Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Iron Ore (24) Apply Iron Ore filter
  • Infrastructure (23) Apply Infrastructure filter
  • Land use (8) Apply Land use filter
  • Utilities (8) Apply Utilities filter
  • Industrial (7) Apply Industrial filter
  • Oil and gas (7) Apply Oil and gas filter
  • Gold (3) Apply Gold filter
  • Waste management (3) Apply Waste management filter
  • Copper (2) Apply Copper filter
  • Rare earth elements (2) Apply Rare earth elements filter
  • Salt (2) Apply Salt filter
  • Sand, rock, gravel and clay (2) Apply Sand, rock, gravel and clay filter
  • Aquaculture (1) Apply Aquaculture filter
  • Lithium (1) Apply Lithium filter
  • Manganese (1) Apply Manganese filter
  • Mineral sands (1) Apply Mineral sands filter
  • Nickel (1) Apply Nickel filter
  • Power generation (1) Apply Power generation filter

Filter by current status:

  • Ministerial Statement published (53) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (26) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (3) Apply Assessment has been terminated under s40A of the EP Act filter
  • Assessment on Proponent Information – Request for More Information published (1) Apply Assessment on Proponent Information – Request for More Information published filter
  • Environmental Scoping Document approved (1) Apply Environmental Scoping Document approved filter
  • Response to submission published (1) Apply Response to submission published filter

Filter by preliminary environmental factors:

  • Flora and Vegetation (52) Apply Flora and Vegetation filter
  • Terrestrial Fauna (45) Apply Terrestrial Fauna filter
  • Social Surroundings (35) Apply Social Surroundings filter
  • Inland Waters (18) Apply Inland Waters filter
  • Air Quality (17) Apply Air Quality filter
  • Hydrological Processes (16) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (16) Apply Inland Waters Environmental Quality filter
  • Marine Environmental Quality (16) Apply Marine Environmental Quality filter
  • Subterranean Fauna (16) Apply Subterranean Fauna filter
  • Marine Fauna (14) Apply Marine Fauna filter
  • Benthic Communities and Habitats (13) Apply Benthic Communities and Habitats filter
  • Terrestrial Environmental Quality (9) Apply Terrestrial Environmental Quality filter
  • Coastal Processes (4) Apply Coastal Processes filter
  • Landforms (4) Apply Landforms filter
  • Human Health (3) Apply Human Health filter
  • Greehouse Gas Emissions (1) Apply Greehouse Gas Emissions filter
  • People (1) Apply People filter

Filter by Proponent:

