This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 1, 2021
The proposal is an expansion of the existing Sino Iron Project approved under Ministerial Statement 635 (as amended). The proposal is required to accommodate continuation of mine operations associated with the existing two billion tonnes mining rights afforded to Sino Iron and Korean Steel in accordance with existing commercial agreements. It includes the expansion of the mine pit, waste dumps and Tailings Storage Facilities. The proposed mine pit expansion will increase in depth from 220 m to... Read more...Last updated: September 1, 2021
The proposal is for the construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing. Read more...Last updated: April 16, 2021
Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman. Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. Mine dewatering will be required to accommodate below water table mining, requiring an additional ... Read more...Last updated: February 1, 2021
PEG proposes to construct and operate 14 new gas-fired reciprocating engines with a combined maximum installed capacity of 165 MW. It is expected the average annual throughput of the facility will be approximately 150 MW. The 165 MW power station is expected to result in 609,696 tCO2-e. The proposed PEG power station is located next to the existing Solomon power station and replaces the need for 221 MW power at Iron Bridge, which would have resulted in 1,196,423 tCO2-e. FMG have submitted a... Read more...