This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 26, 2012
The Environmental Protection Authority has completed its assessment of the application to amend the Environmental Protection (Western Power Transmission Substation Noise Emissions) Approval 2005 made by Western Power to the Minister for Environment on 21 September 2011. The application was referred to the EPA for assessment under regulation 17(9) of the Environmental Protection (Noise) Regulations 1997. Read more...Last updated: February 28, 2012
The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...Last updated: February 28, 2012
Mount Gibson Mining Limited proposes to mine and process iron ore (hematite and magnetite) from Extension Hill and Extension Hill North. The proposal also includes the construction of a pipeline to transport the magnetite slurry to Geraldton Port, and infrastructure at the port to strip the ore from the slurry for export. The operation will yield approximately 13 million tonnes of hematite over 8 years and 230 million tonnes of magnetite over 20 years. Extension Hill and Extension Hill North... Read more...Last updated: January 17, 2012
The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...Last updated: November 22, 2011
The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...Last updated: November 16, 2011
Inquiry under s46 of the EP Act to replace condition 4-4 of Ministerial Statement 399 . Read more...Last updated: November 1, 2011
Proposal under section 46 of the, Environmental Protection Act 1986, to change condition 8-1 of Ministerial Statement 840. Read more...Last updated: August 5, 2011
The proposal is to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are eleven separate looping sections proposed from south of Dampier to Wagerup West. Read more...Last updated: August 1, 2011
The proposal is to increase the mine dewatering rate up to 50 Gigalitres per annum and to inject surplus water into two brackish and one saline injection zones at the Christmas Creek Mine. Read more...Last updated: June 30, 2011
The proposal is to expand existing wharf facilities to increase storage capacity and improve the efficiency of Dampier's port in general. The expansion involves the construction of a land-backed wharf, 300m jetty, lay down areas, access road and associated infrastructure. The wharf and lay down area would be constructed using reclaimed material from the dredging required to improve the approach and berthing channels. Read more...Last updated: June 2, 2011
Inquiry under s46 to amend condition 5-1 of Ministerial Statement 847 . Read more...Last updated: March 24, 2011
Proposal to deepen the Fremantle Inner Harbour, Entrance Channel and the Deep Water Channel, and further reclamation at Rous Head by Fremantle Ports. Read more...Last updated: March 14, 2011
Oakajee Rail Development is a component of the larger Oakajee Port and Rail Development. The proposed heavy haulage railway and the associated facilities covered in this proposal include 570 kilometres (km) of railway and associated rail infrastructure extending in a north-easterly direction from the North West Coastal Highway (NWCH) approximately 1.5km south of Olsen Road at Oakajee, approximately 24km north of Geraldton, to the Jack Hills mining operations located approximately 500km to the... Read more...Last updated: March 14, 2011
The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...Last updated: March 11, 2011
The proposal is to mine hematite and magnetite iron ore from the Blue Hills North and Terapod deposits, and construction of associated mine infrastructure, upgraded access road to Morawa, Tilley Siding, and powerline corridor in the Midwest region of Western Australia. Read more...Last updated: March 10, 2011
The proposal is to develop a wellfield on the Blackwood Plateau near Jarrahwood and to supply the groundwater from the South West Yarragadee aquifers into the Integrated Water Supply Scheme (IWSS). The proposed wellfield would comprise five well sites with two wells at each site drawing from the Yarragadee Formation Unit 1 and Unit 3 aquifers, approximately 400m and 700m respectively from the surface (termed the eastern split wellfield), providing a maximum of 45 GL/yr into the IWSS through a... Read more...Last updated: January 20, 2011
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...Last updated: January 19, 2011
Inquiry under s46 into a request to change the conditions of Ministerial Statement 757 . Read more...Last updated: December 3, 2010
The proposal is for the dredging of 12 million cubic metres of sediments to widen and deepen the existing shipping channel into Princess Royal Harbour and to extend the shipping channel into King George Sound to allow access of cape-size vessels to the Port. Dredged material will be disposed offshore at a location in King George Sound. A portion of the dredged material will be used for reclamation of up to 9 hectares of Princess Royal Harbour to construct a new berth (Berth 7). Read more...