This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 19, 2023
In order to support the continued growth and optimisation of Mineral Resources Limited (MRL) Yilgarn Operations, the Parker Range Iron Ore Project (PRIOP) is now proposed to be developed as a satellite operation to the Yilgarn Iron Pty Ltd Koolyanobbing Project (Koolyanobbing Operations). The Proposal has been referred as a Revised Proposal for the Parker Range (Mount Caudan) Iron Ore Proposal, which is approved under Ministerial Statement 892. The Proposal intends to develop a new private haul... Read more...Last updated: February 28, 2023
Changes to condition 13-1 and 13-3 of Ministerial Statement 1114 (as amended) following a change to proposal after assessment. Read more...Last updated: February 15, 2023
Main Roads Western Australia is proposing to construct and operate the southern section of the Bunbury Outer Ring Road (BORR). The proposal includes 10.5 km of freeway-standard dual carriageway, 3 km of rural distributor roads and other associated road-infrastructure. The BORR southern section will connect to the proposed northern and central sections of BORR near South West Highway, which together will complete a bypass around Bunbury City from Forest Highway to Bussell Highway. The BORR... Read more...Last updated: December 21, 2022
The proposal is to expand an existing salt mining operation by constructing a new primary concentration pond (which would lie outside the existing mining leases) and additional brine, bitterns and crystallization ponds within the existing leases. The current operation is located on coastal flats near Port Hedland with the primary concentration ponds 30 km to the east and the brine ponds 10 km to the east connected by an aqueduct. Once the brine is fully saturated it is pumped to crystallisation... Read more...Last updated: November 24, 2022
The Revised Proposal outlines a significant increase in ground disturbance to that previously approved, a revised materials management strategy, a Life of Mine water management strategy including Managed Aquifer Reinjection, a significant increase in dewatering volumes and establishment of permanent surface water diversion structures. Read more...Last updated: November 23, 2022
Covalent Lithium Pty Ltd propose to make changes to their existing approved lithium mine. Changes include the construction and operation of a solar plant to provide renewable energy, changes to the tailings disposal method from a dry to a wet tailings, co-disposal of inert refinery waste generated from the Kwinana Lithium Refinery and modification of existing flora and vegetation and fauna exclusion areas. The revised proposal would include the additional disturbance of 56 hectares (ha). Read more...Last updated: November 8, 2022
Sheffield Resources Limited is seeking approval to develop the Thunderbird Mineral Sands Project located on the Dampier Peninsula, approximately 75 kilometres southwest of Derby, Western Australia. The proposal is for a mineral sands operation with an estimated 40 year life of mine. Mineral product will be mined from the Thunderbird Deposit and processed onsite before being transported by road to the Derby Wharf for storage and subsequent export. Read more...Last updated: October 27, 2022
Proposal to build and operate a Regional Resource Recovery Center on Pt Lot 78 and Pt Lot 85 Bannister Rd, Canning Vale. Read more...Last updated: October 24, 2022
The Jansz feed gas pipeline is proposed to supply natural gas from the Jansz/Io field located in Commonwealth waters approximately 200km off the Pilbara coast of Western Australia and pipe it across the Barrow Island Nature Reserve to the Gorgon Gas Treatment Plant on Barrow Island. Read more...Last updated: October 19, 2022
Adequacy of the existing implementation conditions of the above mentioned Ministerial Statements with respect to avoiding, reducing and offsetting greenhouse gas emissions. Read more...Last updated: September 1, 2022
Hamersley Iron Pty Limited have submitted a revised proposal for Brockman IV. This proposal provides for the expansion of the existing mine including additional clearing and the release of excess water, as well as some other minor changes. Read more...Last updated: August 29, 2022
The proposal is for the development of residential, commercial and public open space land uses, a single entrance marina and the management of conservation areas on Lot 5000 and Part Lot 5001 Pipidinny Road and Part Lot 9005 Marmion Ave, Eglinton. The EPA's report on the assessment was published as Bulletin 500, and Ministerial Statement 150 was published on 8 July 1991. In March 2013, Eglinton Estates Pty Ltd wrote to the EPA requesting minor amendments to the existing Implementation... Read more...Last updated: August 23, 2022
Australian Gold Reagents Pty Ltd propose to increase production at the existing Kwinana sodium cyanide liquid plant from 91,000 tonnes per annum (tpa) to a total of 110,000 tpa; and to increase production of solid sodium cyanide from 45,000 tpa up to 60,000 tpa. The proposal also includes connecting the two existing thermal combustion units to allow waste gas from either plant during down time to be directed through a combined header to the operational thermal combustion unit for effective... Read more...Last updated: August 4, 2022
Yara Pilbara Fertilisers Pty Ltd propose to modify the existing Pilbara Fertiliser project to include the development of a Renewable Hydrogen Plant and associated infrastructure. The proposal is located approximately 11 km north-west of Karratha in the Pilbara region of Western Australia. The proposal is adjacent to the National Heritage listed area and the Murujuga National Park. The proposal would include a total disturbance of 24.78 hectares. The proposal will result in reduction of... Read more...Last updated: August 4, 2022
Hamersley Iron Pty Limited (the proponent) propose to develop the Greater Paraburdoo Iron Ore Hub. The proposal is an expansion of the existing operations at Paraburdoo and Eastern Range which is not subject to a Ministerial Statement issued under Part IV of the, Environmental Protection Act 1986, (EP Act). The proposal area is located approximately six kilometres south of the town of Paraburdoo in the Pilbara region of Western Australia. Existing operations at Paraburdoo and Eastern Range are... Read more...Last updated: July 21, 2022
Change to condition 3 – Time Limit for Proposal Implementation. Extension of time limit of five years to 18 November 2025. Read more...Last updated: July 7, 2022
The Proposal is to develop a new bridge with a single lane dual carriage road and dual use path over the Preston River, to Turkey Point, Bunbury, Western Australia. The Proposal requires a disturbance footprint of 9.59 ha within the overall Proposal Development Envelope (DE) of 11.34 ha. Subtropical Temperate Coastal Saltmarsh Threatened Ecological Community (VT03 and VT04) is present within the Proposal DE and will require clearing of approximately 1.36 ha. 1.22 ha has been identified as... Read more...Last updated: July 1, 2022
The proposal is to construct and operate an iron ore export facility at Balla Balla midway between Port Hedland and Karratha, northwest of Whim Creek in the Pilbara region of WA. Read more...Last updated: June 20, 2022
The proposal is to develop a silver, lead and zinc mine, associated infrastructure and processing facilities approximately 50 kilometres north of Kununurra, with the concentrate produced transported by road and shipped through Wyndham Port. Read more...Last updated: June 14, 2022
The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...