This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 22, 2019
Changes to conditions 3-1 and 3-2 of Ministerial Statement 911 in order to extend the time limit of proposal implementation. Read more...Last updated: November 21, 2019
The Proposal is to construct and operate the Pluto to Northwest Shelf Interconnector, a 3.3 km long, steel buried natural gas pipeline, connecting the Pluto Interconnector Compressor Station to the Karratha Gas Plant which is operated by Woodside on behalf of the North West Shelf Project participants, located on the Burrup Peninsula in the North of Western Australia. The proposal will require the clearing of an estimated 10.69 ha.3.26 ha within the Karratha Gas Plant Lease and Buffer Zone Lease... Read more...Last updated: November 20, 2019
Remove reference to Claypans of the Swan Coastal Plain and remove requirement to vest land with the Conservation and Parks Commission. Read more...Last updated: November 8, 2019
Australian Gold Reagents Pty Ltd (AGR) proposes to expand the capacity of its solid sodium cyanide manufacturing plant from 25 000 tonnes per annum (tpa) to 45 000 tpa Read more...Last updated: October 1, 2019
The proposal is for the works and operation of a wastewater treatment plant (WWTP) and woodlot reuse scheme for the first three years. This will enable monitoring and evaluation to be undertaken to determine a longer term strategy for development and operation of the scheme. The proposed works and operation for the first three years form part of planned Stage 1 of the scheme, which will extend to the year 2010. A further two stages (extending to 2040) are planned for the future. Read more...Last updated: September 16, 2019
The proposal is to develop the Griffin oilfield which is located 68km offshore from Onslow. The oilfield will be developed using a floating production, storage and offloading facility and both oil and gas will be produced. The gas will be recovered and transported to the mainland via a submarine and onshore pipeline to a gas treatment plant and then on to the Dampier-Perth gas pipeline. This assessment comprises the portion of the offshore pipeline in State waters, bringing gas onshore to the... Read more...Last updated: August 21, 2019
Robe River Mining Co Pty Ltd is seeking to extend the existing Mesa A / Warramboo Iron Ore Mining Project by extending the existing mining operation and developing four new nearby deposits. The proposal is 43 kilometres west of Pannawonica in the Pilbara Region. The proposal would require an additional 3000 hectares of clearing of native vegetation, with some below water table mining. A water supply would also be required and discharge of any excess water to Warramboo Creek. Read more...Last updated: August 20, 2019
Re-opening of an iron ore mine; construction of associated infrastructure and a port facility on Koolan Island; and subsequent rehabilitation and decommissioning of the site. Read more...Last updated: August 14, 2019
Fortescue Metals Group Limited proposes to build a 120 km railway linking their existing Solomon Mine with their proposed Eliwana Iron Ore Mine, located 90 km west-northwest of Tom Price (Shire of Ashburton). The eastern section of the proposed Eliwana Railway Project development envelope is adjacent to Karijini National Park. Proposed Infrastructure within the Rail Development Envelope includes: Railway and associated embankment; Rail loop; Crossing/passing loops; Railway overpass; Train... Read more...Last updated: July 29, 2019
The proposal is to develop and operate a mineral sands mine approximately 25 kilometres south-east of the township of Dongara in the Midwest Region of Western Australia. Read more...Last updated: July 11, 2019
BHP Billiton Iron Ore has prepared a Strategic Proposal of its future operations in the Pilbara for the next 50 to 100 years. The Strategic Proposal will facilitate a more holistic and longer term view of mining activities in the Pilbara region by identifying and assessing how impacts to the environment at a landscape scale will be managed. Read more...Last updated: July 8, 2019
The proposal is to revise the existing Pilbara Iron Ore and Infrastructure Project: East-West Railway and Mine Sites Stage B located approximately 70 to 100 km north of Newman in the Pilbara region of Western Australia. The proposal includes mines and associated infrastructure at Christmas Creek and Mindy Mindy, and an east-west railway to link the Stage A north-south railway (to Port Hedland) to the Christmas Creek Mine. The revision includes modification/expansion or development of additional... Read more...Last updated: July 1, 2019
The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...Last updated: June 7, 2019
Kalium Lakes Potash Pty Ltd is seeking to develop a sub-surface brine deposit to produce approximately 150 kilotonne per annum of Sulphate of Potash product and by-products. The process will involve evaporation and processing operations at the Beyondie, 10-Mile and Sunshine Lakes area. The Project is located approximately 160 kilometres south east of Newman, and 75 km east of the Kumarina Roadhouse, in the eastern Pilbara region of Western Australia. The proposal includes the development of... Read more...Last updated: June 6, 2019
The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...Last updated: May 27, 2019
Condition 3. Extension to Time Limit for Proposal Implementation Read more...