This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 4, 2016
Life-of-mine proposal to mine iron ore within Mining Leases 270SA and 47/292 at a rate of approximately 45 million tonnes per annum, and subsequent rehabilitation and decommissioning of the site. Inquiry under s46 to amend Ministerial Statement 679, the subject of EPA Report 1166 . Read more...Last updated: September 27, 2016
The construction and operation of the Wagerup Alumina Refinery to a maximum capacity of 4.7 million tonnes per annum and its associated bauxite mining. Inquiry under s46 regarding amendment of the conditions of Ministerial Statement 728. Read more...Last updated: September 27, 2016
The proposal area is approximately 33.4 hectares of Lot 4 Underwood Ave in Shenton Park. Within this area the University intends to establish a conservation area (13.9 hectares), Public Open Space (2 hectares) and a development area (17.5 hectares). The development area includes approximately 13 hectares to be developed for residential purposes with the remainder of the area for “University purposes - future use and development”, as it is affected by odour from the Subiaco Wastewater Treatment... Read more...Last updated: September 20, 2016
The proposal is to construct and operate an iron ore mine in the Goldfields region of Western Australia. The proposal involves mining of hematite direct shipping ore (DSO) from a single open pit on the Yendilberin Hills, which form part of the Finnerty Range. Read more...Last updated: September 6, 2016
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. The proposal is further documented in EPA Report 1375 and Ministerial Statement 861 . Read more...Last updated: September 1, 2016
The Public Transport Authority of Western Australia proposes the Forrestfield-Airport Link, a 9km extension of the Perth rail network from Bayswater to Forrestfield. Read more...Last updated: August 31, 2016
Austeel Pty Ltd proposes to mine iron ore from the George Palmer Orebody on a pastoral lease about 25km south of Cape Preston. Ore will be fed to a purpose-built process plant to produce up to 13.8 million tonnes per annum of pellet iron and 4.7 million tonnes per annum of direct reduced iron (DRI) and/or hot briquetted iron (HBI). The products will be exported via a new port to be built at Cape Preston and Preston Island. Associated components comprise waste dumps, tailings storage facility,... Read more...Last updated: August 24, 2016
The proposal involves establishing an agricultural scheme that comprises a series of irrigated pivot cells for hay production, and will aim to increase productivity and sustainability of pastoral operations in the Pilbara. The proposal will utilise mine water, surplus to other MMP2 requirements, and forms an important component of the integrated MMP2 water management strategy. The Project area is approximately 2,800 hectares of which a maximum of 1,815 hectares is to be disturbed. This includes... Read more...Last updated: August 19, 2016
The proposal includes an open-cut lead carbonate mine and processing facilities 30 kilometres west of the Wiluna townsite. The lead carbonate concentrate produced at the mine-site is transported in sealed bags within locked shipping containers by road from the mine-site to Leonora and then by rail to the Port of Fremantle where it is exported. Read more...Last updated: June 29, 2016
The proposal is to develop an open cut coal mine at the Premier deposit in the Shotts Sub-Basin of the Collie Coal Basin. The Premier Coal Mine would supply approximately 2 million tonnes of coal per year to the proposed private power station due to be built by 1996. It is a proposed open cut coal mining operation which will have a life of 30 years and is on the scale of the Muja mining operation. The mining method will follow the practices being used in the existing open cut operations... Read more...Last updated: June 1, 2016
The proposal involves an extension to the Wheelarra Hill open pits and overburden storage areas, and the mining of the South Jimblebar and Hashimoto deposits, with disposal of overburden into adjacent Overburden Storage Areas (OSAs) and in-pit disposal. Inquiry under s46 related to Ministerial Statement 857, the subject of EPA Report 1371. Read more...Last updated: May 4, 2016
Life-of-mine proposal to mine iron ore within Mining Leases 270SA and 47/292 at a rate of approximately 45 million tonnes per annum, and subsequent rehabilitation and decommissioning of the site. Read more...Last updated: May 2, 2016
The proposal is to develop an iron ore mine on the Iron Valley tenement located in the Shire of East Pilbara approximately 90 kilometres north-west of Newman. The project would include an above watertable blast and hydraulic shovel open pit mine and supporting infrastructure including dry crushing and screening plant, run of mine pad, waste rock landform, internal roads, power production, hazardous materials storage, waste management facilities, office buildings and an accommodation camp. Read more...Last updated: April 26, 2016
The proposal is to construct and operate a Wood Waste to Energy Plant at the existing Hazelmere Recycling Centre on Part Lot 100 and Lot 301, Lakes Road, Hazelmere. Read more...Last updated: March 3, 2016
The proposal includes the existing Hamersley Yandicoogina iron ore project and proposed expansion. The existing project includes open pit mining at the Junction Central and Junction South East operations and associated infrastructure, dewatering activities, closure and rehabilitation. The expansion includes the development of new pits at Junction South West and Oxbow, temporary waste landforms, the development of new infrastructure, additional dewatering and water disposal activities. The... Read more...Last updated: February 4, 2016
The West Pilbara Iron Ore Project Stage 1 – Mine and Rail proposal is to develop and operate eight iron ore deposits 35 to 85 km south of Pannawonica and a heavy-haulage railway that connects the mine area to the Anketell Point Port precinct. The EPA's assessment report (Report 1409) was released on 3 August 2011. The Minister for Environment approved the proposal for implementation, subject to the implementation conditions of Ministerial Statement 881 (30 November 2011). In August 2015,... Read more...Last updated: December 24, 2015
The proposal is to develop and operate the Baby Hope iron ore deposit, located 75 km north-west of Newman in the Pilbara region of WA. The Baby Hope proposal includes above water table open pits, waste rock dumps and supporting transport infrastructure. Clearing of up to 1,000 ha within the existing Hope Downs 1 development envelope would be required for the proposal. Product from the Baby Hope deposit would be processed at the at the existing Hope Downs processing facilities. Read more...Last updated: November 17, 2015
To extend the Argyle Diamond Mine operations to develop an underground diamond mine and associated infrastructure 110 km south of Kununurra in the Shire of Wyndham-East Kimberley. This inquiry relates to Ministerial Statement 711, the subject of EPA Report 1205 . Read more...Last updated: November 12, 2015
The proposal is to construct and operate an open-cut iron ore mine, and associated infrastructure, approximately 40 kilometres (km) east of Newman. Read more...Last updated: November 11, 2015
The proposal is to extend the mining of the existing approved above watertable Orebody 29, 30, and 35 mines located approximately 7 km west-south-west of Newman, in the Shire of East Pilbara, to below the watertable and discharge any excess dewatering from these three orebodies into Ophthalmia Dam. Read more...