Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • EPA Board Meetings
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Infrastructure (30) Apply Infrastructure filter
  • Land use (3) Apply Land use filter
  • Oil and gas (3) Apply Oil and gas filter
  • Sand, rock, gravel and clay (3) Apply Sand, rock, gravel and clay filter
  • Power generation (2) Apply Power generation filter
  • Aquaculture (1) Apply Aquaculture filter
  • Bauxite (1) Apply Bauxite filter
  • Industrial (1) Apply Industrial filter
  • Iron Ore (1) Apply Iron Ore filter
  • Salt (1) Apply Salt filter
  • Utilities (1) Apply Utilities filter

Filter by current status:

  • Ministerial Statement published (31) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (7) Apply Decision on whether to assess has been published filter
  • Environmental Scoping Document approved (3) Apply Environmental Scoping Document approved filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter
  • Public Environmental Review document in preparation (1) Apply Public Environmental Review document in preparation filter
  • Response to submission published (1) Apply Response to submission published filter

Filter by preliminary environmental factors:

  • (-) Remove Benthic Communities and Habitats filter Benthic Communities and Habitats
  • (-) Remove Coastal Processes filter Coastal Processes
  • Marine Environmental Quality (39) Apply Marine Environmental Quality filter
  • Marine Fauna (25) Apply Marine Fauna filter
  • Flora and Vegetation (17) Apply Flora and Vegetation filter
  • Social Surroundings (17) Apply Social Surroundings filter
  • Air Quality (14) Apply Air Quality filter
  • Terrestrial Fauna (14) Apply Terrestrial Fauna filter
  • Inland Waters Environmental Quality (7) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (6) Apply Hydrological Processes filter
  • Inland Waters (4) Apply Inland Waters filter
  • Subterranean Fauna (4) Apply Subterranean Fauna filter
  • Terrestrial Environmental Quality (4) Apply Terrestrial Environmental Quality filter
  • Human Health (3) Apply Human Health filter
  • Landforms (2) Apply Landforms filter

Filter by Proponent:

  • Cockburn Cement Limited (3) Apply Cockburn Cement Limited filter
  • Minister for State Development (3) Apply Minister for State Development filter
  • Department of Commerce and Trade (2) Apply Department of Commerce and Trade filter
  • Roy Hill Infrastructure Pty Ltd (2) Apply Roy Hill Infrastructure Pty Ltd filter
  • Albany Port Authority (1) Apply Albany Port Authority filter
  • API Management Pty Ltd (1) Apply API Management Pty Ltd filter
  • Aureus Commercial Pty Ltd (1) Apply Aureus Commercial Pty Ltd filter
  • Australian United Steel Industry Pty Limited (1) Apply Australian United Steel Industry Pty Limited filter
  • Cape Seafarms Pty Ltd (1) Apply Cape Seafarms Pty Ltd filter
  • Carnegie Wave (1) Apply Carnegie Wave filter
  • Carnegie Wave Energy Ltd (1) Apply Carnegie Wave Energy Ltd filter
  • Chevron Australia Pty Ltd (for original proposal) (1) Apply Chevron Australia Pty Ltd (for original proposal) filter
  • City of Albany (1) Apply City of Albany filter
  • City of Rockingham (1) Apply City of Rockingham filter
  • Coral Coast Marina Development Pty Ltd (1) Apply Coral Coast Marina Development Pty Ltd filter
  • DevelopmentWA (1) Apply DevelopmentWA filter
  • Fortescue Metals Group Limited (1) Apply Fortescue Metals Group Limited filter
  • Fortescue Metals Group Ltd (1) Apply Fortescue Metals Group Ltd filter
  • Fremantle Port Authority (1) Apply Fremantle Port Authority filter
  • Fremantle Ports (1) Apply Fremantle Ports filter
  • Gascoyne Gateway Ltd (1) Apply Gascoyne Gateway Ltd filter
  • James Point Pty Ltd (1) Apply James Point Pty Ltd filter
  • K + S Salt Australia Pty Ltd (1) Apply K + S Salt Australia Pty Ltd filter
  • LandCorp (1) Apply LandCorp filter
  • Minister for Resources Development (1) Apply Minister for Resources Development filter
  • Murchison Hydrogen Renewables Pty Ltd as trustee for Murchison Hydrogen Renewables Project Trust (1) Apply Murchison Hydrogen Renewables Pty Ltd as trustee for Murchison Hydrogen Renewables Project Trust filter
  • North West Infrastructure (1) Apply North West Infrastructure filter
  • NWIOA Ops. Pty Ltd trading as North West Infrastructure (1) Apply NWIOA Ops. Pty Ltd trading as North West Infrastructure filter
  • NWIOA Ops. Pty Ltd (trading as North West Infrastructure) (1) Apply NWIOA Ops. Pty Ltd (trading as North West Infrastructure) filter
  • Onslow Marine Support Base Pty Ltd (1) Apply Onslow Marine Support Base Pty Ltd filter
  • South West Development Commission (1) Apply South West Development Commission filter
  • Southern Ports Authority (1) Apply Southern Ports Authority filter
  • Subsea 7 Australia Contracting PTY LTD (1) Apply Subsea 7 Australia Contracting PTY LTD filter
  • Subsea 7 Contracting Pty Ltd (1) Apply Subsea 7 Contracting Pty Ltd filter
  • Tallwood Nominees (1) Apply Tallwood Nominees filter
  • VBX Limited (1) Apply VBX Limited filter
  • Water Corporation (1) Apply Water Corporation filter
  • West Australian Petroleum Pty Ltd (1) Apply West Australian Petroleum Pty Ltd filter
  • Whitecrest Enterprises Pty Ltd (1) Apply Whitecrest Enterprises Pty Ltd filter

