Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • EPA Board Meetings
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • (-) Remove Oil and gas filter Oil and gas
  • Infrastructure (2) Apply Infrastructure filter
  • Industrial (1) Apply Industrial filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by relevant environmental factors:

  • (-) Remove Benthic Communities and Habitats filter Benthic Communities and Habitats
  • Marine Environmental Quality (11) Apply Marine Environmental Quality filter
  • Marine Fauna (11) Apply Marine Fauna filter
  • Air Quality (5) Apply Air Quality filter
  • Flora and Vegetation (5) Apply Flora and Vegetation filter
  • Coastal Processes (3) Apply Coastal Processes filter
  • Social Surroundings (3) Apply Social Surroundings filter
  • Terrestrial Fauna (3) Apply Terrestrial Fauna filter
  • Hydrological Processes (1) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (1) Apply Inland Waters Environmental Quality filter
  • Landforms (1) Apply Landforms filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter

Filter by Proponent:

  • West Australian Petroleum Pty Ltd (2) Apply West Australian Petroleum Pty Ltd filter
  • Woodside Energy Ltd (2) Apply Woodside Energy Ltd filter
  • Apache Energy Ltd (1) Apply Apache Energy Ltd filter
  • BHP Billiton Petroleum Pty Ltd (1) Apply BHP Billiton Petroleum Pty Ltd filter
  • Chevron Australia Pty Ltd (1) Apply Chevron Australia Pty Ltd filter
  • Chevron Australia Pty Ltd (for original proposal) (1) Apply Chevron Australia Pty Ltd (for original proposal) filter
  • Lasmo Oil (Australia) Ltd (1) Apply Lasmo Oil (Australia) Ltd filter
  • Minister for State Development (1) Apply Minister for State Development filter
  • Minora Resources NL (1) Apply Minora Resources NL filter
  • Mobil Australia Resources Company Pty Ltd (1) Apply Mobil Australia Resources Company Pty Ltd filter
  • Roc Oil (WA) Limited (1) Apply Roc Oil (WA) Limited filter
  • Sun Resources NL (1) Apply Sun Resources NL filter
  • Woodside Offshore Petroleum Pty Ltd (1) Apply Woodside Offshore Petroleum Pty Ltd filter

Filter by region:

  • Pilbara (10) Apply Pilbara filter
  • Gascoyne (3) Apply Gascoyne filter
  • Kimberley (1) Apply Kimberley filter
  • Mid West (1) Apply Mid West filter
  • Perth (1) Apply Perth filter

Filter by last updated:

  • 2022 (3) Apply 2022 filter
  • 2020 (1) Apply 2020 filter
  • 2016 (1) Apply 2016 filter
  • 2012 (1) Apply 2012 filter
  • 2004 (1) Apply 2004 filter
  • 2000 (1) Apply 2000 filter
  • 1998 (2) Apply 1998 filter
  • 1997 (1) Apply 1997 filter
  • 1993 (1) Apply 1993 filter
  • 1991 (3) Apply 1991 filter
  • 1989 (1) Apply 1989 filter
  1. Home
  2. Proposal search
  3. Benthic Communities and Habitats
  4. Ministerial Statement published
  5. Oil and gas

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Jansz Feed Gas Pipeline Barrow Island Nature Reserve

Last updated: October 24, 2022

The Jansz feed gas pipeline is proposed to supply natural gas from the Jansz/Io field located in Commonwealth waters approximately 200km off the Pilbara coast of Western Australia and pipe it across the Barrow Island Nature Reserve to the Gorgon Gas Treatment Plant on Barrow Island. Read more...

Scarborough Project Nearshore Component

Last updated: June 14, 2022

The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...

Wheatstone Development Proposal (S46) [2178]

Last updated: February 2, 2022

Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve

Last updated: April 3, 2020

The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island. Read more...

