Last updated: July 25, 2022
The Proposal is located in the Pilbara region of Western Australia within a development envelope of 20,821 ha and clearing no more than 1,564 ha. Onslow Iron Pty Ltd (herein MRL a wholly owned subsidiary of Mineral Resources Limited) is proposing to develop: • A fully sealed private haul road, approximately 125km in length • Gas pipeline and ancillary haul road infrastructure. • Storage and bulk handling of ore at the Port of Ashburton. • Dredging a dedicated berthing pocket adjacent to the... Read more...Last updated: July 21, 2022
Change to condition 3 – Time Limit for Proposal Implementation. Extension of time limit of five years to 18 November 2025. Read more...Last updated: July 7, 2022
The proposal is to construct and operate a new 48 km section of the Great Northern Highway within the Shire of Chittering. The proposal would bypass the town of Bindoon located approximately 70 km north east of Perth, Western Australia. The Proposal would consist of a combination of four lane dual carriageway, four lane single carriageway and two lane single carriageway and would divert from the existing GNH at the Chittering Roadhouse running west of Bindoon and re-joining the GNH between Hay... Read more...Last updated: July 1, 2022
The proposal is to construct and operate an iron ore export facility at Balla Balla midway between Port Hedland and Karratha, northwest of Whim Creek in the Pilbara region of WA. Read more...Last updated: June 22, 2022
Main Roads Western Australia is proposing to construct and operate the southern section of the Bunbury Outer Ring Road (BORR). The proposal includes 10.5 km of freeway-standard dual carriageway, 3 km of rural distributor roads and other associated road-infrastructure. The BORR southern section will connect to the proposed northern and central sections of BORR near South West Highway, which together will complete a bypass around Bunbury City from Forest Highway to Bussell Highway. The BORR... Read more...Last updated: June 10, 2022
Z1Z Resorts Pty Ltd proposes to redevelop the Ningaloo Lighthouse Holiday Park, located along Yardie Creek Road, North West Cape. The Proposal comprises the construction of new visitor accommodation; the construction of associated ancillary facilities (i.e., staff accommodation, power supply infrastructure, water supply and treatment, wastewater treatment and reuse, and replacement service station (vehicle refuelling) etc.); refurbishment of the Vlamingh Head Lighthouse Quarters (a part of... Read more...Last updated: May 12, 2022
The proposal is to construct and operate an extension to the Dampier Cargo Wharf at the Port of Dampier. The proposal incorporates the construction of a new (adjoining) southern section of wharf and associated mooring dolphin, dredged berth pocket and vessel manoeuvring area. The Proposal will enable larger vessels (up to Panamax class) to access the terminal and facilitate new trades and products being handled at the Port. Key construction elements of the Project include dredging, blasting,... Read more...Last updated: May 4, 2022
The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford and... Read more...Last updated: April 26, 2022
The South West Development Commission is proposing an upgrade to the marine structures that are intended to meet existing demand and future requirements for small craft maritime infrastructure and include new mooring facilities for commercial and recreational vessels, floating jetties, a boat servicing facility, improved public ablution facilities and up upgraded boat launching and storage facilities. Read more...Last updated: April 13, 2022
Main Roads proposes to upgrade and widen a 2 km section of Tonkin Highway from four lanes to six lanes from approximately 1 km north of Kelvin Road extending south to Maddington Road. The Proposal will include construction of a grade separated interchange at Tonkin Highway and Kelvin Road and associated works such as PSP upgrade, installation of noise and retaining walls, drainage improvements and landscaping. Read more...Last updated: April 11, 2022
Change existing Condition 7 of Ministerial Statement 586 so that it is adequate with respect to avoiding, reducing, and offsetting greenhouse gas emissions. Read more...Last updated: April 11, 2022
Changes to condition 13-1 and 13-3 of Ministerial Statement 1114 (as amended) following a change to proposal after assessment. Read more...Last updated: March 28, 2022
Remove Condition 2 (Proponent Commitments) if the proponent commitments in schedule 2 have been completed, are no longer relevant to the proposal or can be managed under Part V of the Environmental Protection Act 1986 (EP Act). Read more...Last updated: February 28, 2022
Change to conditions 1-1 (Implementation) and 2-1 (Proponent Commitments) Read more...Last updated: February 2, 2022
The requested changes relate to condition 3 of Statement 1041 (as relevant to Statement 826) for an extension to the Time Limit of Authorisation for Proposal Implementation. Read more...Last updated: January 25, 2022
Dredging of approximately 3,900,000 cubic metres of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point and Stanley Point; disposal of dredged material at dredged material management areas. Read more...Last updated: December 1, 2021
The Department of Transport is proposing to construct a safe and accessible boating facility at the existing boat ramp site at Entrance Point, Broome. The proposal is located within the existing Port of Broome port limits, approximately 350 metres south-west of the previously assessed Kimberley Marine Offloading Facility. The proposal includes construction of a boat ramp, two finger jetties, two groynes, an offshore breakwater and associated terrestrial public amenity infrastructure. Piling... Read more...Last updated: November 25, 2021
Changes to condition 5 (relating to performance review), condition 9 (relating to stack emissions), and condition 11 (relating to decommissioning), in order to contemporise the conditions of the Statement and streamline its regulatory obligations. Read more...Last updated: November 23, 2021
Changes to Schedule 1 and Condition 12 (Odour Management) of Ministerial Statement 755 in order to: • Amend a key proposal characteristic in Schedule 1 regarding venting of odours. • Review the suitability of Condition 12 in light of the proposed change to Schedule 1 and having regard to the Licence requirements under Part V of the EP Act. Read more...