Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Industrial (3) Apply Industrial filter
  • Infrastructure (2) Apply Infrastructure filter
  • Diamonds (1) Apply Diamonds filter
  • Gold (1) Apply Gold filter
  • Land use (1) Apply Land use filter
  • Lead (1) Apply Lead filter
  • Mineral sands (1) Apply Mineral sands filter
  • Rare earth elements (1) Apply Rare earth elements filter

Filter by current status:

  • (-) Remove EPA Report and Recommendations released - not appealable filter EPA Report and Recommendations released - not appealable

Filter by preliminary environmental factors:

  • Flora and Vegetation (5) Apply Flora and Vegetation filter
  • Terrestrial Fauna (4) Apply Terrestrial Fauna filter
  • Air Quality (3) Apply Air Quality filter
  • Human Health (2) Apply Human Health filter
  • Inland Waters Environmental Quality (2) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (1) Apply Hydrological Processes filter
  • Inland Waters (1) Apply Inland Waters filter
  • Landforms (1) Apply Landforms filter
  • Social Surroundings (1) Apply Social Surroundings filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter

Filter by Proponent:

  • Albemarle Lithium Pty Ltd (1) Apply Albemarle Lithium Pty Ltd filter
  • Covalent Lithium Pty Ltd (1) Apply Covalent Lithium Pty Ltd filter
  • Esperance Port Authority (1) Apply Esperance Port Authority filter
  • Freeport Bow River Properties Limited (1) Apply Freeport Bow River Properties Limited filter
  • Kalgoorlie Consolidated Gold Mines Pty Ltd (1) Apply Kalgoorlie Consolidated Gold Mines Pty Ltd filter
  • Rosslyn Hill Mining Pty Ltd (1) Apply Rosslyn Hill Mining Pty Ltd filter
  • Tronox Management Pty Ltd (1) Apply Tronox Management Pty Ltd filter
  • Wespine Industries Pty Ltd (1) Apply Wespine Industries Pty Ltd filter
  • Western Australia Police Service (1) Apply Western Australia Police Service filter
  • Western Australian Sports Centre Trust (1) Apply Western Australian Sports Centre Trust filter
  • Yara Pilbara Nitrates Pty Ltd (1) Apply Yara Pilbara Nitrates Pty Ltd filter

Filter by region:

  • South West (3) Apply South West filter
  • Goldfields Esperance (2) Apply Goldfields Esperance filter
  • Mid West (2) Apply Mid West filter
  • Perth (2) Apply Perth filter
  • Kimberley (1) Apply Kimberley filter
  • Pilbara (1) Apply Pilbara filter

Filter by last updated:

  • 2021 (2) Apply 2021 filter
  • 2019 (2) Apply 2019 filter
  • 2017 (1) Apply 2017 filter
  • 2016 (1) Apply 2016 filter
  • 2015 (1) Apply 2015 filter
  • 2009 (1) Apply 2009 filter
  • 2002 (2) Apply 2002 filter
  • 1987 (1) Apply 1987 filter
  1. Home
  2. Proposal search
  3. EPA Report and Recommendations released - not appealable

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Albemarle Kemerton Plant (s46) [2230]

Last updated: October 28, 2021

Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...

Earl Grey Lithium Project (S46) [2263]

Last updated: February 1, 2021

Change relates to requirements of condition 7 -1(1) and 7-1(3), and includes an update of Figure 4 and change to Schedule 2 to amend the spatial dataset to reflect the removal of Malleefowl Mound Exclusion Zone for MM23 referred to in condition 7-1(1) Amend conditions 8-1(4) and 8-8(2) to replace the reference to 6,957 individuals of Microcorys sp. Mt Holland (D.Angus DA2397) to 15.93 per cent of the regional population. This proposal was assessed in conjunction with assessment 2279. EPA Report... Read more...

Dongara Titanium Minerals Project (s46) [2217]

Last updated: November 18, 2019

Changes to Condition 3 of Ministerial Statement 953 in order to extend the Time Limit for Authorisation for substantial commencement of the proposal. Read more...

Technical Ammonium Nitrate Production Facility, Burrup Peninsula, Shire of Roebourne, Ministerial Statement 870 (s. 46) [2166]

Last updated: September 18, 2019

Inquire into and report on the matter of changing implementation condition 5-1: Air Quality in Ministerial Statement 870 for the above proposal to protect rock art. Read more...

Champion Lakes Masterplan Development Lake Road Armadale (s46)

Last updated: April 3, 2017

The proponent for the proposal, Western Australian Sports Centre Trust (trading as Venues West), has requested changes to the implementation conditions 6-1 and 6- of Ministerial Statement 632 relating to Water Quality. This is the EPA's inquiry into the requested amendments. Read more...

Gidji Gold Processing Plant, near Kalgoorlie (s46)

Last updated: June 30, 2016

The proposal is for the operation of a gold concentrate processing plant and associated infrastructure at Gidji approximately 17 km north of the City of Kalgoorlie-Boulder. Inquiry under s46 in regard to changing the implementation conditions of Ministerial Statement 28 and Ministerial Statement 77 . Read more...

Magellan Lead Carbonate Project - Inquiry under s. 46 to amend Ministerial Statement 905

Last updated: February 26, 2015

The Minister for Environment has requested that the EPA inquire into and report on the matter of changing the implementation conditions relating to Ministerial Statement 905 in order to: extend the time limit on shipments of lead carbonate through Fremantle Port (condition 3A); and reduce the amount of the financial assurance required and allow the release and reinstatement of the financial assurance in the event operations are suspended (condition 18). Read more...

Port of Esperance Noise Regulation 17 Variation

Last updated: April 28, 2009

Read more...

Pine Sawmill, Dardanup - Noise Regulation 17 Variation to assigned noise levels

Last updated: August 26, 2002

Read more...

WA Police Academy, Joondalup - Noise regulation 17 application

Last updated: January 14, 2002

The Western Australia Police Service has applied to the Minister for the Environment under regulation 17 of the Environmental Protection (Noise) Regulations 1997 to allow the emission of noise from the WA Police Academy, Joondalup to exceed the prescribed standard for noise emissions as specified in noise regulation 7. Read more...

Bow River alluvial diamond project

Last updated: October 2, 1987

The proposal is to mine alluvial diamonds in the Bow River area of Western Australia. The proposal involves the establishment of a plant to process riverine gravel. The fine waste material will be disposed of in a tailing dam and the coarse waste material dumped near the processing plant. The diamondiferous material will be concentrated in a Heavy Medium Separater and then sorted using an x-ray diamond sorter. The plant will process 4,000 tonnes per day. The orebody covers approximately 500 ha... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
+618 6364 7000
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2022 Government of Western Australia. All rights reserved.