Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • EPA Board Meetings
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • (-) Remove Infrastructure filter Infrastructure
  • Iron Ore (5) Apply Iron Ore filter
  • Industrial (4) Apply Industrial filter
  • Oil and gas (2) Apply Oil and gas filter
  • Land use (1) Apply Land use filter

Filter by current status:

  • Ministerial Statement published (44) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (12) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter
  • EPA Report and Recommendations released - appeals open (1) Apply EPA Report and Recommendations released - appeals open filter
  • Public Environmental Review document in preparation (1) Apply Public Environmental Review document in preparation filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter
  • Response to submission published (1) Apply Response to submission published filter

Filter by relevant environmental factors:

  • (-) Remove Benthic Communities and Habitats filter Benthic Communities and Habitats
  • Marine Environmental Quality (45) Apply Marine Environmental Quality filter
  • Marine Fauna (33) Apply Marine Fauna filter
  • Coastal Processes (30) Apply Coastal Processes filter
  • Flora and Vegetation (23) Apply Flora and Vegetation filter
  • Social Surroundings (21) Apply Social Surroundings filter
  • Air Quality (19) Apply Air Quality filter
  • Terrestrial Fauna (17) Apply Terrestrial Fauna filter
  • Inland Waters Environmental Quality (9) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (8) Apply Hydrological Processes filter
  • Terrestrial Environmental Quality (5) Apply Terrestrial Environmental Quality filter
  • Human Health (3) Apply Human Health filter
  • Landforms (3) Apply Landforms filter
  • Subterranean Fauna (3) Apply Subterranean Fauna filter
  • Inland Waters (2) Apply Inland Waters filter
  • Greenhouse Gas Emissions (1) Apply Greenhouse Gas Emissions filter

Filter by Proponent:

  • Water Corporation (3) Apply Water Corporation filter
  • Albany Port Authority (2) Apply Albany Port Authority filter
  • Department of Commerce and Trade (2) Apply Department of Commerce and Trade filter
  • Department of Transport (2) Apply Department of Transport filter
  • Forge Resources Swan Pty Ltd (2) Apply Forge Resources Swan Pty Ltd filter
  • Fortescue Metals Group Limited (2) Apply Fortescue Metals Group Limited filter
  • LandCorp (2) Apply LandCorp filter
  • Minister for State Development (2) Apply Minister for State Development filter
  • Port Hedland Port Authority (2) Apply Port Hedland Port Authority filter
  • Roy Hill Infrastructure Pty Ltd (2) Apply Roy Hill Infrastructure Pty Ltd filter
  • API Management Pty Ltd (1) Apply API Management Pty Ltd filter
  • Aureus Commercial Pty Ltd (1) Apply Aureus Commercial Pty Ltd filter
  • Australian Methanol Company Pty Ltd (1) Apply Australian Methanol Company Pty Ltd filter
  • Australian United Steel Industry Pty Limited (1) Apply Australian United Steel Industry Pty Limited filter
  • Aztec Resources Limited (1) Apply Aztec Resources Limited filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • BHP Billiton Petroleum Pty Ltd (1) Apply BHP Billiton Petroleum Pty Ltd filter
  • Busselton Jetty Incorporated (1) Apply Busselton Jetty Incorporated filter
  • Carnegie Wave (1) Apply Carnegie Wave filter
  • City of Albany (1) Apply City of Albany filter
  • City of Rockingham (1) Apply City of Rockingham filter
  • Cranford Pty Ltd (1) Apply Cranford Pty Ltd filter
  • Department for Planning and Infrastructure (1) Apply Department for Planning and Infrastructure filter
  • Department of Defence (1) Apply Department of Defence filter
  • Department of Marine & Harbours (1) Apply Department of Marine & Harbours filter
  • Department of Primary Industries and Regional Development (1) Apply Department of Primary Industries and Regional Development filter
  • DevelopmentWA (1) Apply DevelopmentWA filter
  • Fortescue Metals Group Ltd (1) Apply Fortescue Metals Group Ltd filter
  • Fremantle Ports (1) Apply Fremantle Ports filter
  • Hamersley Iron Pty Ltd (1) Apply Hamersley Iron Pty Ltd filter
  • IB Operations Pty Ltd (1) Apply IB Operations Pty Ltd filter
  • James Point Pty Ltd (1) Apply James Point Pty Ltd filter
  • Kimberley Ports Authority (1) Apply Kimberley Ports Authority filter
  • Lanco Resources Australia Pty Ltd (1) Apply Lanco Resources Australia Pty Ltd filter
  • Minister for Resources Development (1) Apply Minister for Resources Development filter
  • North West Infrastructure (1) Apply North West Infrastructure filter
  • NWIOA Ops. Pty Ltd trading as North West Infrastructure (1) Apply NWIOA Ops. Pty Ltd trading as North West Infrastructure filter
  • NWIOA Ops. Pty Ltd (trading as North West Infrastructure) (1) Apply NWIOA Ops. Pty Ltd (trading as North West Infrastructure) filter
  • Onslow Infraco Pty Ltd (1) Apply Onslow Infraco Pty Ltd filter
  • Onslow Marine Support Base Pty Ltd (1) Apply Onslow Marine Support Base Pty Ltd filter
  • Point Grey Development Company Pty Ltd (1) Apply Point Grey Development Company Pty Ltd filter
  • Robe River Iron Associates (1) Apply Robe River Iron Associates filter
  • South West Development Commission (1) Apply South West Development Commission filter
  • Southern Ports Authority (1) Apply Southern Ports Authority filter
  • Subsea 7 Australia Contracting PTY LTD (1) Apply Subsea 7 Australia Contracting PTY LTD filter
  • Subsea 7 Contracting Pty Ltd (1) Apply Subsea 7 Contracting Pty Ltd filter
  • Water Corporation of Western Australia (1) Apply Water Corporation of Western Australia filter
  • Western Stevedores Pty Ltd (1) Apply Western Stevedores Pty Ltd filter
  • Whitecrest Enterprises Pty Ltd (1) Apply Whitecrest Enterprises Pty Ltd filter

