This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 14, 2023
Changes to condition 3 of Ministerial Statement 976 in order to extend the Time Limit for Authorisation for substantial commencement of the proposal. Read more...Last updated: November 6, 2023
Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price. Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years. The proposal involves the clearing of up to 8,560 ha of native... Read more...Last updated: November 6, 2023
The proposal is for a desalination plant located approximately five kilometres (km) west of Cape Riche, and approximately 19 km from the nearest town of Wellstead. The desalination plant would be based on reverse osmosis technology. A seawater intake and pump station would be located 500 m east of Cheyne Inlet, and a brine outfall would be located on the south side of Cape Riche. Pipelines and infrastructure would be also constructed. Read more...Last updated: October 26, 2023
The proposal is to develop a mineral sand mine for the excavation and processing of a portion of the low-grade heavy mineral sand deposit, the Amy Zone, into a heavy mineral concentrate (HMC) in the Shark Bay district of Western Australia. The Amy Zone is approximately 35 km long, up to 3 km wide and 5 - 40 m thick. Read more...Last updated: October 19, 2023
Mardie Minerals Pty Ltd has approval to develop a greenfields high quality salt and SoP project and associated export facility at Mardie, approximately 80 km south-west of Karratha, in the Pilbara region of WA. The project will produce a high purity salt product, Sulphate of Potash (SoP) and other products that can be derived from sea water. The Proposal includes the expansion of the approved Mardie Project (Ministerial Statement [MS] 1175) including expanded concentrator and crystalliser ponds... Read more...Last updated: September 29, 2023
Atlas Iron Pty Ltd is proposing to develop and operate Stage 2 of the Sanjiv Ridge Project, a satellite operation to Stage 1, which will involve the above water table mining of approximately 10 million tonnes (Mt) of iron ore from the Glen Herring deposit which is located on an adjacent range 3 km west of Stage 1 and approximately 241 km south-east of Port Hedland in the Shire of East Pilbara. The proposal will consist of three new pits, four waste rock dumps and a 4 km haul road connecting to... Read more...Last updated: September 18, 2023
The proposal involves the excavation and processing of a low-grade (2.7%) heavy mineral sands deposit near Keysbrook to produce 920,000 tonnes of Heavy Mineral Concentrate (HMC) over 8 years. An area of 30 hectares (ha) would be progressively mined at any time. Topsoil would be removed and stockpiled for use in rehabilitation. The ore would be excavated and unloaded into a dump hopper located on the pit floor. The ore would be conveyed to a screening plant where oversize material would be... Read more...Last updated: August 15, 2023
Inquire into and report on the matter of changing condition 12 of Ministerial Statement 757 to align it with contemporary greenhouse gas conditions reflecting the content of the Pluto LNG Facility Greenhouse Gas Abatement Program. Read more...Last updated: August 15, 2023
Change to condition 1 commitment 1, updating the commitment to be in line with requirements under the Aboriginal Heritage Act 1972 and the Heritage Agreement in place between AGID and the local Traditional Owners (Buurabalayji Thalanyji Aboriginal Corporation (BTAC)). Read more...Last updated: August 11, 2023
The proposal is to construct a nominal 260MW peaking power plant, consisting of: two open cycle air-cooled gas turbine generator sets; standby liquid fuel storage (1.5ML of ultra low sulphur diesel); and ancillary buildings and plant. The plant will predominantly use natural gas, and will operate as a peaking plant for meeting short duration, high power demands for electricity. The plant may also operate as spinning reserve, using gas at a very low load in anticipation of high demand. The... Read more...Last updated: July 31, 2023
The proposal will provide additional port facilities at Port Hedland to receive and stockpile the product from emerging miners, specifically the various mines owned by the proponent’s shareholders, and load this product onto ships for export. Each of the shareholders is exploring and developing new iron ore projects in the Pilbara, with one company actively mining ore and exporting through the existing facilities in the Port of Port Hedland. The current shareholders of the proponent are Atlas... Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 regarding amending the conditions of Ministerial Statement 858 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is an expansion of the existing Roy Hill Port and will comprise the construction and operation of port infrastructure including, but not limited to, a stockyard, rail loop, train unloader, conveyors, wharf and ship[1]loading facility at Port Hedland. The proposal is a consolidation of the Roy Hill 1 Iron Ore Project, Port Infrastructure and the Multi-User Iron Ore Export (Landside) Facility approved proposals. Ministerial Statements 858, 978 and 1084 for the existing Roy Hill 1... Read more...Last updated: July 4, 2023
In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...Last updated: June 22, 2023
The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford and... Read more...Last updated: June 16, 2023
The requested change relates to condition 3 of Statement 1027 for an extension to the time limit for proposal implementation. Read more...