston site, and expansion and deepening of the Superpit to 600 metres via the Golden Pike Cutback. Additional waste dumps will be created to the north of the pit to contain 140 million tonnes of waste rock. The Fimiston I and II tailings storage facilities and/or the Kaltails tailings storage facility will be expanded to contain the additional tailings. This is a reassessment, pursuant to the Minister's decision to remit... Read more...

Roy Hill 1 Iron Ore Mining Stage 2

Last updated: September 30, 2020

Proposal to mine iron ore from the Stage 2 project area on the southern slopes of the Chichester Range and develop a remote borefield and pipeline by Roy Hill Iron Ore Pty Ltd (RHIO). Read more...

Subdivision at Goodwood Estate, Lot 9002 (formerly Lot 871) Prowse Road, Capel

Last updated: September 29, 2020

Meynell Pty Ltd intends to subdivide Lot 9002 Prowse Road, Capel to create 70 lots for residential development, associated access roads and a reserve for recreation and drainage. The proposal area is 15.5 hectares (ha) of which approximately 11.5 ha is proposed for development. Read more...

Subdivision of Lot 123 Mortimer Road Casuarina

Last updated: September 29, 2020

Lot 123 Mortimer Road Casuarina (Lot 123) is 45 hectares (ha) in size, and is proposed to be subdivided into two lots; one conservation lot of 7.9 hectares (ha) and a balance lot for residential development. Lot 123 contains excellent quality remnant Banksia woodland vegetation, threatened fauna habitat, and a conservation category wetland. Read more...

Mt Keith Satellite Project

Last updated: September 16, 2020

BHP Billiton Nickel West (BHPB) proposes to develop the Mt Keith Satellite Project (the proposal), to the existing Mount Keith Mining Operations. The proposal is located approximately 80 km north of Leinster in the Shire of Leonora. The proposal includes clearing of up to 842 hectares of native vegetation (which is also fauna habitat) for two open pits, a Waste Rock Landform and a transport corridor, with minor ancillary infrastructure to support the mining process. Read more...

Smiths Beach Development (S46) [2259]

Last updated: September 14, 2020

Change to condition 2-1 in order to extend the Time Limit for substantial commencement of the proposal. Read more...

Browns Range Rare Earth Project

Last updated: September 4, 2020

A proposed rare earth elements (REE) mine and ore processing facility at Browns Range, approximately 160 kilometres (km) southeast of Halls Creek in the Shire of Halls Creek. Read more...

Raven 2D Seismic Acquisition Survey

Last updated: September 4, 2020

Energy Resources Limited proposes to undertake a 2D onshore seismic acquisition survey to map the subsurface geology of the area, within petroleum exploration permit 432 in the Shire of Dandaragan. The proposal comprises a total of 125 line kilometres of 2D seismic lines within an area of about 122.6 km2. The proposal will require temporary disturbance of up to 40 hectares of native vegetation to create access lanes for the vibroseis trucks and light vehicles. The proposal is to be undertaken... Read more...

Roe Highway Extension (s46) [2164]

Last updated: August 6, 2020

Section 46 change to conditions - Inquire into the suitability of the implementation conditions and whether any of them should be changed. Read more...

Albany Iron Ore Project - Southdown Magnetite Proposal (s46) [2222]

Last updated: July 23, 2020

Changes to Condition 3 in order to extend the Time Limit of Authorisation for commencement of the proposal. Read more...

Pages

  • 1
  • 2
  • 3
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.