This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 25, 2022
Harvey Water propose to construct and operate a pipeline and ocean outfall to dispose brine wastewater. The pipeline will be located between the Kemerton Strategic Industrial Area and the Indian Ocean south of Binningup in the Shire of Harvey. The pipeline will convey brine to a single outlet diffuser outfall. The outfall will be located approximately 400 m from the shoreline and will be installed under the seabed by horizontal directional drilling from the coast. The outlet pipe will protrude... Read more...Last updated: May 18, 2022
The proposal is to excavate and process gypsum ore and overburden from mining lease 70/1161. Inquiry under s46 to change the conditions of Ministerial Statement 730. Read more...Last updated: March 15, 2022
The requested change relates to changing condition 9 in order to contemporise the condition with the Environmental Factor Guideline – Greenhouse Gas (GHG) Emissions (EPA 2020) Read more...Last updated: March 14, 2022
The Public Transport Authority (PTA) proposes to construct and operate a new 13 kilometre (km) dual railway track between Malaga and Ellenbrook. The proposed Malaga to Ellenbrook extends from the proposed Bayswater to Malaga railway line. The proposal includes three new stations at Malaga, Whiteman Park and Ellenbrook with intermodal rail, bus, carpark and active mode (cycling and walking) facilities at each station. A potential future station is also proposed at Bennett Springs and rail... Read more...Last updated: February 2, 2022
The requested changes relate to condition 3 of Statement 1041 (as relevant to Statement 826) for an extension to the Time Limit of Authorisation for Proposal Implementation. Read more...Last updated: February 2, 2022
Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...Last updated: February 2, 2022
Change to Condition 9 (Rehabilitation) to remove reference to northern portion of Lot 2 Read more...Last updated: February 1, 2022
Changes to condition 7 to remove reference to the onsite brickmaking facility. Read more...Last updated: February 1, 2022
Lynas Kalgoorlie Pty Ltd (Lynas) propose to construct and operate a new Rare Earths Processing Facility at Lot 500 Great Eastern Highway, Yilkari and a By-product storage facility on Common Reserve 8767, Yarri Road, Parkerston in the City of Kalgoorlie-Boulder. The Rare Earths Processing Facility will process rare earth concentrate from the Mt Weld mine to produce a rare earth carbonate for export. Read more...Last updated: January 31, 2022
To build and operate a waste to energy plant on Lot 9500 Leath Road, Kwinana in the Kwinana Industrial Area. Read more...Last updated: January 31, 2022
APH Contractors proposes to extract approximately 2.2 million bank cubic metres of sand from 22.87 hectares over a period of 20 years at an annual extraction rate of 100,000 – 120,000 tonnes per year. Sand will be extracted to a maximum depth of 20m Australian Height Datum (AHD). It is proposed that sand extraction will continue from east of Gelorup Hill and move progressively southwards in 18 sand extraction blocks, each between one and two hectares. Embankments will be restored to 1:4 (14o)... Read more...Last updated: January 25, 2022
Dredging of approximately 3,900,000 cubic metres of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point and Stanley Point; disposal of dredged material at dredged material management areas. Read more...Last updated: December 24, 2021
The Proponent, FMG Iron Bridge Ltd, proposes to construct and operate the North Star Magnetite Iron Ore Mine, located approximately 110km south of Port Hedland, WA. The Project also includes a borefield in the Canning Basin and a slurry pipeline to transport the ore product to Port Hedland for export. Read more...Last updated: December 22, 2021
The proponent, Cliffs Asia Pacific Iron Ore Pty Ltd (Cliffs), owns and operates iron ore mines at the Windarling Range, the Mt Jackson Range and the Deception Deposit (collectively known as the "Yilgarn Operations") within the Shire of Yilgarn and Shire of Menzies. The Yilgarn Operations are authorised under seven Ministerial Statements issued between 2003 and 2012 by the Western Australian Minister for Environment under section 45(5) of the EP Act. These are: Ministerial Statement... Read more...Last updated: December 14, 2021
RCMA Australia is proposing to drill one conventional oil exploration well to determine if there is oil in the prospect, located 11 kilometres (km) south of Dongara / Port Denison in the onshore Perth Basin, within the Beekeepers Nature Reserve. The proposal includes all activities associated with drilling a conventional oil exploration well including site preparation, equipment mobilisation, drill, case and cement, decommissioning, demobilisation, site restoration and rehabilitation. The... Read more...Last updated: November 25, 2021
Changes to condition 5 (relating to performance review), condition 9 (relating to stack emissions), and condition 11 (relating to decommissioning), in order to contemporise the conditions of the Statement and streamline its regulatory obligations. Read more...Last updated: November 24, 2021
Mardie Minerals Pty Ltd proposes to develop a high volume salt and Sulphate of Potash project at Mardie, approximately 80 km south west of Karratha, in the Pilbara Region of Western Australia. The proposal would utilise seawater and evaporation to produce a concentrated salt product and other associated products., The proposal includes a seawater intake, evaporation ponds, processing plant, bitterns disposal pipeline and outfall, desalination plant, freshwater supply bores and associated... Read more...Last updated: November 23, 2021
Changes to Schedule 1 and Condition 12 (Odour Management) of Ministerial Statement 755 in order to: • Amend a key proposal characteristic in Schedule 1 regarding venting of odours. • Review the suitability of Condition 12 in light of the proposed change to Schedule 1 and having regard to the Licence requirements under Part V of the EP Act. Read more...