This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: February 11, 1991
The objectives of the proposal are to assess the effectiveness of Sumilarv against midges and its impact on non-target organisms in Lake Monger and North Lake. Both wet lands are highly eutrophic (nutrient enriched), there are severe midge nutrient problems during spring and the summer months and Abate is no longer a reliable control agent. The field trials involve applications of Sumilarv at a rate of 10kg/ha on three separate occasions. The compound will be applied by outboard dinghy and a... Read more...Last updated: February 8, 1991
The proposal is to construct dams for the purpose of growing marron. The proponent intends to ensure that the dams will be sealed with clay to ensure no leakage of groundwater into or out of the dams. A design criteria for the dams is that they shall not overflovv during vvinter, so that wastewater will only be generated when the dams are cleaned. A freeboard of 600 mm would be necessary to accommodate winter rainfall without overflow during most winters. The proponent intends to ensure... Read more...Last updated: February 7, 1991
The proposal is for the subdivision of Lots 1 & 2 Cockburn Sound Location 16, for industrial purposes. This is consistent with the present zoning of the land. The proposal is located on cleared land which was mined for limestone and then re-contoured. Part of the proposed subdivision is within the 200 m buffer area for the Water Authority Sewage Treatment Plant located north of Gordon Road, however as light winds which carry odours tend to occur in the evening outside of working hours the... Read more...Last updated: February 6, 1991
The proposal is to conduct a seismic survey for petroleum within Exploration Permit 351, located about 200 km north of Perth. The company proposes to test for petroleum in an area lying immediately to the west of Watheroo National Park. A total of 70 km of seismic traverses is planned. Portions of the survey may encroach into the western side of Watheroo National Park, parts of Flora and Fauna Reserve 27872, and an area proposed as a national park to link the Watheroo and Alexander Morrison... Read more...Last updated: February 5, 1991
Liquid Air is seeking to pipe hydrogen from CSBP and Farmers' nearby chlor-alkali plant. The proposal necessitates an extension of the existing 50 mm diameter pipeline through private land owned by Tiwest and CSBP and Farmers over a further distance of some 1.6 km. The proponent has identified a preliminary route for the pipeline extension. Approval from Tiwest for the pipeline extension within its boundaries has been granted and, because Liquid Air has a corporate relationship with CSBP... Read more...Last updated: December 13, 1990
Dominion Mining Limited submitted a Consultative Environmental Review for the Yakabindie Nickle Project to the Environmental Protection Authority in April 1990 (EPA Bulletin 444). Following assessement of the CER by the EPA, the Minister for the Environment issued a statement "that the proposal may be implemented" on the 29th November 1990 ( Ministerial Statement 117 ). Further studies carried out by the proponent on the location of facilities at the site have resulted in... Read more...Last updated: December 4, 1990
The proposed Yakabindie minesite is located within the lease area of the Yakabindie Pastoral Station approximately 5 kilometres east of the main Leinster to Wiluna road. An open cut mine is proposed to be developed at the site to produce approximately 6 million tonnes of low grade nickel sulphide ore per annum and 25 million tonnes of waste rock per annum. Mining will be carried out using conventional large-capacity diesel powered earthmoving equipment such as excavators, haul trucks and... Read more...Last updated: November 23, 1990
The proposal is to expand the capacity of the existing Dampier salt field from 2.5 million tonnes per annum to 4 million tonnes per annum. Expansion is planned in four stages, depending on market demand, commencing in 1990 through to about 1997. Expansion would occur within the existing salt field lease boundary which has been operating at Dampier since the late 1960s. The proposed expansion is based on recovering waste salt from the disused bitterns holding pond then utilising this previously... Read more...Last updated: November 8, 1990
The proposal is to place sand (surcharge) to a height of 4.5 metres along a 1.9 kilometre length of the Mitchell Freeway adjacent to Lake Monger. The sand is to be piled to consolidate peat and an old sanitary landfill site for works associated with the widening of the Mitchell Freeway and the provision of a median strip for the proposed Northern Suburbs Rail Link. Because of the presence of peat and sanitary landfill, the ground is relatively spongy and would create an unsuitable base for the... Read more...Last updated: October 25, 1990
On 9 June, 1989, the Environmental Protection Authority received a referral from the Department of Mines of a mining lease application (MLA 70/473) by Magic Soil Ply Ltd. The mining lease application is to supersede a prospecting licence application (PLA 70/807) over the same area and is for a proposal to mine diatomaceous earth from the north·western corner of the lake bed. The referral was held pending clarification of the Government's Policy on Exploration and Mining in Conservation... Read more...Last updated: October 17, 1990
