This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 14, 2015
The proposal is to construct and operate an open cut iron ore mine and associated infrastructure for the extraction, processing and transport of iron ore. The proposal is located approximately 70 km north-west of Newman in the Pilbara region of Western Australia. Read more...Last updated: May 4, 2015
The proposal is for the dredging of 12 million cubic metres of sediments to widen and deepen the existing shipping channel into Princess Royal Harbour and to extend the shipping channel into King George Sound to allow access of cape-size vessels to the Port. Dredged material will be disposed offshore at a location in King George Sound. A portion of the dredged material will be used for reclamation of up to 9 hectares of Princess Royal Harbour to construct a new berth (Berth 7). Inquiry under... Read more...Last updated: February 20, 2015
The proposal is to develop the Jackson 4 (J4) deposit and construct and operate an iron ore mine and supporting infrastructure, access track and haul road in the Goldfields region of Western Australia, approximately 60 kilometres north-west of Koolyanobbing. Read more...Last updated: February 3, 2015
The proposal is to develop an open cut iron ore mining operation at Orebody 18 on Mineral Lease 244SA involving mining 116 Mt of ore at a rate of up to 15 Mtpa for a mine life of 12 to 15 years. Support infrastructure includes an 8 km rail spur and crushing, screening and load out facilities. Read more...Last updated: January 12, 2015
The proposal is to construct and operate two iron ore mines, haul roads and mine infrastructure in the Yilgarn area of Western Australia, 100 kilometres north of Southern Cross. Following the appeal period and the Ministers subsequent determination on the Appeals received, the Minister remitted this proposal back to the EPA for assessment at the level of Public Environmental Review (8 weeks). Access the re-assessment of this proposal here. Read more...Last updated: October 24, 2014
The construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Inquiry into amending the conditions of Ministerial Statement 816 (extension of term). Read more...Last updated: October 17, 2014
To undertake mining and processing of up to 129 million tonnes of magnetite iron ore in the Central and Western deposits at the Balla Balla mine site and to construct and operate a pipeline to convey the magnetite slurry to Utah Point, Port Hedland. Inquiry under s46 in regard to changing the implementation conditions of Ministerial Statement 794 . Read more...Last updated: October 15, 2014
Fortescue Metals Group Limited (Fortescue) proposes to develop two new mines within the Solomon Project, a greenfield site approximately 60 kilometres (km) north of Tom Price and adjacent to the North Eastern boundary of the Karijini National Park, and to construct a 127 km railway from the new mines eastwards to the existing Fortescue railway. Read more...Last updated: August 19, 2014
The proposal is to mine iron ore from the Stage 2 project area on the southern slopes of the Chichester Range and develop a remote borefield and pipeline. Inquiry under s46 in regard to changing the conditions of Ministerial Statement 829 . Read more...Last updated: August 19, 2014
The proposal is to mine iron ore from the Stage 2 project area on the southern slopes of the Chichester Range and develop a remote borefield and pipeline. Inquiry under s46 to change conditions of Ministerial Statement 824 . Read more...Last updated: June 12, 2014
The development of iron ore mines at Deposits ‘A’, ‘B’, and ‘E’, waste dumps, ore processing operation and associated infrastructure at West Angelas, 130 kilometres west of Newman, and rail infrastructure. Inquiry under s46 to amend the conditions of Ministerial Statement 514 . Read more...Last updated: June 4, 2014
The expansion of existing mining operations at Marandoo by mining below the water table, including expansion of the existing mine pit and development of new waste dumps. Read more...Last updated: June 4, 2014
To develop and operate an iron ore mine, supporting infrastructure and a haul road, 76 km north-east of Perenjori in the Midwest region. Read more...Last updated: March 18, 2014
The Cloudbreak iron ore mine project includes open pit strip mining, development of new pits and permanent waste landforms, backfilling of pits, progressive rehabilitation and ore processing, development of infrastructure, de-watering and water disposal activities. Inquiry under s46 relating to Ministerial Statement 899 and EPA Report 1429 . Read more...Last updated: March 12, 2014
The proposal is to construct and operate an iron ore mine and associated infrastructure at Weld Range. Open pit mining would occur above and below the water table and would involve dewatering. Excess water would be discharged to a lined evaporation pond. Read more...Last updated: January 16, 2014
The proposal is for the development of an iron ore mine at deposits 'A' and 'B' and ore processing operation at West Angelas 130 kilometres west of Newman, and construction of a rail line and expansion of port facilities at Cape Lambert. Read more...Last updated: December 31, 2013
The proposal is to expand the FerrAus Pilbara Project to include below the water table mining at the Robertson Range Area and to develop additional mine pits at the Davidson Creek Area, located in the East Pilbara region of Western Australia. Read more...Last updated: December 12, 2013
The proposal is to construct and operate an iron ore mine in the Goldfields region of Western Australia. The proposal involves mining of hematite direct shipping ore (DSO) from two open pits on the Yendilberin Hills, which form part of the Finnerty Range. Inquiry into the matter of amending condition 5-2 of Ministerial Statement 852 to remove the clearing requirement for the S2 and W22 vegetation communities. Read more...Last updated: December 10, 2013
The proposal involves the development of a satellite iron ore mine at Section 10, 20km northwest of the Tom Price minesite, to supplement falling production from the Tom Price mine as it nears the end of its life. The orebody occupies the lower slopes of the main range of hills in the Western Turner Syncline. The eastern and western portions of the proposed pit, where the ore is shallowest, would be mined first and subsequently backfilled, but the central portion would remain open. Read more...Last updated: November 20, 2013
The proposal is to construct and operate an open cut iron ore mine and haul road at the Windarling Range W4 East Deposit, located approximately 130 kilometres north of Southern Cross. Read more...