This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: February 1, 2021
Australian Potash Limited proposes to abstract brine resources to produce a sulfate of potash (SOP) product at the Lake Wells Potash Project. The proposal area is located on and adjacent to the Lake Wells Playa Lake system (salt lake terrain), approximately 160km north-northeast of Laverton in Western Australia. The proposal would include construction of an SOP processing plant, brine abstraction bores, evaporation ponds, raw water bore field, accommodation village and other associated... Read more...Last updated: January 22, 2021
Tronox Management Pty Limited proposes to develop the Cooljarloo West Titanium Minerals Project, 30 kilometres west from Cervantes, Shire of Dandaragan. The proposal involves the dredge mining of three orebodies: Woolka, Harrier and Kestrel. The proposal will require movement of the mining dredge and ore processing plant (concentrator) from the existing Cooljarloo Mine to Cooljarloo West and back again via flotation across an open channel. Read more...Last updated: January 22, 2021
Changes to condition 11 Offsets following a change to proposal after assessment Read more...Last updated: January 22, 2021
Changes to condition 13 Offsets following a change to proposal after assessment. Read more...Last updated: January 7, 2021
Alcoa of Australia have requested changes to conditions 8, 9, 10, 11 and 12 of Ministerial Statement 728 and 1069 in order to facilitate an increase in production to 3.3 million tonnes per annum (Mtpa). Read more...Last updated: January 4, 2021
Hamersley Iron Pty Limited propose to develop above and below water table iron ore deposits and associated infrastructure at Western Turner Syncline. The proposal also includes an infrastructure corridor connecting the mining operation to the existing Tom Price mine ore-processing facilities. Surplus water from mining below water table would be managed by use on site and controlled discharge to the environment. Clearing of up to 750 ha would be required. The proposal is located 20 km west of... Read more...Last updated: November 23, 2020
Atlas Iron Pty. Ltd (the proponent) propose to develop the Miralga Creek DSO Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 8 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of four to five years. Associated infrastructure will include waste rock dumps. Existing borefield and accommodation... Read more...Last updated: October 5, 2020
Flinders Mines Ltd proposes to revise the already approved Pilbara Iron Ore Project located approximately 70 kilometres north-west of Tom Price in the Hamersley sub-region. The revised proposal includes additional clearing up to 300 hectares (ha) to include the Paragon ore deposit and external infrastructure (including haul roads, airstrip and accommodation camp), as well as an increase in abstraction of groundwater of up to 2 Gigalitre per annum. Read more...Last updated: October 2, 2020
The proposal involves the development and operation of the Hope Downs 4 Iron Ore Mine (HD4), located in the Pilbara region in the shire of East Pilbara. It includes the development and operation of an above and below the water table greenfields iron ore mine and associated infrastructure. Ore from the HD4 proposal would be transported via a new railway to existing rail infrastructure near the existing Hope Downs 1 Iron Ore Mine then to port facilities on the coast. The mine would operate... Read more...Last updated: September 30, 2020
The proposal is for the continuation of mining operations at the Fimiston site, and expansion and deepening of the Superpit to 600 metres via the Golden Pike Cutback. Additional waste dumps will be created to the north of the pit to contain 140 million tonnes of waste rock. The Fimiston I and II tailings storage facilities and/or the Kaltails tailings storage facility will be expanded to contain the additional tailings. This is a reassessment, pursuant to the Minister's decision to remit... Read more...Last updated: September 30, 2020
The proposal is to mine iron ore from the Stage 1 project area on the southern slopes of the Chichester Range and develop associated mining infrastructure. Read more...Last updated: September 30, 2020
Proposal to mine iron ore from the Stage 2 project area on the southern slopes of the Chichester Range and develop a remote borefield and pipeline by Roy Hill Iron Ore Pty Ltd (RHIO). Read more...Last updated: September 24, 2020
Change to implementation conditions relating to financial assurance requirements. Read more...Last updated: September 16, 2020
Ashton Rare Earths Pty Ltd wishes to extend the time limit of environmental approval for the proposed Rare Earths Mining and Beneficiation at Mt Weld and Secondary Processing at Meenaar project for a further three years. Read more...Last updated: September 16, 2020
BHP Billiton Nickel West (BHPB) proposes to develop the Mt Keith Satellite Project (the proposal), to the existing Mount Keith Mining Operations. The proposal is located approximately 80 km north of Leinster in the Shire of Leonora. The proposal includes clearing of up to 842 hectares of native vegetation (which is also fauna habitat) for two open pits, a Waste Rock Landform and a transport corridor, with minor ancillary infrastructure to support the mining process. Read more...Last updated: September 16, 2020
This proposal involves the recommencement and expansion of mining at the Telfer Gold Mine to include the mining and processing of 400 million tonnes of gold ore at a rate of up to 23 million tonnes per annum, and the transport of copper concentrate to Port Hedland by road. Key components of the expansion include: expansion of existing underground mining areas and deepening of the existing open pits; extensions to the existing southern waste rock dump and several other dumps; construction of a... Read more...Last updated: September 10, 2020
The Tims Thicket Waste Management Facility is located approximately 15 km south of Mandurah. The Site covers an area of 28 hectares. The Site has been in operation since 1995. The proposal seeks to recommence acceptance of liquid waste at the facility by implementing a suite of improvements, including refurbishing and repurposing the existing infrastructure. The proposed design capacity is up to 6500 kL of liquid waste per year, consisting of septage and grease trap waste., s43A Change to... Read more...Last updated: August 12, 2020
The proposal is for dredging of not more than 3,500,000 cubic metres off Anderson Point, for a third ship berth; disposal of dredge spoil on preexisting and previously approved land at Anderson Point; and extension of the approved open-pile wharf. Read more...Last updated: August 6, 2020
Section 46 change to conditions - Inquire into the suitability of the implementation conditions and whether any of them should be changed. Read more...Last updated: August 6, 2020
Change to Extension of Timeframe for substantial commencement. Read more...