Filter by region:

  • Pilbara (26) Apply Pilbara filter
  • Perth (12) Apply Perth filter
  • South West (7) Apply South West filter
  • Gascoyne (5) Apply Gascoyne filter
  • Great Southern (4) Apply Great Southern filter
  • Mid West (3) Apply Mid West filter
  • Kimberley (2) Apply Kimberley filter
  • Peel (2) Apply Peel filter

Filter by last updated:

  • 2023 (2) Apply 2023 filter
  • 2022 (7) Apply 2022 filter
  • 2021 (2) Apply 2021 filter
  • 2020 (8) Apply 2020 filter
  • 2019 (6) Apply 2019 filter
  • 2018 (4) Apply 2018 filter
  • 2017 (2) Apply 2017 filter
  • 2016 (5) Apply 2016 filter
  • 2014 (3) Apply 2014 filter
  • 2013 (2) Apply 2013 filter
  • 2012 (2) Apply 2012 filter
  • 2011 (1) Apply 2011 filter
  • 2009 (2) Apply 2009 filter
  • 2007 (1) Apply 2007 filter
  • 2006 (1) Apply 2006 filter
  • 2005 (1) Apply 2005 filter
  • 2004 (2) Apply 2004 filter
  • 2003 (1) Apply 2003 filter
  • 2002 (2) Apply 2002 filter
  • 1998 (2) Apply 1998 filter
  • 1997 (1) Apply 1997 filter
  • 1996 (3) Apply 1996 filter
  • 1991 (1) Apply 1991 filter
  1. Home
  2. Proposal search
  3. Benthic Communities and Habitats
  4. Infrastructure

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Koolan Island Iron Ore Mine and Port Facility

Last updated: August 20, 2019

Re-opening of an iron ore mine; construction of associated infrastructure and a port facility on Koolan Island; and subsequent rehabilitation and decommissioning of the site. Read more...

Albany Artificial Surf Reef

Last updated: June 10, 2019

The City of Albany (CoA) proposes to construct an artificial surfing reef (ASR) at Middleton Beach, southern Western Australia. The proposed ASR will be built at the southern end of the beach with the aim of enhancing the recreational surfing conditions for local residents and tourists. The ASR will be designed to target beginner-intermediate surfers. Read more...

Learmonth Bundle Site

Last updated: May 15, 2019

Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...

Onslow Marine Support Base Stage 2 Capital Dredging

Last updated: March 6, 2019

Onslow Marine Support Base Pty Ltd is proposing to modify and extend the Beadon Creek harbour approach channel, turning basin and berth pocket as part of Stage 2 of the Onslow Marine Support Base (OMSB) proposal. The proposed capital dredging will enable offshore supply vessels to access the newly constructed OMSB land-backed wharf facility (Stage 1) within the Beadon Creek Maritime Facility. 930,000 cubic metres of dredge material will be disposed of onshore to a 44 hectare Dredge material... Read more...

Non-Lethal Trial of SMART Drumlines

Last updated: January 17, 2019

The proposal is to undertake a trial of the SMART drumlines as a non-lethal shark hazard mitigation tool in Western Australian conditions.  In doing so, it is proposed to catch, tag, relocate and release white sharks.  The proposal is located in waters offshore from Gracetown (offshore from Shire of Augusta Margaret River), in the Ngari Capes Marine Park.  The duration of the trial will be for 15 months. Where possible, the proposed WA SMART drumline project has been aligned with the NSW SMART... Read more...