  • Eastern Metropolitan Regional Council (4) Apply Eastern Metropolitan Regional Council filter
  • Forge Resources Swan Pty Ltd (3) Apply Forge Resources Swan Pty Ltd filter
  • Main Roads WA (3) Apply Main Roads WA filter
  • Main Roads Western Australia (3) Apply Main Roads Western Australia filter
  • Atlas Iron Pty. Ltd. (2) Apply Atlas Iron Pty. Ltd. filter
  • BHP Billiton Iron Ore Pty Ltd (2) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Chevron Australia Pty Ltd (2) Apply Chevron Australia Pty Ltd filter
  • Hamersley Iron Pty Limited (2) Apply Hamersley Iron Pty Limited filter
  • NW Interconnected Power Pty Ltd (2) Apply NW Interconnected Power Pty Ltd filter
  • PIOP Mine Co NL (2) Apply PIOP Mine Co NL filter
  • Public Transport Authority (2) Apply Public Transport Authority filter
  • Roy Hill Iron Ore Pty Ltd (2) Apply Roy Hill Iron Ore Pty Ltd filter
  • ACH Minerals Pty Ltd (1) Apply ACH Minerals Pty Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • Ashton Rare Earths Pty Ltd (1) Apply Ashton Rare Earths Pty Ltd filter
  • Australian Gold Reagents Pty Ltd (1) Apply Australian Gold Reagents Pty Ltd filter
  • BHP Billiton Nickel West (1) Apply BHP Billiton Nickel West filter
  • City of Mandurah (1) Apply City of Mandurah filter
  • CSBP Limited (1) Apply CSBP Limited filter
  • DBP Development group Nominees Pty Ltd (1) Apply DBP Development group Nominees Pty Ltd filter
  • Department of Defence (1) Apply Department of Defence filter
  • Department of Primary Industries and Regional Development (1) Apply Department of Primary Industries and Regional Development filter
  • Department of Transport (1) Apply Department of Transport filter
  • Fortescue Metals Group Limited (1) Apply Fortescue Metals Group Limited filter
  • Fortescue Metals Group Ltd (1) Apply Fortescue Metals Group Ltd filter
  • GINDALBIE METALS LTD (1) Apply GINDALBIE METALS LTD filter
  • GrainCorp Liquid Terminals Australia Pty Ltd (1) Apply GrainCorp Liquid Terminals Australia Pty Ltd filter
  • Grange Resources Ltd (1) Apply Grange Resources Ltd filter
  • Hamersley HMS Pty Ltd (1) Apply Hamersley HMS Pty Ltd filter
  • Hypermarket Pty Ltd (1) Apply Hypermarket Pty Ltd filter
  • Iron Ore Holdings Ltd (1) Apply Iron Ore Holdings Ltd filter
  • Kalgoorlie Consolidated Gold Mines Pty Ltd (1) Apply Kalgoorlie Consolidated Gold Mines Pty Ltd filter
  • Kelliher Bros. (1) Apply Kelliher Bros. filter
  • Leichhardt Industrials Pty Ltd (1) Apply Leichhardt Industrials Pty Ltd filter
  • Minister for State Development (1) Apply Minister for State Development filter
  • Mount Gibson Mining Limited (1) Apply Mount Gibson Mining Limited filter
  • NewGen Power Pty Ltd (1) Apply NewGen Power Pty Ltd filter
  • Northern Minerals Limited (1) Apply Northern Minerals Limited filter
  • Polaris Metals Pty Ltd (1) Apply Polaris Metals Pty Ltd filter
  • Port Hedland Port Authority (1) Apply Port Hedland Port Authority filter
  • Reward Minerals (1) Apply Reward Minerals filter
  • Robe River Mining Co. Pty. Ltd (1) Apply Robe River Mining Co. Pty. Ltd filter
  • Rottnest Island Authority (1) Apply Rottnest Island Authority filter
  • St Ives Gold Mining Company Pty Limited (1) Apply St Ives Gold Mining Company Pty Limited filter
  • Subsea 7 Contracting Pty Ltd (1) Apply Subsea 7 Contracting Pty Ltd filter
  • Talison Lithium Australia Pty Ltd (1) Apply Talison Lithium Australia Pty Ltd filter
  • Tellus Holdings Ltd (1) Apply Tellus Holdings Ltd filter
  • UIL Energy (1) Apply UIL Energy filter
  • Venturex Resources Limited (1) Apply Venturex Resources Limited filter
  • Yilgarn Iron Pty Ltd (1) Apply Yilgarn Iron Pty Ltd filter

Filter by region:

  • Pilbara (31) Apply Pilbara filter
  • Perth (24) Apply Perth filter
  • South West (7) Apply South West filter
  • Mid West (6) Apply Mid West filter
  • Kimberley (5) Apply Kimberley filter
  • Goldfields Esperance (4) Apply Goldfields Esperance filter
  • Peel (3) Apply Peel filter
  • Great Southern (2) Apply Great Southern filter
  • Wheatbelt (2) Apply Wheatbelt filter
  • Gascoyne (1) Apply Gascoyne filter

Filter by last updated:

  • (-) Remove 2020 filter 2020
  1. Home
  2. Proposal search
  3. 2020

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Shine iron Ore Project (s46) [2212]

Last updated: May 5, 2020

Change Condition 3 to extend the time limit of authorisation for substantial commencement of the proposal Read more...

