This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 3, 2010
The proposal is for the dredging of 12 million cubic metres of sediments to widen and deepen the existing shipping channel into Princess Royal Harbour and to extend the shipping channel into King George Sound to allow access of cape-size vessels to the Port. Dredged material will be disposed offshore at a location in King George Sound. A portion of the dredged material will be used for reclamation of up to 9 hectares of Princess Royal Harbour to construct a new berth (Berth 7). Read more...Last updated: December 3, 2010
Inquiry under s46 into changing the conditions of Ministerial Statement 549 . Read more...Last updated: November 4, 2010
Identification of potential corridors and areas for future installation of water and waste water pipelines and associated infrastructure throughout the southern suburbs of Perth. Read more...Last updated: October 28, 2010
The proposal is to develop an iron ore mine at the Koolyanobbing Iron Ore Project-Mt Jackson J1 Deposit (Mt Jackson J1 Deposit), located approximately 110 kilometres (km) north-north-east of Southern Cross in the Shire of Yilgarn. The proposal includes two mine pits to extract approximately 33 million tonnes of iron ore and associated mining infrastructure. The proposed mine required disturbance of approximately 605 hectares (ha) of native vegetation for pits, associated mine infrastructure,... Read more...Last updated: October 15, 2010
Lot 21 Webster Road, Forrestfield has an area of 1.84 ha and is located in the Shire of Kalamunda. It is zoned Industrial in the Metropolitan Region Scheme and Light Industry in the Shire of Kalamunda District Planning Scheme No. 2. Lot 21 is adjacent to, but not included in, Bush Forever Site 319. An application to subdivide Lot 21 Webster Road, Forrestfield into seven industrial lots was initially referred to the EPA pursuant to Section 38 of the, Environmental Protection Act 1986, (EP Act)... Read more...Last updated: October 3, 2010
Construction of warehouse and transport depot on Lot 46 Tomah Road, Welshpool and the provision of an environmental offset by protecting 21.2 hectares of significant wetland and native vegetation at Lot 23 Ioppolo Road, Chittering. Read more...Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: September 6, 2010
Revised proposal by the Esperance Port Authority (EsPA) to increase iron ore export from the Esperance Port at a rate of up to 8 million tonnes per annum (Mtpa). Read more...Last updated: August 6, 2010
The Water Corporation submitted a proposal 'Burrup Peninsula Desalinated Water and Seawater Supplies Project' in May 2001 (Water Corporation, 2001a) to service the requirements of new industrial developments on the Burrup Peninsula. The proposed scheme was designed to supply seawater and desalinated water to the Syntroleum Sweetwater Corporation (Syntroleum) gas to liquids plant, with additional capacity to supply one or possibly two other process plants. The EPA released its report (... Read more...Last updated: July 14, 2010
The proposal is for the subdivision of approximately 32 hectatres of land being a portion of Lot 4 bounded by Underwood Avenue to the north, Selby Street to the east, UWA's agricultural field station and research centre to the west, and the Water Corporation Workshop Depot Training Centre and Royal Perth Rehabilitation Hospital in the south. The Subiaco Waste Water Treatment Plant (WWTP) is located immediately to the south west of the site. The subdivision proposes 260 lots for residential... Read more...Last updated: July 8, 2010
BHP Billiton Iron Ore is proposing to develop the Orebody 24 (OB24) deposit located north of Orebody 25 (OB25) Mine, and approximately 10 km north-east of the town of Newman in the Pilbara Region. New and existing OB25 infrastructure would be utilised. Read more...Last updated: June 30, 2010
The proposal is to construct and operate a minimum 50 GL/annum and up to 100 GL/annum desalination plant on Lots 32 and 33, and Part Lot 8 Taranto Road, Binningup; marine inlet/outlet pipes; and a water supply pipeline to transport potable water to the Integrated Water Supply Scheme via a storage facility near Harvey. Read more...Last updated: June 28, 2010
The construction and operation of a seawater desalination plant at a site in the Kwinana / East Rockingham area, and associated seawater intake, concentrated seawater discharge pipelines, and product pipeline to Tamworth Hill or Thomson’s Reservoir. Upgrading of the capacity of the plant to 45 Gigalitres per year at the Kwinana site will include increasing the production of potable water, use of seawater, and discharge of concentrated seawater and further options for combining intake seawater... Read more...Last updated: June 15, 2010
The strategic proposal is to: extend the Leeuwin Naturaliste National Park into the western part of Sussex Location 413; and develop the eastern part of Sussex Location 413 for tourism and residential purposes with associated public open space and foreshore reserves as generally depicted on the Development Guide Plan. Read more...Last updated: March 23, 2010
Inquiry under s46 into a proposed change to environmental conditions for the construction and operation of a brick making facility on Lot 1 on Plan 16479 Military Road, Bellevue, the subject of previous Ministerial Statements 002 and 012. Since the original assessment in 1987, more has become known about brickwork emissions and cumulative impacts in the Swan Valley. Read more...