Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • EPA Board Meetings
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • (-) Remove Utilities filter Utilities

Filter by current status:

  • Decision on whether to assess has been published (16) Apply Decision on whether to assess has been published filter
  • Ministerial Statement published (8) Apply Ministerial Statement published filter
  • Environmental Scoping Document approved (2) Apply Environmental Scoping Document approved filter
  • Assessment on Proponent Information – public submission period closed (1) Apply Assessment on Proponent Information – public submission period closed filter
  • Response to submission published (1) Apply Response to submission published filter
  • Seven-day public comment period closed (1) Apply Seven-day public comment period closed filter

Filter by relevant environmental factors:

  • Social Surroundings (16) Apply Social Surroundings filter
  • Terrestrial Fauna (14) Apply Terrestrial Fauna filter
  • Flora and Vegetation (13) Apply Flora and Vegetation filter
  • Inland Waters (11) Apply Inland Waters filter
  • Marine Environmental Quality (7) Apply Marine Environmental Quality filter
  • Marine Fauna (7) Apply Marine Fauna filter
  • Benthic Communities and Habitats (6) Apply Benthic Communities and Habitats filter
  • Air Quality (4) Apply Air Quality filter
  • Terrestrial Environmental Quality (4) Apply Terrestrial Environmental Quality filter
  • Greenhouse Gas Emissions (3) Apply Greenhouse Gas Emissions filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • Coastal Processes (1) Apply Coastal Processes filter

Filter by Proponent:

  • Main Roads Western Australia (6) Apply Main Roads Western Australia filter
  • Water Corporation (3) Apply Water Corporation filter
  • Public Transport Authority (2) Apply Public Transport Authority filter
  • Alinta DEWAP Pty Ltd (1) Apply Alinta DEWAP Pty Ltd filter
  • APA Northern Goldfields Interconnect Pty Ltd (1) Apply APA Northern Goldfields Interconnect Pty Ltd filter
  • City of Canning (1) Apply City of Canning filter
  • Colonial Marine Consultants Pty Ltd (1) Apply Colonial Marine Consultants Pty Ltd filter
  • Commissioner of Main Roads (1) Apply Commissioner of Main Roads filter
  • Energy Resources Limited (1) Apply Energy Resources Limited filter
  • Gascoyne Gateway Ltd (1) Apply Gascoyne Gateway Ltd filter
  • GrainCorp Liquid Terminals Australia Pty Ltd (1) Apply GrainCorp Liquid Terminals Australia Pty Ltd filter
  • Harvey Water (1) Apply Harvey Water filter
  • Kimberley Marine Support Base Pty Ltd (1) Apply Kimberley Marine Support Base Pty Ltd filter
  • Main Roads WA (1) Apply Main Roads WA filter
  • Mungalalu Truscott Airbase Pty Ltd (1) Apply Mungalalu Truscott Airbase Pty Ltd filter
  • Pilbara Energy (Generation) Pty Ltd (1) Apply Pilbara Energy (Generation) Pty Ltd filter
  • Public Transport Authority of Western Australia (1) Apply Public Transport Authority of Western Australia filter
  • Shark Bay Resources Pty Ltd (1) Apply Shark Bay Resources Pty Ltd filter
  • Southern Ports Authority (1) Apply Southern Ports Authority filter
  • The GM Giacci Family Trust (1) Apply The GM Giacci Family Trust filter
  • WA Offshore Windfarm Pty Ltd (1) Apply WA Offshore Windfarm Pty Ltd filter

Filter by region:

  • Perth (13) Apply Perth filter
  • South West (5) Apply South West filter
  • Pilbara (4) Apply Pilbara filter
  • Kimberley (3) Apply Kimberley filter
  • Gascoyne (2) Apply Gascoyne filter
  • Mid West (2) Apply Mid West filter
  • Goldfields Esperance (1) Apply Goldfields Esperance filter

Filter by last updated:

  • 2023 (1) Apply 2023 filter
  • 2022 (8) Apply 2022 filter
  • 2021 (8) Apply 2021 filter
  • 2020 (8) Apply 2020 filter
  • 2019 (4) Apply 2019 filter
  1. Home
  2. Proposal search
  3. Utilities

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Manuwarra Red Dog Highway – Revised Proposal

Last updated: February 15, 2023

In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...

Limestone Quarry, Lot 4 Binningup Road, Binningup

Last updated: November 14, 2022

GM Giacci Family Trust propose to extract limestone from Lot 4 Binningup Road, Binningup, in the Shire of Harvey. The limestone would be extracted in seven stages and would involve crushing and screening on site. The proposal would include 26 hectares of disturbance on previously cleared farmland. Read more...

