This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 7, 2017
The Department of Transport proposes to undertake maintenance and improvement works to the Casuarina Causeway located in Bunbury WA. The proposal includes the refurbishment and realignment of the revetment (including a 0.08 ha increase in the causeway footprint), installation of upgraded services, road works, drainage and landscaping. A multi-purpose building (including ablutions) and fishing/viewing platforms are also included as provisional items. Read more...Last updated: December 21, 2016
Note: In the matter of The Wilderness Society of WA (Inc) –v- Minister for Environment [2013] WASC, the Supreme Court of Western Australia found the Minister’s agreement decision invalid because the EPA’s decision to report was invalid., The proposal is a strategic environmental assessment for a common user LNG hub precinct for future Browse Basin gas processing in the Kimberley Region. Read more...Last updated: December 7, 2016
The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...Last updated: December 6, 2016
The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...Last updated: November 29, 2016
The proponent, Iron Bridge Operations Pty Ltd (a Joint Venture between FMG Iron Bridge Pty Ltd and Formosa Steel IB Pty Ltd), proposes to construct and operate new infrastructure within the existing Herb Elliot Port Facility, Fortescue Metals Group, Port Hedland. The proposal, Iron Bridge Port Facility, is designed to accept 10 Mtpa of magnetite concentrate slurry from the North Star Magnetite Project, whereupon the slurry would be dewatered and the concentrate product stored within a shed that... Read more...Last updated: November 14, 2016
The Port Rockingham Marina proposal is to construct and operate a new marina facility located at the intersection of Wanliss Street and Rockingham Beach Road, Rockingham, within Cockburn Sound. The EPA assessed the proposal at the level of Public Environmental Review and released its assessment report (Report 1339) in September 2009. Read more...Last updated: June 20, 2016
The Department of Defence proposes to undertake maintenance dredging of accumulated sediments alongside its marine infrastructure on the eastern side of Garden Island, in Cockburn Sound, to return naval waters to navigable depths. Approximately 1,900 cubic metres (m 3 ) of material is to be excavated from four locations in Careening Bay and 5,480m 3 of material from the Armaments Wharf in Sulphur Bay. The proposed dredging method is to use a long reach excavator with a bucket fitted with a... Read more...Last updated: December 4, 2014
The proposal is for a three year, pilot scale Mulloway (, Argyrosomus hololepidotus, ) and Yellowtail Kingfish (, Seriola lalandi, ) seacage aquaculture trial in the Zeewijk Channel, Abrolhos Islands (approximately 75 kilometres west of Geraldton). Inquiry under section 46 in response to a request for extension of timeframe for substantial commencement - condition 4 - Ministerial Statement 649 . Read more...Last updated: November 26, 2014
The proposal is for the construction of coastal structures to establish a harbour entrance to the Port Geographe Development with reduced trapping of seagrass wrack, 3 kilometres east of the town of Busselton. Inquiry under s46 regarding a review of the implementation conditions of Ministerial Statement 391 . Read more...Last updated: May 12, 2014
A 2,000 hectare aquaculture development zone located within Cone Bay, as defined by spatial coordinates provided in Table 2 of Schedule 1, as represented in Figure 1 and described in Table 1 of Schedule 1 (Kimberley Aquaculture Development Zone) with a maximum production capacity of 20,000 tonnes per annum of marine finfish of a species that occurs naturally within the Pilbara and Kimberley Region. Read more...Last updated: April 22, 2014
The proposal is for the construction and operation of an ocean outlet and associated infrastructure, for the Bunbury wastewater treatment plant. The outlet extends approximately 1.7 kilometres from the shoreline adjacent to the plant, for the disposal of treated wastewater Read more...Last updated: February 6, 2014
The proposal has the following main components: a 345 km railway line from Port Hedland to proposed mining operations at Mindy Mindy. This railway will be constructed in two parts: Part 1 from Port Hedland to the Chichester Ranges and Part 2 from the Chichester Ranges to Mindy Mindy; construction of port facilities consisting of rail loop, car dumper, stockyard and ore handling facilities (including two stackers and a single reclaimer), rescreening facility and product conveyor out to a wharf... Read more...Last updated: November 25, 2013
Ocean Grown Abalone Pty Ltd (OGA) is proposing to lease two 40 hectares (ha) areas within Flinders Bay, Augusta for the aquaculture of Greenlip Abalone (, Haliotis laevigata, ). The proposal involves the establishment of artificial structures on the seabed within the lease areas for the purposes of abalone habitat. OGA currently have an existing lease and licence with the Department of Fisheries (DoF) for 40 ha adjacent to these proposed sites and the DoF is currently assessing an amendment to... Read more...Last updated: November 8, 2013
The proposal involves the dredging of not more than 14.2 million cubic metres (Mm 3 ) of material for eight new berth pockets, a turning circle and a link to the existing shipping channel. The proposal also involves the construction of two new land based dredge management areas (DMMAs). Dredged material will be disposed offshore at an existing disposal ground in Commonwealth waters and the new and existing DMMAs. Read more...Last updated: October 21, 2013
The proposal is to develop a commercial-scale algae farm and processing facilities located near Karratha in the Shire of Roebourne. The project would involve cultivation, harvesting, separation and processing of algae. Cultivation would occur in shallow open ponds in the presence of sunlight, seawater and carbon dioxide plus some nutrients and trace elements to promote algal growth. The end products from processing would be: biodiesel for use as fuel; protein-rich biomass for farmed fish and... Read more...Last updated: February 12, 2013
Inquiry under s46 regarding proposed amendments to the Onslow Solar Salt Project, the subject of Ministerial Statement 401 . The changes to the project are to allow the start-up production to increase from 1.5 Mtpa to 2.5 Mtpa. Modifications proposed include: expansion of condenser pond area from 70 km 2 to 80 km 2 ; expansion of the crystalliser pond area from 7.2 km 2 to 8.2 km 2 ; area for storage of bitterns; extension of the jetty structure by 300 m; extension of the dredged approach... Read more...Last updated: January 25, 2013
The implementation of a three year, pilot scale Mulloway (, Argyrosomus hololepidotus, ) and Yellowtail Kingfish (, Seriola lalandi, ) seacage aquaculture trial in the Zeewijk Channel, Abrolhos Islands (approximately 75 kilometres west of Geraldton), as documented in schedule 1 of Ministerial Statement 649 . Inquiry into request under section 46 for extension of time limit. Read more...