Browse Liquefied Natural Gas Precinct

Last updated: December 21, 2016

Note: In the matter of The Wilderness Society of WA (Inc) –v- Minister for Environment [2013] WASC, the Supreme Court of Western Australia found the Minister’s agreement decision invalid because the EPA’s decision to report was invalid., The proposal is a strategic environmental assessment for a common user LNG hub precinct for future Browse Basin gas processing in the Kimberley Region. Read more...

Macedon Gas Development

Last updated: January 17, 2012

The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...

Cliff Head Oil Field Development

Last updated: December 22, 2004

Roc Oil (WA) Limited proposes to develop the Cliff Head Oil Field located approximately 20 kilometres (km) south of Dongara. Read more...

North West Shelf Gas Project Additional Liquefied Natural Gas LNG facilities

Last updated: February 11, 2000

Woodside Energy Limited proposes to construct and operate additional Liquefied Natural Gas (LNG) processing trains, the current proposal being for two trains with a total additional capacity of 8 Mtpa at its onshore gas plant on the Burrup. Read more...

White Opal-1 Exploration Well, Cape Range Peninsula, Shire of Exmouth

Last updated: December 11, 1998

The proposal is to drill a land based exploration well on Commonwealth (Navy) land at Point Murat, Cape Range Peninsula. The well will be drilled directly to intersect a target at a depth of about two kilometres below Ningaloo Marine Park. Read more...

Second offshore trunkline and DOMGAS debottlenecking, North West Shelf

Last updated: July 14, 1998

The Proposal is to install a second undersea gas trunk line from the existing offshore Goodwin/North Rankin production platforms to a new terminal located in the existing onshore treatment plant at Withnell Bay on the Burrup Peninsula. Read more...

Appraisal drilling programme for Wonnich field south-west of the Montebello Islands

Last updated: June 19, 1997

The proposal is to carry out a program of appraisal drilling on the Wonnich petroleum field within permit area TP/8. Read more...

Additional facilities for liquefied petroleum gas project within existing onshore treatment plant, Burrup Peninsula

Last updated: August 24, 1993

The proposal is to establish additional facilities for liquefied petroleum gas (LPG) extraction and export within the existing onshore treatment plant at the Burrup Peninsula. The existing Gas Treatment Plant occupies 231ha on a lease at Withnell Bay, near Dampier on the Burrup Peninsula about 1,300km north of Perth. The area within the lease has undergone major development, with the portions of Plant constructed to date consisting of a domestic gas plant, a liquefied natural gas (LNG) plant,... Read more...

Proposed Roller Oilfield development offshore Onslow

Last updated: December 10, 1991

Proposal to develop the Roller Oilfield within permit area TP/3 Part 1, specifically the drilling of a minimum of seven development wells from four monopod structures. Read more...

Proposed exploration drilling programme within permit area TP3 Par 1, offshore Onslow

Last updated: October 25, 1991

Western Australian Petroleum Pty Ltd (WAPET) is operator for the participants in Exploration Permit No. TP/3 Part 1. WAPET has already drilled some 18 wells within the Permit Area, has developed the Saladin, Cowle and Yammaderry oilfields and is currently seeking approval to develop the Roller Oilfield. Over the next five year period, WAPET proposes to drill a further four to twelve exploratory wells within Permit Area TP/3 Part 1. Read more...

Proposed exploration drilling, Exmouth Gulf, Lasmo Oil

Last updated: April 26, 1991

LASMO Oil (Australia) has proposed an offshore exploration drilling program for petroleum within its permit areas EP-342 and TP/9 at the open end of Exmouth Gulf. This proposal seeks environmental approval for the drilling of two wells in 1991 followed by a minimum of three others over the period 1992-1994. Read more...

Cooper No 1 Oil Exploration Permit EP 325 Emouth Gulf

Last updated: June 27, 1989

Minora Resources NL has submitted a proposal to drill a third exploration oil well in its lease, EP 325, Exmouth Gulf. The well is located 13 km south east of the town of Exmouth. Minora propose to use a jack-up rig and drilling would take about 24 days to complete. Drilling is proposed during the winter of 1989. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.