Turkey Point Access Road and Bridge

Last updated: July 7, 2022

The Proposal is to develop a new bridge with a single lane dual carriage road and dual use path over the Preston River, to Turkey Point, Bunbury, Western Australia. The Proposal requires a disturbance footprint of 9.59 ha within the overall Proposal Development Envelope (DE) of 11.34 ha. Subtropical Temperate Coastal Saltmarsh Threatened Ecological Community (VT03 and VT04) is present within the Proposal DE and will require clearing of approximately 1.36 ha. 1.22 ha has been identified as... Read more...

Northern Goldfields Interconnect Pipeline

Last updated: June 14, 2022

APA Northern Goldfields Interconnect Pty Ltd proposes to construct and operate the Northern Goldfields Interconnect Pipeline. The 300 mm diameter buried gas pipeline will extend for approximately 580 km, starting from Ambania (50 km east of Geraldton) to 40 km south of Leinster where it will connect into the existing Goldfields Gas Pipeline. The project will connect existing gas assets in the Mid West region with existing gas assets in the Northern Goldfields region. The proposal includes... Read more...

Single Jetty Deep Water Port & Renewable Hub

Last updated: May 31, 2022

Gascoyne Gateway Ltd proposes to construct and operate a multi-use single jetty and associated shore-based activities approximately 10 kilometres south of Exmouth on the western and eastern sides of Minilya-Exmouth Road. The development envelope is approximately 3.8 km 2 in size and includes a single access jetty, onshore strategic port land, renewables precinct, desalination infrastructure and fuel storage. Read more...

Brine Pipeline and Outfall

Last updated: May 25, 2022

Harvey Water propose to construct and operate a pipeline and ocean outfall to dispose brine wastewater. The pipeline will be located between the Kemerton Strategic Industrial Area and the Indian Ocean south of Binningup in the Shire of Harvey. The pipeline will convey brine to a single outlet diffuser outfall. The outfall will be located approximately 400 m from the shoreline and will be installed under the seabed by horizontal directional drilling from the coast. The outlet pipe will protrude... Read more...

Malaga to Ellenbrook Rail Works

Last updated: March 14, 2022

The Public Transport Authority (PTA) proposes to construct and operate a new 13 kilometre (km) dual railway track between Malaga and Ellenbrook. The proposed Malaga to Ellenbrook extends from the proposed Bayswater to Malaga railway line. The proposal includes three new stations at Malaga, Whiteman Park and Ellenbrook with intermodal rail, bus, carpark and active mode (cycling and walking) facilities at each station. A potential future station is also proposed at Bennett Springs and rail... Read more...

Southern Link Road (stage 3)

Last updated: February 21, 2022

The City of Canning proposes to extend Southern Link Road by 0.45 kilometres to provide a connection between Grey Street and Gerard Street. The proposal is aligned along the eastern boundary of Carousel Swamp; a Conservation Category Wetland which contains the Shrublands and Woodlands on Muchea Limestone Swan Coastal Plain Threatened Ecological Community. The total extent of the proposed development envelope is 1.15 ha. Read more...

Byford Rail Extension

Last updated: February 1, 2022

The Public Transport Authority (PTA) proposes to construct and operate 8 km of new railway (including dual tracks and associated rail infrastructure), between Armadale and Byford. The proposal includes modification to the existing Armadale Station and construction and operation of a new station at Byford. The proposal includes the replacement of level crossings with grade separated crossings, either road over rail or rail over road. The proposal involves clearing of up to 50 hectares (ha) of... Read more...

WA Offshore Windfarm Project

Last updated: November 30, 2021

WA Offshore Windfarm Pty Ltd is proposing the construction, operation and decommissioning of the Western Australian Offshore Windfarm project. The project will be located approximately 5.5 km off the coast between Preston Beach and Myalup and will have a generation capacity of up to 300 MW. The Project will comprise up to 37 offshore wind turbine generators (WTGs) with supporting offshore and onshore electrical assets to transfer energy generated by the windfarm to the existing electricity... Read more...

Swan River Crossings

Last updated: October 25, 2021

Main Roads Western Australia (Main Roads) is proposing to build the Swan River Crossings (the Proposal) that includes the construction of new road and rail bridges, the upgrading of the existing rail bridge and the demolition of the existing Fremantle Traffic Bridge in Fremantle, Western Australia. The proposals location includes the Road and rail corridor along Queen Victoria Street, Fremantle from Tydeman Road in the north to Canning Highway south of the Swan River. And the eastern side of... Read more...

