This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 2, 2024
Main Roads is proposing to upgrade and widen Anketell Road to an Expressway Standard for approximately 7.5 km between Leath Road and Kwinana Freeway in the City of Kwinana, WA. The Proposal will include grade separated interchanges at six locations, grade separation of road over rail at two locations and other supporting road infrastructure . Read more...Last updated: April 2, 2024
The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...Last updated: March 25, 2024
The Northern Terminal (NT) to Neerabup Terminal (NBT) 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between NT in Malaga and NBT in Pinjar, a length of approximately 29 km. The purpose of the proposal is to reinforce the North Region transmission network to remove constraints on existing connected generation and provide... Read more...Last updated: December 22, 2023
The Mulga Downs Hub and Rail Spur (the Proposal) is located approximately 210 km south of Port Hedland and 180 km northwest of Newman in the Pilbara region of Western Australia. The Proposal is for the development of a hub and rail spur to connect into the existing Roy Hill Railway for the transport of iron ore to Port Hedland. The Proposal includes truck unloading and train loading facilities, product rehandling facilities, stockyards, a laboratory, a rail loop and rail service tracks, lateral... Read more...Last updated: May 29, 2023
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: April 13, 2022
Main Roads proposes to upgrade and widen a 2 km section of Tonkin Highway from four lanes to six lanes from approximately 1 km north of Kelvin Road extending south to Maddington Road. The Proposal will include construction of a grade separated interchange at Tonkin Highway and Kelvin Road and associated works such as PSP upgrade, installation of noise and retaining walls, drainage improvements and landscaping. Read more...Last updated: May 18, 2020
Change to condition 3 - Time limit for Proposal Implementation. Extension of time limit of 5 years to 15 June 2025, allowing time for project financing. Read more...Last updated: March 5, 2019
Pilbara Energy Company Pty Ltd (a wholly owned subsidiary of Fortescue Metals Group Limited (FMG)) is seeking to develop the Pilbara Transmission Project (the proposal), a high voltage power transmission network in the Pilbara region of Western Australia. The proposal is comprised of approximately 375 kilometres of 220 kilo-volt overhead transmission lines with terminal and substation infrastructure. The proposal is to be located within a 4780 hectare (ha) development envelope. The proposal... Read more...Last updated: March 5, 2019
DBNGP (WA) Nominees Pty Limited propose to construct 670m of underground natural gas pipeline between the Albemarle Kemerton Plant (a lithium hydroxide manufacturing plant) and the existing Dampier to Bunbury Natural Gas Pipeline. The proposal is located in Kemerton, approximately 17km north-east of Bunbury and will provide natural gas to the Albemarle Kemerton Plant (Ministerial Statement No. 1085) . The proposed pipeline will be constructed within a 30m wide corridor requiring clearing of 2.... Read more...Last updated: May 14, 2018
Section 46 extension to the Time Limit for Authorisation for substantial commencement. Read more...Last updated: August 14, 2017
This is the inquiry into a request for changes to Ministerial Statement 709 , relating to the Expansion of the Monkey Mia Dolphin Resort . Read more...Last updated: April 10, 2017
Condition 3-1 of Ministerial Statement 906 requires the proponent to substantially commence the proposal within five years of the date of issue of the Statement (that is, before 1 August 2017). The proposal has not yet substantially commenced. The proponent for the proposal, Point Grey Development Company Pty Ltd, has requested an extension of the Time Limit of Authorisation (now referred to as “Time Limit for Proposal Implementation”) for substantial commencement to be extended to be... Read more...Last updated: December 8, 2016
The proposal has been referred by Main Roads Western Australia for the assessment of Neerabup Road East and Neerabup Road West only (within the Mitchell Freeway Extension). Stage 1 (Neerabup Road East/West) project includes grade separated interchanges (including road bridges) at Neerabup Road, underpasses at Neerabup Road, and Neerabup Road upgrade from Connolly Drive to Wanneroo Road connection to freeway. Read more...Last updated: December 8, 2016
In September 2011 Chevron Australia Propriety Limited (CAPL) and the Department of State Development (DSD) executed an agreement (Ashburton North State Development Agreement (Wheatstone Project) (SDA)) that required CAPL, to develop and execute a project that increased potable water supply to Onslow by 2 ML/day. This project is referred to as the Onslow Water Infrastructure Upgrade Project. After completion of the works the assets will be handed-over to the Water Corporation for ongoing... Read more...Last updated: September 12, 2016
The Commissioner for Main Roads Western Australia proposes to construct and maintain the Ellenbrook Bus Rapid Transit to provide a dedicated busway from the Ellenbrook town centre to Reid Highway. It involves the construction of: approximately 10 kilometres of dedicated busway; grade separations of the busway at road crossings; upgrades of all existing intersections; three bus stations with Park and Ride facilities; realignment of Lord Street from Reid Highway to Youle-Dean Road and from Park... Read more...Last updated: February 25, 2013
Main Roads Western Australia proposes to construct the Bunbury Outer Ring Road Southern Section (South Western Highway to Bussell Highway) at Bunbury. The project will provide improved access from Bussell Highway in the south, to the Bunbury Port and developing industrial area to the east of Bunbury. Read more...