This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: July 21, 2022
Change to condition 3 – Time Limit for Proposal Implementation. Extension of time limit of five years to 18 November 2025. Read more...Last updated: July 1, 2022
The proposal is to construct and operate an iron ore export facility at Balla Balla midway between Port Hedland and Karratha, northwest of Whim Creek in the Pilbara region of WA. Read more...Last updated: June 14, 2022
The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...Last updated: February 2, 2022
Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...Last updated: November 24, 2021
Mardie Minerals Pty Ltd proposes to develop a high volume salt and Sulphate of Potash project at Mardie, approximately 80 km south west of Karratha, in the Pilbara Region of Western Australia. The proposal would utilise seawater and evaporation to produce a concentrated salt product and other associated products., The proposal includes a seawater intake, evaporation ponds, processing plant, bitterns disposal pipeline and outfall, desalination plant, freshwater supply bores and associated... Read more...Last updated: October 21, 2021
The proponent, Shark Bay Resources Pty Ltd, operates two solar salt fields and an associated port facility at Useless Loop in the Shark Bay area of Western Australia. The site is located approximately 25 kilometres west southwest of Denham. The proponent is proposing to undertake maintenance and capital dredging of up to 80,000 cubic metres from the entrance channel of the port and seabed levelling of 10,000 cubic metres in the berth pocket to restore navigable depths. The development envelopes... Read more...Last updated: May 25, 2021
The proposal is to construct industrial infrastructure and a Southern Harbour in Jervoise Bay south of the Northern Harbour precinct and including the Marine support facility. Read more...Last updated: October 15, 2020
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: June 18, 2020
Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...Last updated: April 14, 2020
The proposal is to develop and operate a general cargo facility within the Port Hedland inner harbour, within the Town of Port Hedland. Read more...Last updated: April 3, 2020
The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island. Read more...Last updated: January 20, 2020
The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions in Ministerial Statement 945 relating to Forge Resources Swan Pty Ltd’s Balla Balla Export Facilities proposal. Read more...Last updated: January 6, 2020
The City of Joondalup proposes to develop a recreational, residential, boating and tourist development, referred to as the Ocean Reef Marina Development at Ocean Reef, Western Australia. The Development is located in the Ocean Reef locality, approximately 29 km from the Perth central area. The Development is within the City and includes the existing Ocean Reef Boat Harbour. Read more...Last updated: March 6, 2019
Onslow Marine Support Base Pty Ltd is proposing to modify and extend the Beadon Creek harbour approach channel, turning basin and berth pocket as part of Stage 2 of the Onslow Marine Support Base (OMSB) proposal. The proposed capital dredging will enable offshore supply vessels to access the newly constructed OMSB land-backed wharf facility (Stage 1) within the Beadon Creek Maritime Facility. 930,000 cubic metres of dredge material will be disposed of onshore to a 44 hectare Dredge material... Read more...Last updated: July 17, 2017
The Department of Fisheries, on behalf of the Minister for Fisheries proposes to create an ‘Aquaculture Development Zone’ to provide a management precinct for prospective future aquaculture proposals within State Waters, approximately 75 kilometres west of Geraldton within the Fish Habitat Protection Area of the Abrolhos Islands. The strategic proposal area has been selected by the proponent to maximise suitability for marine finfish aquaculture, and minimise potential impacts on existing... Read more...Last updated: December 21, 2016
Note: In the matter of The Wilderness Society of WA (Inc) –v- Minister for Environment [2013] WASC, the Supreme Court of Western Australia found the Minister’s agreement decision invalid because the EPA’s decision to report was invalid., The proposal is a strategic environmental assessment for a common user LNG hub precinct for future Browse Basin gas processing in the Kimberley Region. Read more...Last updated: December 7, 2016
The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...Last updated: December 6, 2016
The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...Last updated: May 12, 2014
A 2,000 hectare aquaculture development zone located within Cone Bay, as defined by spatial coordinates provided in Table 2 of Schedule 1, as represented in Figure 1 and described in Table 1 of Schedule 1 (Kimberley Aquaculture Development Zone) with a maximum production capacity of 20,000 tonnes per annum of marine finfish of a species that occurs naturally within the Pilbara and Kimberley Region. Read more...Last updated: February 12, 2013
Inquiry under s46 regarding proposed amendments to the Onslow Solar Salt Project, the subject of Ministerial Statement 401 . The changes to the project are to allow the start-up production to increase from 1.5 Mtpa to 2.5 Mtpa. Modifications proposed include: expansion of condenser pond area from 70 km 2 to 80 km 2 ; expansion of the crystalliser pond area from 7.2 km 2 to 8.2 km 2 ; area for storage of bitterns; extension of the jetty structure by 300 m; extension of the dredged approach... Read more...