Last updated: December 21, 2020
The proponent, Shark Bay Resources Pty Ltd, operates two solar salt fields and an associated port facility at Useless Loop in the Shark Bay area of Western Australia. The site is located approximately 25 kilometres west southwest of Denham. The proponent is proposing to undertake maintenance and capital dredging of up to 100,000 cubic metres from the berth pocket and entrance channel of the port to restore navigable depths. The berth pocket dredge area is surrounded by, but excised from, the... Read more...Last updated: December 21, 2020
In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...Last updated: December 16, 2020
The City of Canning proposes to extend Southern Link Road by 0.45 kilometres to provide a connection between Grey Street and Gerard Street. The proposal is aligned along the eastern boundary of Carousel Swamp; a Conservation Category Wetland which contains the Shrublands and Woodlands on Muchea Limestone Swan Coastal Plain Threatened Ecological Community. The total extent of the proposed development envelope is 1.15 ha. Read more...Last updated: December 15, 2020
The Public Transport Authority (PTA) proposes to construct and operate a new 13 kilometre (km) dual railway track between Malaga and Ellenbrook. The proposed Malaga to Ellenbrook extends from the proposed Bayswater to Malaga railway line. The proposal includes three new stations at Malaga, Whiteman Park and Ellenbrook with intermodal rail, bus, carpark and active mode (cycling and walking) facilities at each station. A potential future station is also proposed at Bennett Springs and rail... Read more...Last updated: December 14, 2020
The Commissioner of Main Roads Western Australia is proposing to construct and operate the northern section and upgrade the central section of the Bunbury Outer Ring Road (BORR). The proposal includes 19km of freeway-standard dual carriageway and associated interchanges between Forrest Highway and Boyanup-Picton Road (northern section) and between Boyanup-Picton Road and South West Highway (central section). The proposal would require the clearing of up to 73 hectares of native vegetation... Read more...Last updated: December 14, 2020
Main Roads Western Australia is proposing to construct and operate the southern section of the Bunbury Outer Ring Road (BORR). The proposal includes 10.5 km of freeway-standard dual carriageway, 3 km of rural distributor roads and other associated road-infrastructure. The BORR southern section will connect to the proposed northern and central sections of BORR near South West Highway, which together will complete a bypass around Bunbury City from Forest Highway to Bussell Highway. The BORR... Read more...Last updated: December 2, 2020
Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to six wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...Last updated: November 30, 2020
Austral Bricks is proposing the redevelopment of the Cardup Brickworks, which includes the expansion of the existing factory, increasing the design capacity from 200,000 to 250,000 tonnes per annum. The site is located in the southern extremity of Byford. Additional ancillary improvements include the installation of a new baghouse scrubber and a new primary crusher located in the floor of the pit. The proposal would include: Expanding the capacity from 200,000 to 250,000 tonnes per annum; ... Read more...Last updated: November 23, 2020
Atlas Iron Pty. Ltd (the proponent) propose to develop the Miralga Creek DSO Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 8 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of four to five years. Associated infrastructure will include waste rock dumps. Existing borefield and... Read more...Last updated: November 9, 2020
NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub. The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020. This referral is for ... Read more...Last updated: November 4, 2020
The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area. The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation that includes... Read more...Last updated: November 4, 2020
Audalia Resources Limited (Audalia) is proposing to construct and operate a vanadium, titanium and iron ore mine approximately 100 kilometres (km) west of Norseman, Western Australia (WA). The Medcalf Project, located in the Bremer Range, Lake Johnston region of Western Australia, approximately 470 km east south-east of Perth. The proposal includes three separate open pits and requires up to 650 ha of native vegetation clearing. Mining will occur above groundwater. The proposal includes the... Read more...Last updated: November 3, 2020
The construction, operation and maintenance of a nominal 320 megawatt combined cycle base load power plant at Kwinana, as documented in schedule 1 of the ministerial statement. Read more...Last updated: October 26, 2020
The proponent, Cliffs Asia Pacific Iron Ore Pty Ltd (Cliffs), owns and operates iron ore mines at the Windarling Range, the Mt Jackson Range and the Deception Deposit (collectively known as the "Yilgarn Operations") within the Shire of Yilgarn and Shire of Menzies. The Yilgarn Operations are authorised under seven Ministerial Statements issued between 2003 and 2012 by the Western Australian Minister for Environment under section 45(5) of the EP Act. These are: Ministerial Statement... Read more...Last updated: October 26, 2020
Change to Condition 9 (Rehabilitation) to remove reference to northern portion of Lot 2 Read more...Last updated: October 15, 2020
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: October 13, 2020
The proposal is the construction and operation of an open cut gold mine and associated infrastructure, located approximately 330 km east-north-east of Kalgoorlie and 200 km east of Laverton. Read more...Last updated: October 12, 2020
The Public Transport Authority (PTA) proposes to extend the existing Joondalup railway line by 7.3 kilometres from Butler Station to the suburb of Eglinton in the City of Wanneroo. The proposal is to construct and operate the rail extension and includes two new intermodal (rail, bus, ‘park and ride’, ‘kiss and ride’, walk and cycle) transit stations at Alkimos and Eglinton. The PTA will operate train services between Perth and Eglinton Stations and bus services from the Alkimos and Eglinton... Read more...Last updated: October 12, 2020
Change to condition 3 – Time Limit for Proposal Implementation. Extension of time limit of five years to 18 November 2025. Read more...Last updated: October 9, 2020
The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford and... Read more...