This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 19, 2018
Argyle Cattle Company Pty Ltd proposes to disturb up to to 1,200 ha of native vegetation for 650 ha of irrigated pasture and fodder and associated infrastructure. The proposal is located 64 km south of Broome on the Great Northern Highway, in the Shire of Broome. Read more...Last updated: November 12, 2018
The proposal is to develop and operate an iron ore mine approximately 50 km west-northwest of Paraburdoo, Western Australia, a 20 km long gas pipeline corridor, and a 150 km long rail transport corridor that would connect the proposed mine to the West Pilbara Iron Ore Project Stage 1 infrastructure. Read more...Last updated: November 12, 2018
The proposal is to construct and operate an iron ore export facility at Cape Preston East in the Pilbara region of WA. Read more...Last updated: October 15, 2018
Alcoa proposes to expand the Wagerup Refinery through construction of a third production unit. The proposed production increase to approximately 4.7 Mtpa alumina is to be achieved by a combination of new equipment and upgrade of existing equipment in order to achieve an increase in both capacity and efficiency. As the Wagerup Refinery has been subject to previous assessments, this represents a revised proposal pursuant to s 45B of the EP Act. The current maximum production permitted under the... Read more...Last updated: September 25, 2018
Rosslyn Hill Mining Pty Ltd is proposing to expand their operations at Paroo Station to install a hydrometallurgical facility to convert lead carbonate concentrate to lead metal (ingots). The proposal is located 30 km west of Wiluna (Shire of Wiluna). The proposal includes an additional clearing of approximately 400 hectares, and the exportation of the product through the Port of Fremantle. Read more...Last updated: September 21, 2018
This is the inquiry into a request for changes to Ministerial Statement 906 , relating to the Point Grey Marina. Read more...Last updated: July 25, 2018
Pardoo Beef Corporation Pty Ltd proposes to develop a centre-pivot irrigated feed crop production facility. Centre-pivot irrigation is a method of crop irrigation in which equipment rotates around a pivot and crops are watered with sprinklers. The proposal is approximately 100km east-northeast of Port Hedland and 365km south west of Broome. The proposal is for stage 3 and would include a total disturbance of 368 hectares development envelope. Read more...Last updated: July 16, 2018
The proposal is to construct and operate a Waste-to-Energy (WtE) and Materials Recovery Facility (MRF) at the Boodarie Strategic Industrial Area, Port Hedland. The proposed facility would accept various wastes, recover materials that can be economically recycled via the MRF and convert suitable remaining waste to electrical power in a WtE plant. Read more...Last updated: June 21, 2018
Main Roads Western Australia (MRWA) proposes to construct and maintain a new road from Northwest Coastal Highway (near Karratha), through the Millstream-Chichester National Park (NP), to the Nanutarra-Munjina Road intersection (north of Tom Price). Read more...Last updated: June 11, 2018
The proposal is for the construction and operation of a technical ammonium nitrate production facility (TANPF) on Site D within the King Bay/Hearson Cove Industrial Estate on the Burrup Peninsula. The proposal is located approximately 13 kilometres north-west of Karratha. Read more...Last updated: April 18, 2018
Gold Road Resources Limited propose to develop a gold mine know as the Gruyere Gold Project located approximately 200 km north-east of Laverton. The proposal includes clearing of no more than 2,260 ha of vegetation and groundwater dewatering for mining and processing. Read more...Last updated: April 4, 2018
Griffin Energy Pty Ltd, proposes to construct and operate the 200MW Bluewaters Power Station on a site located approximately 4km north-east of Collie. It will be a subcritical coal fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters Power Station will supply electricity to customers in the proposed Coolangatta Industrial Estate, or via the South West Interconnected System (SWIS). Read more...Last updated: April 4, 2018
Griffin Power Pty Ltd, proposes to construct and operate a 200MW coal-fired power station known as the Bluewaters Power Station Phase II (Bluewaters II) adjacent to the proposed Bluewaters Power Station (Bluewaters I) on a site located approximately 4km north-east of Collie. It would be a subcritical coal-fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters II Power Station would supplement the Bluewaters I Power Station and supply electricity... Read more...Last updated: March 23, 2018
The Bluewaters Power Station Phase I and II proposals were to construct and operate a sub-critical coal-fired base-load power generating facility with a nominal generating capacity of 200 megawatts per phase, four kilometres north east of Collie. The previous Minister for Environment requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions relating to the Bluewaters Power Station proposal, with particular... Read more...Last updated: March 19, 2018
The Cape Lambert to Emu Siding Rail Duplication and Borrow Pits in Millstream Chichester National Park proposal (the proposal) includes the approved rail line and eastern deviation and associated infrastructure adjacent to the existing rail line from Cape Lambert to Emu Siding. The seven borrow pits within the Millstream Chichester National Park are for use in the construction and maintenance of rail lines and associated infrastructure. The Minister for Environment has requested that the... Read more...Last updated: January 29, 2018
Ray Village Aged Services (Inc) trading as Capecare is proposing to develop a 1.28 ha portion of Armstrong Reserve, Naturaliste Terrace, Dunsborough in order to construct an aged care facility. The proposal will require clearing 9020m2 of native vegetation. The proposed aged care facility will consist of an adult day care centre, independent and supported living accommodation units, administration offices and community facilities including meeting rooms for the CWA. Read more...Last updated: January 24, 2018
The Shire of Denmark proposes to extend the existing quarry and crush limesand within an A Class Parkland and Recreation Reserve vested in the Shire of Denmark. Read more...Last updated: December 21, 2017
The proposal is for clearing of access tracks and clearing, leveling and cut and fill of drill pads for exploration drilling on the Mungada Ridge of the Midwest Region of Western Australia. Read more...Last updated: December 21, 2017
Proposal by Sinosteel Midwest Corporation Limited to mine hematite ore at Koolanooka Hills and at two locations at Mungada (part of the Blue Hills Range), to reinstate the Mungada Haul Road to its original width and construct an accommodation camp at Old Karara Homestead. Read more...Last updated: December 18, 2017
The Wagerup Alumina Refinery revised proposal is to construct and operate the Wagerup Alumina Refinery to a maximum production capacity of 4.7 million tonnes per annum (Mtpa) and its associated bauxite mining. The proponent for the proposal, Alcoa of Australia (Alcoa), requested an extension of the Time Limit of Authorisation for substantial commencement (now referred to as the Time Limit of Proposal Implementation) to be extended by five years to 14 September 2021 as the third production unit... Read more...