Shark Bay Resources Maintenance Dredging

Last updated: October 21, 2021

The proponent, Shark Bay Resources Pty Ltd, operates two solar salt fields and an associated port facility at Useless Loop in the Shark Bay area of Western Australia. The site is located approximately 25 kilometres west southwest of Denham. The proponent is proposing to undertake maintenance and capital dredging of up to 80,000 cubic metres from the entrance channel of the port and seabed levelling of 10,000 cubic metres in the berth pocket to restore navigable depths. The development envelopes... Read more...

Port Hedland Power Station Expansion

Last updated: September 13, 2021

Alinta Energy (subsidiary of Alinta DEWAP Pty Ltd) currently owns and operates the existing Port Hedland Power Station (PHPS) located within the Boodarie Strategic Industrial Area approximately 12 km south of the Port Hedland town centre and approximately 5 km west of South Hedland, ., The Proposal utilises new technologies providing more energy efficient and reliable power to customers in the Port Hedland area. This will include the installation of a 60 Megawatts (MW) natural gas fuelled... Read more...

Barrambie Way Wastewater Pipeline

Last updated: June 28, 2021

The Water Corporation are proposing to construct a new 12.5 km pressured wastewater pipeline, primarily along Gnangara Road, from the Barrambie Way Sewerage Pumping Station in Ellenbrook to the Gnangara Branch Sewer in Wangara. The total disturbance area for the proposal is 30 ha, with a total clearing of no more than 0.3 ha of native vegetation. Read more...

Onslow Seawater Desalination Plant

Last updated: May 31, 2021

The Water Corporation propose to construct a seawater desalination plant to supply potable water to the town of Onslow, WA. Seawater intake and brine wastewater release will occur in Beadon Bay, approximately 1 km seaward from the shoreline. The desalination processing facility is to be located at Lot 551, 552 and/or 553 Beadon Creek Road, Onslow. The proposal will involve the installation of permanent subtidal infrastructure in Beadon Bay (intake head, brine diffusers and transport pipes), a... Read more...

Romanesque 3D and Black Cormorant 2D Seismic Acquisition Survey

Last updated: February 15, 2021

Energy Resources Ltd proposes to undertake 3D (Romanesque) and 2D (Black Cormorant) seismic acquisition surveys to map the subsurface geology of an area within petroleum exploration permits EP 389 (R4), EP 440 (R1), and petroleum production licences L 18 and L 19.  The proposal is located within the Shire of Gingin.   The Romanesque 3D seismic acquisition survey comprises of 594 line kilometres of seismic lines plus 72 line kilometres of contingent lines.  The Black Cormorant 2D seismic... Read more...

Pilbara Energy Generation Power Station

Last updated: February 1, 2021

PEG proposes to construct and operate 14 new gas-fired reciprocating engines with a combined maximum installed capacity of 165 MW. It is expected the average annual throughput of the facility will be approximately 150 MW. The 165 MW power station is expected to result in 609,696 tCO2-e. The proposed PEG power station is located next to the existing Solomon power station and replaces the need for 221 MW power at Iron Bridge, which would have resulted in 1,196,423 tCO2-e. FMG have submitted a... Read more...

Bunbury Outer Ring Road (Northern and Central Sections)

Last updated: December 14, 2020

The Commissioner of Main Roads Western Australia is proposing to construct and operate the northern section and upgrade the central section of the Bunbury Outer Ring Road (BORR).   The proposal includes 19km of freeway-standard dual carriageway and associated interchanges between Forrest Highway and Boyanup-Picton Road (northern section) and between Boyanup-Picton Road and South West Highway (central section).  The proposal would require the clearing of up to 73 hectares of native vegetation... Read more...

Derby Barge Facility

Last updated: October 5, 2020

CMC proposes to construct and operate a barge loading/unloading facility (Derby barge facility) within the Port of Derby, immediately to the north of the existing Derby jetty.   The proposal would require a total disturbance of 3.5 hectares(ha), which includes 1.66 ha of land reclamation and 1.84 ha harbour basin and dredging to a depth of -1.0 metre Australian Height Datum (AHD).  The proposed facility would include a purpose-built barge loading/unloading facility, associated servicing (... Read more...

West Bay Barge Landing Maintenance Dredging

Last updated: August 31, 2020

The West Bay Barge Landing has been in operation since 1944 and is located approximately 7 km east of the Mungalalu Truscott Airbase, in the Kimberley Region. The site is approximately 520 km west southwest of Darwin and 617 km northeast of Broome and is located on the Anjo Peninsula on the northern tip of Western Australia. The proponent, Mungalalu Truscott Airbase Pty Ltd, is proposing to dredge 22,000m 3 of the barge landing to restore safe navigable depths. Disposal of dredged material is... Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.