Poseidon Bow River Diamond Mine Limited (Poseidon) operates an alluvial diamond mine on part of Lissadell Station, which is at the southern end of Lake Argyle in the Kimberleys. The original mining proposal was for an area of about 500 hectares and operations have been progressing since 1988 under mining lease conditions. The original mining proposal was not assessed under Part IV of the, Environmental Protection Act 1986, , but environmental conditions were set under several Works Approvals... Read more...Last updated: October 8, 1990
The proposal is to develop the Tubridgi Gas Field to supply natural gas to the existing Dampier to Perth pipeline. This would require the establishment of processing facilities on site near Onslow and an 85 kilometre connecting pipe to join into the main line. The gas field is about 36 square kilometres in area and lies under Urala Station pastoral lease, about 25 km south-west of the town of Onslow. It is estimated that up to 30 terajoules of gas per day could be collected over a field life of... Read more...Last updated: October 3, 1990
The Water Authority has stated that following the completion of the Pinjar groundwater development, a new major water supply source will be required by 1992. This reasoning is based on current and predicted water consumption demand even in view of the Water Authority's public water conservation programme. Because of the extent, magnitude and likely environmental implications of developing a new water supply source, the EPA required the Water Authority to prepare an ERMP for this project.... Read more...Last updated: September 19, 1990
The proposal is to develop a fuel unloading, storage and dispatching facility at the corner of Barter and Leath roads, Kwinana. The elements of the proposal are: install a 450mm (18 inch) fuel import line from the Bulk Cargo Jetty to the site construct refined oil tanks (two of 11,000 cubic metres for ULP and two of 3000 cubic metres for diesel) construct three small tanks for short term storage of each product install road tanker loading unit construct a small office and gate house Read more...Last updated: September 19, 1990
The proposal is to establish a Research and Development Facility at Kwinana to prove the feasibility of a direct iron ore smelting process capable of producing commercially saleable iron product. The iron would ultimately be used as feed material for the production of steel products. Hlsmelt Corporation Pty Ltd is a joint venture between CRA Limited and the Midrex Corporation of USA, which has been formed to manage the project. The research facility will be constructed within the boundaries of... Read more...Last updated: September 17, 1990
An application by McLean Consolidated Pty Ltd to export hardwood woodchips derived from the sawmill wastes of the Denmark Sawmill through the Port of Albany was approved by the Minister for Environment in 1988. Since being granted that approval, several factors concerning the original proposal have altered, including change of ownership of both the project and the sawmill. The proponent, Southern Plantations Chip Company Pty Ltd, now wishes to export woodchips derived from sawmill wastes... Read more...Last updated: September 10, 1990
The proposal is to provide reticulated gas to the public in the Mandurah area using standard air/gas mixing and storage facilities at SECWA's site in Gordon Road, Mandurah. The plant will provide an initial gas reticulation system to allow a customer base to be established. Further planning is to provide a connection to the Perth-Bunbury natural gas pipeline when the customer base is large enough to warrant the capital investment. The plant is similar to one operating in Albany... Read more...Last updated: August 23, 1990
The proposal is to import a dense grade of ammonium nitrate (known as "NITRAM"') from the UK in quantities of 2,000 tonnes at a frequency of three times per year through the Port of Esperance. The product would be transported in 1 ton bulka bags. Two ships, each with 2,000 tonnes of NITRAM, have left their ports of loading already: one is delayed in Africa, the other is proceeding to Australia. The ammonium nitrate is needed to fill an Australia-wide shortfall. Esperance is the... Read more...Last updated: August 1, 1990
The land proposed for residential development comprises Pt Location 1699 owned by Glen Retreat having an area of approximately 46 ha. An area of 4 ha will be excluded and developed for the new Mundaring Primary School, while an equivalent area is to be excised from an adjoining reserve and added to the residential development. The land is located on the Darling Plateau in the catchment of Jane Brook and Bugle Tree Creek. The soils vary from sandy gravels in the lower areas to gravelly sand with... Read more...Last updated: July 20, 1990
The proposal is to extract about 3.7 million tonnes of ore from about 30 hectares of land at Jangardup each year, to produce 271,000 tonnes of heavy mineral concentrate for trucking to Bunbury annually. The proposed mine life is eight years. Mining would be by a floating dredge feeding a wet separator. On average, some 56 truck trips (28 full, 28 return) per day would be required to transport the product to Bunbury. Read more...