Filter by region:

  • Pilbara (14) Apply Pilbara filter
  • Perth (12) Apply Perth filter
  • Gascoyne (6) Apply Gascoyne filter
  • Mid West (4) Apply Mid West filter
  • South West (3) Apply South West filter
  • Great Southern (2) Apply Great Southern filter
  • Kimberley (2) Apply Kimberley filter
  • Peel (2) Apply Peel filter

Filter by last updated:

  • 2022 (8) Apply 2022 filter
  • 2021 (3) Apply 2021 filter
  • 2020 (4) Apply 2020 filter
  • 2019 (4) Apply 2019 filter
  • 2018 (2) Apply 2018 filter
  • 2017 (1) Apply 2017 filter
  • 2016 (3) Apply 2016 filter
  • 2014 (3) Apply 2014 filter
  • 2013 (1) Apply 2013 filter
  • 2012 (1) Apply 2012 filter
  • 2011 (1) Apply 2011 filter
  • 2009 (2) Apply 2009 filter
  • 2005 (1) Apply 2005 filter
  • 2004 (1) Apply 2004 filter
  • 2003 (1) Apply 2003 filter
  • 1999 (1) Apply 1999 filter
  • 1998 (1) Apply 1998 filter
  • 1997 (2) Apply 1997 filter
  • 1996 (2) Apply 1996 filter
  • 1995 (1) Apply 1995 filter
  • 1994 (1) Apply 1994 filter
  • 1991 (1) Apply 1991 filter
  1. Home
  2. Proposal search
  3. Benthic Communities and Habitats
  4. Coastal Processes

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Multi-User Iron Ore Export (Landside) Facility Port Hedland (S46) [2349]

Last updated: September 5, 2022

The requested change relates to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) for an extension to the Time Limit for Proposal Implementation for the proposal approved under MS 891. Read more...

Multi-user Iron Ore Export (Landside) Facility

Last updated: September 5, 2022

The proposal will provide additional port facilities at Port Hedland to receive and stockpile the product from emerging miners, specifically the various mines owned by the proponent’s shareholders, and load this product onto ships for export. Each of the shareholders is exploring and developing new iron ore projects in the Pilbara, with one company actively mining ore and exporting through the existing facilities in the Port of Port Hedland. The current shareholders of the proponent are Atlas... Read more...

Albany Port Expansion Project (S46) [2262]

Last updated: July 21, 2022

Change to condition 3 – Time Limit for Proposal Implementation. Extension of time limit of five years to 18 November 2025. Read more...

Single Jetty Deep Water Port & Renewable Hub

Last updated: May 31, 2022

Gascoyne Gateway Ltd proposes to construct and operate a multi-use single jetty and associated shore-based activities approximately 10 kilometres south of Exmouth on the western and eastern sides of Minilya-Exmouth Road. The development envelope is approximately 3.8 km 2 in size and includes a single access jetty, onshore strategic port land, renewables precinct, desalination infrastructure and fuel storage. Read more...

Murchison Hydrogen Renewables Project

Last updated: May 16, 2022

The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...

