Last updated: July 16, 2018
The proposal is to develop a silver, lead and zinc mine, associated infrastructure and processing facilities approximately 50 kilometres north of Kununurra, with the concentrate produced transported by road and shipped through Wyndham Port. Read more...Last updated: December 12, 2018
The proposal is to construct and operate a dual carriageway road from the current terminus of Roe Highway at Kwinana Freeway in Jandakot to Stock Road in Coolbellup., Note:, The decision of the Supreme Court of Western Australia in, Save Beeliar Wetlands (Inc) and Anor v. Jacob, [2015] WASC 482 was overturned by the Court of Appeal on Friday 15 July 2016 in, Access the Court of Appeal decision, Jacob v Save Beeliar Wetlands (Inc), [2016] WASCA 126. The effect of the Court of Appeal decision is... Read more...Last updated: November 12, 2018
The proposal is to construct and operate an iron ore export facility at Cape Preston East in the Pilbara region of WA. Read more...Last updated: February 5, 2018
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Read more...Last updated: November 12, 2018
The proposal is to develop and operate an iron ore mine approximately 50 km west-northwest of Paraburdoo, Western Australia, a 20 km long gas pipeline corridor, and a 150 km long rail transport corridor that would connect the proposed mine to the West Pilbara Iron Ore Project Stage 1 infrastructure. Read more...Last updated: January 29, 2018
Ray Village Aged Services (Inc) trading as Capecare is proposing to develop a 1.28 ha portion of Armstrong Reserve, Naturaliste Terrace, Dunsborough in order to construct an aged care facility. The proposal will require clearing 9020m2 of native vegetation. The proposed aged care facility will consist of an adult day care centre, independent and supported living accommodation units, administration offices and community facilities including meeting rooms for the CWA. Read more...Last updated: October 8, 2018
The Proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. Read more...Last updated: August 13, 2018
The proposal is to expand CSBP's Kwinana Ammonium Nitrate Production Facility (ANPF) by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tpa to 936,000 tpa. Read more...Last updated: December 12, 2018
The proposal is to extend the existing Red Hill Quarry to the west (West Quarry Pit Extension Area A) and north-west (West Quarry Pit Extension Area B) of the current pit, and extend the existing stockpile and dispatch area, and install a quaternary crusher. Read more...Last updated: June 11, 2018
The proposal is for the construction and operation of a technical ammonium nitrate production facility (TANPF) on Site D within the King Bay/Hearson Cove Industrial Estate on the Burrup Peninsula. The proposal is located approximately 13 kilometres north-west of Karratha. Read more...Last updated: October 15, 2018
Alcoa proposes to expand the Wagerup Refinery through construction of a third production unit. The proposed production increase to approximately 4.7 Mtpa alumina is to be achieved by a combination of new equipment and upgrade of existing equipment in order to achieve an increase in both capacity and efficiency. As the Wagerup Refinery has been subject to previous assessments, this represents a revised proposal pursuant to s 45B of the EP Act. The current maximum production permitted under the... Read more...Last updated: April 4, 2018
Griffin Power Pty Ltd, proposes to construct and operate a 200MW coal-fired power station known as the Bluewaters Power Station Phase II (Bluewaters II) adjacent to the proposed Bluewaters Power Station (Bluewaters I) on a site located approximately 4km north-east of Collie. It would be a subcritical coal-fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters II Power Station would supplement the Bluewaters I Power Station and supply electricity... Read more...Last updated: April 4, 2018
Griffin Energy Pty Ltd, proposes to construct and operate the 200MW Bluewaters Power Station on a site located approximately 4km north-east of Collie. It will be a subcritical coal fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters Power Station will supply electricity to customers in the proposed Coolangatta Industrial Estate, or via the South West Interconnected System (SWIS). Read more...Last updated: April 23, 2018
The proposal is to expand an existing salt mining operation by constructing a new primary concentration pond (which would lie outside the existing mining leases) and additional brine, bitterns and crystallization ponds within the existing leases. The current operation is located on coastal flats near Port Hedland with the primary concentration ponds 30 km to the east and the brine ponds 10 km to the east connected by an aqueduct. Once the brine is fully saturated it is pumped to crystallisation... Read more...Last updated: April 18, 2018
Gold Road Resources Limited propose to develop a gold mine know as the Gruyere Gold Project located approximately 200 km north-east of Laverton. The proposal includes clearing of no more than 2,260 ha of vegetation and groundwater dewatering for mining and processing. Read more...Last updated: August 10, 2018
Sheffield Resources Limited is seeking approval to develop the Thunderbird Mineral Sands Project located on the Dampier Peninsula, approximately 75 kilometres southwest of Derby, Western Australia. The proposal is for a mineral sands operation with an estimated 40 year life of mine. Mineral product will be mined from the Thunderbird Deposit and processed onsite before being transported by road to the Derby Wharf for storage and subsequent export. Read more...Last updated: July 16, 2018
The proposal is to construct and operate a Waste-to-Energy (WtE) and Materials Recovery Facility (MRF) at the Boodarie Strategic Industrial Area, Port Hedland. The proposed facility would accept various wastes, recover materials that can be economically recycled via the MRF and convert suitable remaining waste to electrical power in a WtE plant. Read more...Last updated: September 17, 2018
The proposal is for the Stage 2 expansion of the Murrin Murrin Nickel-Cobalt mining and processing operation (Stage 1), 60 kilometres east of Leonora. The Stage 2 expansion includes the mining of additional ore; an expansion of the processing plant to process additional ore; and the development of additional infrastructure associated with mining and processing of the ore. Read more...Last updated: December 4, 2018
The proposal is to duplicate the existing Advanced Water Recycling Plant (AWRP) at the Beenyup facility in Craigie. The proposal also includes the construction of two water recharge sites and pipeline infrastructure along a 12.8 km route through the suburbs of Woodvale, Wanneroo, Ashby and Neerabup to recharge approximately 14 GL of recycled water to the Leederville and Yarragadee aquifers. The proposal forms Stage 2 of the Perth Groundwater Replenishment Scheme (GRWS) with the expansion of 14... Read more...