This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 14, 2024
The Mid West Ports Authority is proposing marine infrastructure upgrades at the Port of Geraldton. The Proposal has a disturbance footprint of up to 38 hectares (ha), of which 17 ha is a new footprint and 21 ha the existing port, within a 75 ha development envelope. The Proposal is a significant amendment to the Geraldton Port Enhancement Project and Preparatory Works for the Town Beach Foreshore Redevelopment (Original Proposal) (Ministerial statement 600), and consists of: dredging and land... Read more...Last updated: September 28, 2024
The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island. Read more...Last updated: September 16, 2024
The Proposal is to extend and redevelop the existing Army Groyne into a barge operations facility in South Thomson Bay at Wadjemup / Rottnest Island. The Proposal includes: Dredging for the purpose of construction for a breakwater/laydown area and for a barge turning circle. Use of dredge spoil for re-use as reclamation to create a laydown area. Extension of the existing Army Groyne to create a breakwater. Barge landing ramp. Ferry berth. Small craft landing facility. Fuel storage and... Read more...Last updated: August 12, 2024
The proposal is to develop and operate a general cargo facility within the Port Hedland inner harbour, within the Town of Port Hedland. This proposal has been superseded by the Lumsden Point General Cargo Facility Read more...Last updated: August 2, 2024
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: July 31, 2024
The South West Development Commission is proposing an upgrade to the marine structures that are intended to meet existing demand and future requirements for small craft maritime infrastructure and include new mooring facilities for commercial and recreational vessels, floating jetties, a boat servicing facility, improved public ablution facilities and up upgraded boat launching and storage facilities. Read more...Last updated: July 23, 2024
This document has been prepared for the first future derived proposal of the Koombana Bay Marine Structures Strategic Proposal (Assessment Number 2049 and Ministerial Statement 1226), namely the Casuarina Boat Harbour (Figure 1 Proposal Content Document). This document supports the Department of Transport’s (DoT’s) request to the Environmental Protection Authority (EPA) under section 38E of the Environmental Protection Act 1986 (EP Act) that the referred Casuarina Boat Harbour (CBH) future... Read more...Last updated: July 4, 2024
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: June 13, 2024
Tassal propose to expand its barramundi farm operations to 7 sites spread across the Buccaneer Archipelago, in the Kimberley region. The proposed expansion will be staged over a 10-year period. Read more...Last updated: April 24, 2024
Re-opening of an iron ore mine; construction of associated infrastructure and a port facility on Koolan Island; and subsequent rehabilitation and decommissioning of the site. Read more...Last updated: April 22, 2024
The proposal is to operate the Beenyup Wastewater Ocean Outlets into Marmion Marine Park that are associated with the Beenyup Wastewater Treatment Plant and Advanced Water Recycling Plant. Read more...Last updated: April 17, 2024
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: April 11, 2024
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: April 2, 2024
The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...Last updated: February 19, 2024
The requested change relates to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) for an extension to the Time Limit for Proposal Implementation for the proposal approved under MS 891. With the agreement of the proponent, the Environmental Protection Authority will take no further action in relation to the s.46 inquiry into the proposed changes to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) Read more...Last updated: February 5, 2024
Province Resources Ltd propose to use combined onshore wind and solar energy to produce green hydrogen and ammonia for export to the green energy market. The proposal is distributed across 3 distinct locations within the Shire of Carnarvon, Western Australia. The proposal will comprise the following major elements: • up to 945 ha (6.8 GW) of wind turbines and up to 10,000 ha of solar arrays (5.2 GW) • a new multiuser port facility with a material offloading facility and export terminal •... Read more...Last updated: December 22, 2023
Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...Last updated: November 27, 2023
Woodside Energy Ltd has provided a combined document that relates to both its Commonwealth referral (Environment Protection and Biodiversity Act 1999) and State referral (Environmental Protection Act 1986). The component within State Waters includes drilling and completion, installation, commissioning, operation, well repair and workover and decommissioning of subsea wells and associated infrastructure located in Western Australian State waters, to extract hydrocarbons from the Torosa reservoir... Read more...Last updated: October 19, 2023
Mardie Minerals Pty Ltd has approval to develop a greenfields high quality salt and SoP project and associated export facility at Mardie, approximately 80 km south-west of Karratha, in the Pilbara region of WA. The project will produce a high purity salt product, Sulphate of Potash (SoP) and other products that can be derived from sea water. The Proposal includes the expansion of the approved Mardie Project (Ministerial Statement [MS] 1175) including expanded concentrator and crystalliser ponds... Read more...Last updated: September 4, 2023
K plus S Salt Australia Pty Ltd is seeking approval to construct and operate a 3.5 million tonnes per annum (Mtpa) Solar Salt Project located approximately 40 km south-west of the township of Onslow, within the Shire of Ashburton. Read more...