Buckland Project

Last updated: April 28, 2020

To develop and operate an iron ore mine, processing facilities and supporting infrastructure, 45 km south-south-east of Pannawonica in the Shire of Ashburton, and a 176 km haul road from the mine site to the customer delivery point near Cape Preston. Read more...

Redhill waste management facility extension

Last updated: April 28, 2020

Expansion of the Redhill landfill Read more...

Perth Children’s Hospital Kids Bridge (the Kids Bridge)

Last updated: April 28, 2020

Main Roads Western Australia (MRWA) is proposing to construct and operate a new pedestrian link bridge (Kids Bridge) that crosses Winthrop Avenue (Ave), between Monash Ave and Aberdare Road. This will connect the northern green space of the Queen Elizabeth II Medical Centre to Kings Park and Botanic Garden (KPBG). The objective of the proposal is to provide direct and safe access for patients, families and staff with respite from the hospital. At present access to KPBG from the hospital... Read more...

Port Hedland Spoilbank Marina

Last updated: April 20, 2020

The Department of Transport is proposing to construct and operate the Port Hedland Spoilbank Marina Proposal, including marine and land-based components within the Town of Port Hedland, Pilbara, WA. The Proposal includes: marina basin, mooring facilities (up to 80 pens), boat launching area, sand trap and entrance channel capital dredging works resulting in up to 900,000 cubic metres (m3) of dredge spoil and dredged to a maximum depth of -2m chart datum (-6m AHD). Dredge spoil will be used... Read more...

Zemira 3D Seismic Survey

Last updated: April 20, 2020

The proposal is to undertake an onshore three-dimensional (3D) seismic survey in the northern Perth Basin. The survey area is about 300 kilometres (km) north of Perth, and its nearest boundary is about 4.5 km north of the town of Eneabba and about 25 km southeast of the town of Dongara. The survey area is situated within four local shires:  Shire of Irwin, Shire of Three Springs, Shire of Mingenew and Shire of Carnamah. The intent of the Zemira 3D Seismic Survey is to collect a high-quality 3D... Read more...

Lumsden Point General Cargo Facility

Last updated: April 14, 2020

The proposal is to develop and operate a general cargo facility within the Port Hedland inner harbour, within the Town of Port Hedland. Read more...

Hazelmere Resource Recovery Park Community Recycling Centre and Waste Transfer Station

Last updated: April 14, 2020

Eastern Metropolitan Regional Council propose to construct and operate a Community Recycling Centre (CRC) and Waste Transfer Station (WTS) within the existing Hazelmere Resource Recovery Park, at Lots 814, 100 and 301 Lakes Road Hazelmere, in the City of Swan. The CRC would be accepting a range of materials for reuse, recycling and disposal from community members, while the WTS would provide for the short-term storage capacity for consolidation of various waste streams including refuse and food... Read more...

Brockman Syncline 4 Iron Ore Project – Marra Mambas Proposal

Last updated: April 6, 2020

Hamersley Iron Pty Limited propose to expand its existing Brockman 4 Syncline Iron Ore Mine. The expansion would include further clearing of up to 4,800 hectares and expand its current development envelope by 2,567 hectares. Additional dewatering would also take place resulting in dewater discharge extending further along Boolgeeda Creek by nine kilometres. Read more...

Greenbushes Lithium Mine Expansion

Last updated: April 6, 2020

Talison Lithium Australia Pty Ltd (Talison) is proposing to expand the existing Greenbushes Lithium Mine that has been operated for over 30 years, to increase the production of spodumene ore and lithium mineral concentrate from the operation. This proposal is an expansion of the existing mining operation and has not previously been assessed by the EPA. The mine is located in the South West of Western Australia, immediately south of the town of Greenbushes, approximately 250 km south east of... Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve

Last updated: April 3, 2020

The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island. Read more...

