Last updated: October 5, 2020
CMC proposes to construct and operate a barge loading/unloading facility (Derby barge facility) within the Port of Derby, immediately to the north of the existing Derby jetty. The proposal would require a total disturbance of 3.5 hectares(ha), which includes 1.66 ha of land reclamation and 1.84 ha harbour basin and dredging to a depth of -1.0 metre Australian Height Datum (AHD). The proposed facility would include a purpose-built barge loading/unloading facility, associated servicing (... Read more...