Koombana Bay Marine Structures

Last updated: April 26, 2022

The South West Development Commission is proposing an upgrade to the marine structures that are intended to meet existing demand and future requirements for small craft maritime infrastructure and include new mooring facilities for commercial and recreational vessels, floating jetties, a boat servicing facility, improved public ablution facilities and up upgraded boat launching and storage facilities. Read more...

Port Rockingham Marina, Cockburn Sound (S46) [2234]

Last updated: February 2, 2022

The requested changes relate to condition 3 of Statement 1041 (as relevant to Statement 826) for an extension to the Time Limit of Authorisation for Proposal Implementation. Read more...

Wheatstone Development Proposal (S46) [2178]

Last updated: February 2, 2022

Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...

Ashburton Salt Project

Last updated: December 21, 2021

K plus S Salt Australia Pty Ltd is seeking approval to construct and operate a 3.5 million tonnes per annum (Mtpa) Solar Salt Project located approximately 40 km south-west of the township of Onslow, within the Shire of Ashburton. Read more...

Wuudagu Bauxite Project

Last updated: June 9, 2021

VBX Limited propose to develop a bauxite mine located approximately 15 km west of the town of Kalumburu in the Kimberley. The proposal involves the mining of bauxite in the Kimberley and the use of a conveyor to transport processed ore to a barge-loading facility in Napier Broome Sound, and then trans-shipping of ore. Read more...

Industrial Infrastructure and Harbour Development, Jervoise Bay

Last updated: May 25, 2021

The proposal is to construct industrial infrastructure and a Southern Harbour in Jervoise Bay south of the Northern Harbour precinct and including the Marine support facility. Read more...

Port Facility Upgrade - Dredging and Wharf Construction - Third Berth Anderson Point Port Hedland

Last updated: August 12, 2020

The proposal is for dredging of not more than 3,500,000 cubic metres off Anderson Point, for a third ship berth; disposal of dredge spoil on preexisting and previously approved land at Anderson Point; and extension of the approved open-pile wharf. Read more...

Learmonth Pipeline Fabrication Facility

Last updated: June 29, 2020

Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The onshore pipeline fabrication site and associated infrastructure includes two Bundle tracks (approximately 10 km in length) along which the Bundles will be constructed... Read more...

Oakajee Deepwater Port, Oakajee, Shire of Chapman Valley (s46) [2171]

Last updated: June 18, 2020

Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...

Ocean Reef Marina

Last updated: January 6, 2020

The City of Joondalup proposes to develop a recreational, residential, boating and tourist development, referred to as the Ocean Reef Marina Development at Ocean Reef, Western Australia. The Development is located in the Ocean Reef locality, approximately 29 km from the Perth central area. The Development is within the City and includes the existing Ocean Reef Boat Harbour. Read more...

Perth Seawater Desalination Plant 2

Last updated: November 25, 2019

The Western Australian Water Corporation is proposing to construct the Perth Seawater Desalination Plant 2 (PSDP 2) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The PSDP2 Proposal will be located within the Kwinana Industrial Area, approximately 38 km south of the Perth Metropolitan Area, on Lot 1864, Riseley Road in Naval Base. PSDP2 will be developed in two stages (each with a... Read more...

Albany Artificial Surf Reef

Last updated: June 10, 2019

The City of Albany (CoA) proposes to construct an artificial surfing reef (ASR) at Middleton Beach, southern Western Australia. The proposed ASR will be built at the southern end of the beach with the aim of enhancing the recreational surfing conditions for local residents and tourists. The ASR will be designed to target beginner-intermediate surfers. Read more...

Learmonth Bundle Site

Last updated: May 15, 2019

Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...

Onslow Marine Support Base Stage 2 Capital Dredging

Last updated: March 6, 2019

Onslow Marine Support Base Pty Ltd is proposing to modify and extend the Beadon Creek harbour approach channel, turning basin and berth pocket as part of Stage 2 of the Onslow Marine Support Base (OMSB) proposal. The proposed capital dredging will enable offshore supply vessels to access the newly constructed OMSB land-backed wharf facility (Stage 1) within the Beadon Creek Maritime Facility. 930,000 cubic metres of dredge material will be disposed of onshore to a 44 hectare Dredge material... Read more...

Anketell Point Port Development (s46) [2162]

Last updated: May 14, 2018

Section 46 extension to the Time Limit for Authorisation for substantial commencement. Read more...

Pages

  • 1
  • 2
  • 3
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.