Port of Broome Channel Optimisation Project

Last updated: May 14, 2018

Kimberley Ports Authority (KPA) is seeking to improve accessibility to the Port of Broome, situated in West Roebuck Bay, approximately 5 kilometres south west of the township of Broome. Larger vessels entering the Port, such as cruise ships, have limited access windows due to the large tidal range (10m), presence of channel rock and high spots (shoals) in the access channel. In recognition of the access constraints and the growing tourism industry in Broome, the Department of Primary Industries... Read more...

Anketell Point Port Development (s46) [2162]

Last updated: May 14, 2018

Section 46 extension to the Time Limit for Authorisation for substantial commencement. Read more...

Johns Creek Boat Harbour Maintenance Dredging

Last updated: April 16, 2018

Johns Creek Boat Harbour is a small facility located at Point Samson, 40 km east of Karratha.  Dredging of the Boat Harbour and Entrance Channel is required to restore navigable depths, and is planned for autumn 2018. Maintenance dredging is proposed to occur within the Boat Harbour and Entrance Channel, with disposal to a sandbank about 1 km south of the Boat Harbour (Western Disposal area). Read more...

Roy Hill 1 Iron Ore Project, Port Infrastructure

Last updated: February 5, 2018

The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Read more...

Casuarina Causeway Improvement Project

Last updated: March 7, 2017

The Department of Transport proposes to undertake maintenance and improvement works to the Casuarina Causeway located in Bunbury WA. The proposal includes the refurbishment and realignment of the revetment (including a 0.08 ha increase in the causeway footprint), installation of upgraded services, road works, drainage and landscaping. A multi-purpose building (including ablutions) and fishing/viewing platforms are also included as provisional items. Read more...

Multi-user Iron Ore Export (Landside) Facility, Port Hedland (s. 46)

Last updated: January 31, 2017

The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . Read more...

Mangles Bay Marine Based Tourist Precinct

Last updated: December 7, 2016

The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...

Bunbury Berth 14A Expansion Project

Last updated: December 6, 2016

The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...

Iron Bridge Port Facility

Last updated: November 29, 2016

The proponent, Iron Bridge Operations Pty Ltd (a Joint Venture between FMG Iron Bridge Pty Ltd and Formosa Steel IB Pty Ltd), proposes to construct and operate new infrastructure within the existing Herb Elliot Port Facility, Fortescue Metals Group, Port Hedland. The proposal, Iron Bridge Port Facility, is designed to accept 10 Mtpa of magnetite concentrate slurry from the North Star Magnetite Project, whereupon the slurry would be dewatered and the concentrate product stored within a shed that... Read more...

Port Rockingham Marina - inquiry under section 46

Last updated: November 14, 2016

The Port Rockingham Marina proposal is to construct and operate a new marina facility located at the intersection of Wanliss Street and Rockingham Beach Road, Rockingham, within Cockburn Sound. The EPA assessed the proposal at the level of Public Environmental Review and released its assessment report (Report 1339) in September 2009. Read more...

CETO 6 Garden Island Project

Last updated: March 29, 2016

Read more...

Roy Hill 1 iron ore project port infrastructure proposal (s. 46)

Last updated: July 30, 2014

The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 regarding amending the conditions of Ministerial Statement 858 . Read more...

Ocean outlet for treated wastewater, Bunbury wastewater treatment plant

Last updated: April 22, 2014

The proposal is for the construction and operation of an ocean outlet and associated infrastructure, for the Bunbury wastewater treatment plant. The outlet extends approximately 1.7 kilometres from the shoreline adjacent to the plant, for the disposal of treated wastewater Read more...

Pilbara Iron Ore and Infrastructure Project: Port and North-South Railway (Stage A)

Last updated: February 6, 2014

The proposal has the following main components: a 345 km railway line from Port Hedland to proposed mining operations at Mindy Mindy. This railway will be constructed in two parts: Part 1 from Port Hedland to the Chichester Ranges and Part 2 from the Chichester Ranges to Mindy Mindy; construction of port facilities consisting of rail loop, car dumper, stockyard and ore handling facilities (including two stackers and a single reclaimer), rescreening facility and product conveyor out to a wharf... Read more...

South West Creek Dredging and Reclamation Proposal

Last updated: November 8, 2013

The proposal involves the dredging of not more than 14.2 million cubic metres (Mm 3 ) of material for eight new berth pockets, a turning circle and a link to the existing shipping channel. The proposal also involves the construction of two new land based dredge management areas (DMMAs). Dredged material will be disposed offshore at an existing disposal ground in Commonwealth waters and the new and existing DMMAs. Read more...

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.