This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 17, 2021
Doral Mineral Sands Pty Ltd is proposing to develop and operate a mineral sands deposit approximately 11 kilometres southeast of Busselton. The proposal includes the development of mine pits and associated infrastructure, wet concentration processing plant, solar evaporation ponds, groundwater abstraction and water management infrastructure and process water pond. The proposal would include a total disturbance of 453.34 hectares within a development envelope of 924.8 hectares. The majority of... Read more...Last updated: May 14, 2021
Change to condition 8-4 of Ministerial Statement 892, relating to the removal of one inactive Malleefowl mound. Read more...Last updated: May 14, 2021
The Minister has requested the EPA inquire into the question of whether the implementation conditions relating to Offsets in MS 1118 should be changed. The proponent has specifically requested: Amendment of wording of Condition 8-1 (3) to only refer to direct impacts to Ironcaps Banksia individuals. Removal of Condition 8-8 (4) and 8-8 (5), as these conditions refer to protection mechanisms and conservation reserves. Amend Conditions 8-7 to 8-12 to allow a rehabilitation based offset strategy,... Read more...Last updated: May 14, 2021
To mine a series of open pits over approximately 25 kilometres, within the Cataby Mineral Sands Project located approximately 150 km north of Perth. Inquiry under s46 relating to Ministerial Statement 720 and EPA Report 1212 . Read more...Last updated: April 28, 2021
Salt Lake Potash Limited propose to abstract Sulphate of Potash (SOP) rich brines to produce up to 260 kilotonnes per annum (ktpa) of SOP product. The proposal is located in and around Lake Way, approximately 25 kilometres south of Wiluna. The activities and infrastructure proposed includes evaporation ponds, brine abstraction trenches, paleochannel brine production bores, permanent brine pumps/pipework, access and infrastructure corridors and excess salt disposal areas. The proposal will cover... Read more...Last updated: April 16, 2021
Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman. Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. Mine dewatering will be required to accommodate below water table mining, requiring an additional ... Read more...Last updated: February 3, 2021
Main Roads WA is proposing to conduct works to upgrade approximately 1.5 kilometre (km) of High Street in the City of Fremantle, Western Australia. The upgrade from Stirling Highway to Carrington Street to a four lane dual carriageway is aimed at improving road safety. The works would require a total disturbance of approximately 20.1 hectares (ha), including 1.8 ha of the Fremantle Public Golf Course, Royal Fremantle Golf Club (Class A reserve) and 0.1 ha of the Fremantle Environmental Resource... Read more...Last updated: February 1, 2021
PEG proposes to construct and operate 14 new gas-fired reciprocating engines with a combined maximum installed capacity of 165 MW. It is expected the average annual throughput of the facility will be approximately 150 MW. The 165 MW power station is expected to result in 609,696 tCO2-e. The proposed PEG power station is located next to the existing Solomon power station and replaces the need for 221 MW power at Iron Bridge, which would have resulted in 1,196,423 tCO2-e. FMG have submitted a... Read more...Last updated: February 1, 2021
Peet Stratton Pty Ltd propose to develop the Lot 102 for urban uses as part of the wider Movida residential development. The proposal area is 8.6 hectares (ha) of which approximately 6ha is proposed for development. 2.65ha of native vegetation is proposed to be retained for conservation purposes. Read more...Last updated: February 1, 2021
Australian Potash Limited proposes to abstract brine resources to produce a sulfate of potash (SOP) product at the Lake Wells Potash Project. The proposal area is located on and adjacent to the Lake Wells Playa Lake system (salt lake terrain), approximately 160km north-northeast of Laverton in Western Australia. The proposal would include construction of an SOP processing plant, brine abstraction bores, evaporation ponds, raw water bore field, accommodation village and other associated... Read more...Last updated: January 22, 2021
Tronox Management Pty Limited proposes to develop the Cooljarloo West Titanium Minerals Project, 30 kilometres west from Cervantes, Shire of Dandaragan. The proposal involves the dredge mining of three orebodies: Woolka, Harrier and Kestrel. The proposal will require movement of the mining dredge and ore processing plant (concentrator) from the existing Cooljarloo Mine to Cooljarloo West and back again via flotation across an open channel. Read more...Last updated: January 22, 2021
Changes to condition 11 Offsets following a change to proposal after assessment Read more...Last updated: January 22, 2021
Changes to condition 13 Offsets following a change to proposal after assessment. Read more...Last updated: January 7, 2021
Alcoa of Australia have requested changes to conditions 8, 9, 10, 11 and 12 of Ministerial Statement 728 and 1069 in order to facilitate an increase in production to 3.3 million tonnes per annum (Mtpa). Read more...Last updated: January 4, 2021
Hamersley Iron Pty. Limited (a wholly -owned subsidiary of Rio Tinto) proposes the development of a major iron ore mining operation in the central Pilbara region of Western Australia. The development will be centered around its Koodaideri deposits, located 110 kilometres west-north-west of Newman. The Proposal will involve the construction and operation of a greenfields mine and associated infrastructure. Mining will consist of open pits and supporting infrastructure, including a 167 kilometre... Read more...Last updated: January 4, 2021
Hamersley Iron Pty Limited propose to develop above and below water table iron ore deposits and associated infrastructure at Western Turner Syncline. The proposal also includes an infrastructure corridor connecting the mining operation to the existing Tom Price mine ore-processing facilities. Surplus water from mining below water table would be managed by use on site and controlled discharge to the environment. Clearing of up to 750 ha would be required. The proposal is located 20 km west of... Read more...Last updated: November 23, 2020
Atlas Iron Pty. Ltd (the proponent) propose to develop the Miralga Creek DSO Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 8 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of four to five years. Associated infrastructure will include waste rock dumps. Existing borefield and accommodation... Read more...Last updated: November 4, 2020
The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area. The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation that includes... Read more...Last updated: November 3, 2020
The construction, operation and maintenance of a nominal 320 megawatt combined cycle base load power plant at Kwinana, as documented in schedule 1 of the ministerial statement. Read more...