This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 20, 2017
Cottesloe Pier Pty Ltd proposes to construct a pier extending off the end of the current Cottesloe groyne. The project design consists of a jetty and boardwalk structure including an underwater observatory, cafe, swimming area and fishing jetty. Read more...Last updated: October 31, 2017
Development of an integrated water supply and wastewater treatment system on Rottnest Island Read more...Last updated: June 6, 2017
The proposal is to construct and operate a freeway-standard dual carriageway between the Reid Highway/Tonkin Highway junction and the Great Northern Highway at Muchea. Read more...Last updated: April 10, 2017
Condition 3-1 of Ministerial Statement 906 requires the proponent to substantially commence the proposal within five years of the date of issue of the Statement (that is, before 1 August 2017). The proposal has not yet substantially commenced. The proponent for the proposal, Point Grey Development Company Pty Ltd, has requested an extension of the Time Limit of Authorisation (now referred to as “Time Limit for Proposal Implementation”) for substantial commencement to be extended to be... Read more...Last updated: February 6, 2017
The Water Corporation proposes the construction and operation of the Balannup Pressure Main, a 4.5 km wastewater pressure main from the Collared Street Pump Station to the Waterworks Road Pump Station in Armadale. Read more...Last updated: January 23, 2017
This proposal is to amend conditions of Ministerial Statement 433 relating to dust where these emissions are appropriately regulated through part V of the EP Act. Read more...Last updated: December 13, 2016
The proposal involves the setting of up to 72 baited drum lines off metropolitan and south west coastal regions of Western Australia for a period of three years, beginning on 15 November 2014 and ending on 30 April 2017, after which the program will be subject to review. Drum lines will be set at approximately 1km offshore of popular beaches and surfing spots within two Marine Monitored Areas (MMAs) – the Metropolitan MMA (Ocean Reef to Port Beach) and the South West MMA (Quindalup to Prevelly... Read more...Last updated: December 8, 2016
The proposal has been referred by Main Roads Western Australia for the assessment of Neerabup Road East and Neerabup Road West only (within the Mitchell Freeway Extension). Stage 1 (Neerabup Road East/West) project includes grade separated interchanges (including road bridges) at Neerabup Road, underpasses at Neerabup Road, and Neerabup Road upgrade from Connolly Drive to Wanneroo Road connection to freeway. Read more...Last updated: December 7, 2016
The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...Last updated: December 2, 2016
The proposal is to construct, operate and maintain a 1.5 km section of Keane road between Anstey and Skeet roads, Forrestdale. The proposal is located within Bush Forever Site 342 (approximately 369 hectares (ha)), which meets all six of the EPA’s criteria for the identification of regionally significant natural areas, contains one of the largest remaining areas of damplands of high conservation value on the Swan Coastal Plain, and is the largest consolidated area of Southern River vegetation... Read more...Last updated: September 12, 2016
The Commissioner for Main Roads Western Australia proposes to construct and maintain the Ellenbrook Bus Rapid Transit to provide a dedicated busway from the Ellenbrook town centre to Reid Highway. It involves the construction of: approximately 10 kilometres of dedicated busway; grade separations of the busway at road crossings; upgrades of all existing intersections; three bus stations with Park and Ride facilities; realignment of Lord Street from Reid Highway to Youle-Dean Road and from Park... Read more...Last updated: September 1, 2016
The Public Transport Authority of Western Australia proposes the Forrestfield-Airport Link, a 9km extension of the Perth rail network from Bayswater to Forrestfield. Read more...Last updated: January 22, 2015
The proposals are to develop a water supply source using a bore located in the Chittering Road reserve in Lower Chittering and distributing to various properties. The proposals would involve the combined abstraction of up to 390 megalitres per annum. One of the proposals involves the construction of a 1.2 kilometre pipeline running east of the bore within the northern section of the road reserve of Chittering Road., Note: Two separate proposals have been referred for assessment however,... Read more...Last updated: November 25, 2013
On 21 September 2011, Western Power, through the Minster for Energy, applied to the Minister for Environment for an approval under noise regulation 17 in relation to Western Power’s existing and future electrical distribution transformers. The basis of the application was that the noise emissions from a large number of distribution transformers operated by Western Power do not comply with the assigned noise levels specified by the noise regulations, due to their proximity to noise sensitive... Read more...Last updated: November 18, 2013
The Public Transport Authority of Western Australia proposes to develop a pedestrian bridge over the Swan River linking the East Perth foreshore to the Burswood Peninsula and the construction of a bus hub at East Perth. The proposal forms the third component (Part 3) of the new Perth Stadium Project, Part 1 being the construction of the Stadium and associated Sports Precinct, and Part 2 being the construction of the Transport Corridor Infrastructure including rail works and upgrades to the... Read more...Last updated: September 2, 2013
Water Corporation is proposing to implement a 14 gigalitre per annum groundwater replenishment scheme (GWRS) of recycled wastewater to the Leederville and Yarragadee aquifers, located on the Swan Coastal Plain. Read more...Last updated: January 11, 2013
The referral received by the EPA is for the construction and operation of the stadium. The EPA considers that the main environmental issues are associated with the pre-construction site works, which will stabilise and prepare parts of the site before the main construction phase. The site was previously used as a landfill facility and has been classified as "possibly contaminated - investigation required" under the Contaminated Sites Act 2003. Preconstruction site works will... Read more...Last updated: December 24, 2012
The Environmental Protection Authority (EPA) has received a referral from the Rottnest Island Authority (RIA) to revitalise the island’s 22 hectare public golf course, west of the Thomson Bay settlement. Read more...Last updated: March 26, 2012
The Environmental Protection Authority has completed its assessment of the application to amend the Environmental Protection (Western Power Transmission Substation Noise Emissions) Approval 2005 made by Western Power to the Minister for Environment on 21 September 2011. The application was referred to the EPA for assessment under regulation 17(9) of the Environmental Protection (Noise) Regulations 1997. Read more...