This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 5, 2016
The proponent, Mount Gibson Mining Limited, proposes to mine hematite ore from the Iron Hill and Iron Hill South Deposits. The Iron Hill Deposits are part of the Mt Gibson Range, which is located approximately 270 kilometres (km) east-south-east of Geraldton. The proposal is located within a 112 hectare (ha) development envelope. The proposal is for the development of two mine pits (20 ha), a waste rock landform (30 ha) and support infrastructure (37 ha), which includes topsoil stockpiles and... Read more...Last updated: November 21, 2016
Sinosteel Midwest Corporation proposes an expansion of its existing operations at the Blue Hills Iron Ore Mine, involving the construction and operation of two new mine pits and waste rock dumps. A new processing plant and additional road infrastructure will also be established. Read more...Last updated: November 8, 2016
The proposal is an expansion of an existing approved proposal: Yandicoogina Iron Ore Project ( Ministerial Statement 914 ) to develop iron ore deposits at Junction Central, Junction South East, Junction South West and Oxbow, located in the central Pilbara region of Western Australia, on mining lease 274SA. The proposal is located within the Pilbara Interim Biogeographic Regionalisation for Australia (IBRA) region and is located within the Fortescue and Hamersley IBRA subregions. Read more...Last updated: October 4, 2016
Life-of-mine proposal to mine iron ore within Mining Leases 270SA and 47/292 at a rate of approximately 45 million tonnes per annum, and subsequent rehabilitation and decommissioning of the site. Inquiry under s46 to amend Ministerial Statement 679, the subject of EPA Report 1166 . Read more...Last updated: September 20, 2016
The proposal is to construct and operate an iron ore mine in the Goldfields region of Western Australia. The proposal involves mining of hematite direct shipping ore (DSO) from a single open pit on the Yendilberin Hills, which form part of the Finnerty Range. Read more...Last updated: August 31, 2016
Austeel Pty Ltd proposes to mine iron ore from the George Palmer Orebody on a pastoral lease about 25km south of Cape Preston. Ore will be fed to a purpose-built process plant to produce up to 13.8 million tonnes per annum of pellet iron and 4.7 million tonnes per annum of direct reduced iron (DRI) and/or hot briquetted iron (HBI). The products will be exported via a new port to be built at Cape Preston and Preston Island. Associated components comprise waste dumps, tailings storage facility,... Read more...Last updated: June 1, 2016
The proposal involves an extension to the Wheelarra Hill open pits and overburden storage areas, and the mining of the South Jimblebar and Hashimoto deposits, with disposal of overburden into adjacent Overburden Storage Areas (OSAs) and in-pit disposal. Inquiry under s46 related to Ministerial Statement 857, the subject of EPA Report 1371. Read more...Last updated: May 4, 2016
Life-of-mine proposal to mine iron ore within Mining Leases 270SA and 47/292 at a rate of approximately 45 million tonnes per annum, and subsequent rehabilitation and decommissioning of the site. Read more...Last updated: May 2, 2016
The proposal is to develop an iron ore mine on the Iron Valley tenement located in the Shire of East Pilbara approximately 90 kilometres north-west of Newman. The project would include an above watertable blast and hydraulic shovel open pit mine and supporting infrastructure including dry crushing and screening plant, run of mine pad, waste rock landform, internal roads, power production, hazardous materials storage, waste management facilities, office buildings and an accommodation camp. Read more...Last updated: March 3, 2016
The proposal includes the existing Hamersley Yandicoogina iron ore project and proposed expansion. The existing project includes open pit mining at the Junction Central and Junction South East operations and associated infrastructure, dewatering activities, closure and rehabilitation. The expansion includes the development of new pits at Junction South West and Oxbow, temporary waste landforms, the development of new infrastructure, additional dewatering and water disposal activities. The... Read more...Last updated: February 4, 2016
The West Pilbara Iron Ore Project Stage 1 – Mine and Rail proposal is to develop and operate eight iron ore deposits 35 to 85 km south of Pannawonica and a heavy-haulage railway that connects the mine area to the Anketell Point Port precinct. The EPA's assessment report (Report 1409) was released on 3 August 2011. The Minister for Environment approved the proposal for implementation, subject to the implementation conditions of Ministerial Statement 881 (30 November 2011). In August 2015,... Read more...Last updated: December 24, 2015
The proposal is to develop and operate the Baby Hope iron ore deposit, located 75 km north-west of Newman in the Pilbara region of WA. The Baby Hope proposal includes above water table open pits, waste rock dumps and supporting transport infrastructure. Clearing of up to 1,000 ha within the existing Hope Downs 1 development envelope would be required for the proposal. Product from the Baby Hope deposit would be processed at the at the existing Hope Downs processing facilities. Read more...Last updated: November 12, 2015
The proposal is to construct and operate an open-cut iron ore mine, and associated infrastructure, approximately 40 kilometres (km) east of Newman. Read more...Last updated: November 11, 2015
The proposal is to extend the mining of the existing approved above watertable Orebody 29, 30, and 35 mines located approximately 7 km west-south-west of Newman, in the Shire of East Pilbara, to below the watertable and discharge any excess dewatering from these three orebodies into Ophthalmia Dam. Read more...Last updated: October 28, 2015
Hamersley Iron Pty Limited proposes to revise the Marandoo project located approximately 37 kilometres east of Tom Price. The proposal involves additional clearing of 400 hectares and the amalgamation of the three existing Ministerial Statements 286, 598 and 833. Read more...Last updated: October 22, 2015
The proposal is to extend the existing Wheelarra Hill open pits, develop the South Jimblebar and Hashimoto deposits, and to increase the ore processing capacity by 30 million tonnes per annum (mtpa) to 75 mtpa. Open pit mining will occur above and below ground and will involve dewatering. Excess water will be discharged into the Ophthalmia Dam. Read more...Last updated: October 15, 2015
BHP Billiton Iron Ore is proposing to develop and operate the Orebody 32 deposit, located approximately 10 kilometres north-east of the Newman Township in the Shire of East Pilbara. The Proposal is known as the Orebody 32 East Above Water Table Mine Project. Read more...Last updated: August 21, 2015
Robe River Mining Co. Pty Ltd proposes to revise the West Angelas Iron Ore Mine to include mining above and below the water table of Deposit A west and Deposit F, as satellite deposits to the existing operation. The project is located 130 kilometres northwest of Newman in the Pilbara. The proposal includes additional clearing up to 3,223 hectares (ha), an extension of the development envelope of up to 2,750 ha and an increase in abstraction of groundwater of up to 1 gigalitre per annum. Read more...Last updated: August 7, 2015
The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...Last updated: August 4, 2015
The proposal is for an exploration drilling program which involves disturbance and clearing for access tracks and drill pads, and fencing, on banded iron formation ranges of the Perenjori Hills. Read more...