St Ives Gold Mine – Beyond 2018 Project (Revised Proposal)

Last updated: March 18, 2020

St Ives Gold Mining Company Pty Limited proposes to expand the existing open-cut and underground gold mining developments with 2,061 hectares (ha) of disturbance. The proposal is located in Lake Lefroy approximately 20 kilometres south east of Kambalda (Shire of Coolgardie). The revised proposal would include an additional disturbance of 5000 ha: additional lake-based disturbance of up to 2,000 ha; and additional land-based disturbance of up to 3,000 ha. Read more...

West Pilbara Iron Ore Project Stage 2 - Hardey Proposal (s46) [2182]

Last updated: March 17, 2020

Changes to conditions 3-1 and 3-2 in order to extend the Time Limit for Proposal Implementation. Read more...

Jimblebar Optimisation Project

Last updated: March 17, 2020

The Jimblebar Optimisation Project is a revision of the existing Jimblebar Iron Ore Mine approved under Ministerial Statements 683, 809 and 857. The Revised Proposal is for mining operations at Jimblebar, located approximately 40 km east of the town of Newman. Mining of iron ore deposits will be undertaken above and below the water table. Mining operations will include open pits, overburden storage areas and the construction and operation of associated mine, processing and rail infrastructure.... Read more...

Quarry at Lot 150 Clydesdale Road, Grass Valley

Last updated: March 16, 2020

Resource Group (WA) Pty Ltd proposes to construct a hard rock quarry at Lot 150 (792) Clydesdale Road, Grass valley. Holcim (Aust) Pty Ltd will be the eventual operators of the quarry. The proposal will extract, crush and screen approximately seventy thousand tonne (70,000tn) of hard rock per year with an approximate life of the quarry being 20-30 years. The proposal would require the clearing of 8.41 hectares (ha) of native vegetation and have a developmental envelope of 15.2 ha.   Read more...

Corunna Downs Project

Last updated: March 12, 2020

Atlas Iron Pty. Ltd (the proponent) propose to develop the Corunna Downs Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 23.3 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of 6 years. Associated infrastructure will include waste rock dumps, a mine operation centre, borefield and... Read more...

Rottnest Lodge Development

Last updated: February 24, 2020

The Rottnest Island Authority proposes to redevelop the Rottnest Lodge on Rottnest Island, WA. The proposal will involve the demolition and/or refurbishment of existing accommodation, the construction of new accommodation and associated infrastructure. The proposal will involve clearing of up to 0.5 ha of native vegetation within the 1.8 ha development envelope. Read more...

Kwinana Bulk Liquid Terminal

Last updated: February 10, 2020

GrainCorp Liquid Terminals Australia Pty Ltd proposes to construct and operate a bulk liquids terminal at Lot 108 Kwinana Beach Road, Kwinana Beach within the Kwinana Strategic Industrial Area. The proposal would involve disturbance of approximately 2.7 hectares and site activities include the transfer and storage of bulk liquids including urea ammonium nitrate liquid fertiliser solution, tallow, vegetable and used cooking oils, industrial solvent, and caustic soda 33%. Read more...

Albany Ring Road Stage 3a

Last updated: February 3, 2020

Main Road WA proposes to construct and operate 5 km of duel carriageway around the City of Albany to allow heavy freight vehicles to bypass local traffic to access the Port of Albany. The proposal involves clearing of 11.6 ha of native vegetation and 8.6 ha of non-native vegetation within a 96 ha development envelope. Read more...

Additional Tunnel Kiln (Whitemans Brick Plant) & Fluoride Scrubber (Midland Brick Operations) (S46) [2068]

Last updated: January 30, 2020

The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of adding the proposal description and changing the implementation conditions relating to the Additional Tunnel Kiln & Fluoride Scrubber proposal, in order to remove completed conditions, and conditions and commitments managed by other agencies, incorporate relevant commitments onto conditions and updated the remaining conditions. Read more...

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.