This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 13, 2002
The proposal being assessed is for the diversion of 8 gigalitres a year (on average) (GL/yr) of unallocated water resources in the Samson Catchment to be diverted for public water supply, the construction of a pipe head dam and related infrastructure. The Samson Brook Redevelopment Scheme is a key element of the Water Corporation’s drought recovery plan. Read more...Last updated: February 6, 2002
The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains. The M2 Project is located near Kununurra within the Victoria-Bonaparte Biogeographic Region and the project area extends over approximately 76,000 ha of land comprising the Weaber, Keep River and Knox Creek Plains, and involves approximately equal areas within WA and the NT. The proposal has been assessed in two parts: biodiversity and management. This assessment is of the management component. See... Read more...Last updated: November 14, 2001
The proposed airport will be located in a site approximately 12 km north-east of Broome townsite. The proposal involves the construction of one main runway, parallel taxiway, turning nodes, apron parking, general aviation parking, maintenance and storage hangers and fuel storage. It also includes domestic and international terminals, land-side and airside commercial activities and a short future parallel runway for light aircraft. Read more...Last updated: November 28, 2000
The proposal is to develop two iron ore deposits (Nammuldi and Silvergrass) near Hamersley Iron Pty Limited’s current Brockman No. 2 iron ore mine, 65 kilometres north-west of Tom Price. Read more...Last updated: August 9, 2000
Proposal to develop the Wallaby Gold Mine. Located on the shore of Lake Carey, a naturally occurring saline wetland approximately 27 km south-west of Laverton. The Wallaby Gold Mine Project includes development of an open cut gold mine, waste rock dumps and infrastructure to support mining on the northern shoreline of the lake. Gold ore produced at the mine will be transported via overland conveyor to an existing processing plant with tailings placed in both an extended and a new tailings... Read more...Last updated: July 13, 2000
The proposal includes gold mining developments within a defined project area on Lake Lefroy a naturally occurring salt lake approximately 7 kilometres south-east of Kambalda. Thirteen sites have already been identified for development of open-cut gold mining pits, some with underground portals and mining. Additional sites may be identified within the defined project area. Waste rock dumps, access infrastructure and mining support facilities such as workshops and contractor's compounds will... Read more...Last updated: April 19, 2000
Inquiry under section 46 of the Environmental Protection Act 1986 to extend the time limit of the environmental approval for the Great Eastern Highway Northam bypass. Read more...Last updated: April 4, 2000
The proposal is to construct and operate an extension to the Bibra Lake Main Sewer. Read more...Last updated: March 13, 2000
Subdivision of Lots 1 and 2 Baldivis Road, City of Rockingham. Read more...Last updated: October 29, 1999
Proposal to redevelop the Harvey and Stirling Reservoir system in order to divert an additional quantity of water from the Harvey Basin for the Perth Metropolitan Water Supply Scheme (PMWSS). The proposal involves the construction of a new pipeline from Harris Sam to Stirling Reservoir to enable transfer of water. Read more...Last updated: June 4, 1999
The Western Australian Planning Commission proposes to rezone the majority of the Forrestfield Marshalling Yards to "Industrial" from the current Metropolitan Region Scheme reservation of "Railways" and to relocate the "Important Regional Road" (Dundas Road) to a site within the Forrestfield Marshalling Yards. Read more...Last updated: April 27, 1999
The proposal is to subdivide lots 5,8,9 and 10 Haigh Road (Garden Street) and lots 15 and 16 Shreeve Road, Canning Vale (City of Gosnells) for residential purposes. The subdivision has a gross area of approximately 12 hectares. It includes approximately 150 single residential lots ranging in size from around 480 square metres to around 815 square metres, several duplex size lots, public open space and roads. Read more...Last updated: April 27, 1999
The proposal is to subdivide for residential purposes Lot 11 Bridge road and Lot 6 Haigh Road, Canning Vale. The subdivision has a gross area of approximately 3.2 hectares. It includes approximately 27 single residential lots ranging in size from around 540 square metres, several duplex size lots, public open space and roads. Read more...Last updated: October 9, 1998
The proposal is to manage the environmental impact of a former liquid waste disposal site in Southern River Road, Gosnells. The site includes 13 unlined lagoons constructed from sand. Discharges to the lagoons included primarily septage and brewery wastes, however unknown quantities of other wastes were also discharged. Read more...Last updated: September 18, 1998
The proposal is for the subdivision of part Lot 402, Rae Road, Rockingham for Residential and Commercial Purposes and the ceding of the Parks and Recreation reserve and the important regional road reserve to the Crown. Read more...Last updated: August 21, 1998
The Water Corporation proposes to construct a 500mm-600mm diameter pressure sewer main and associated pump station to service the sewage requirements of residential development within the vicinity of the Ellenbrook Development located 26km north of the Perth CBD. Read more...Last updated: May 5, 1998
The proposal is to develop a soccer and recreation facility at lot 14 Progress Drive, Bibra Lake. The development is proposed for council owned land, within the Beliar Regional Park and System 6 Reserve M93 and the land proposed to be developed is zoned "Parks and Recreation". Read more...Last updated: December 19, 1997
The proposal is to manage an additional 67 ,500m 3 of contaminated material as part of the rehabilitation of former industrial land at McCabe Street, Mosman Park . Clean-up of this industrial land commenced in 1995 and has been subject to three previous assessments (EPA Bulletins 324, 699 and 807). The proponents are seeking to amend the existing conditions of approval ( Ministerial Statement 338 ) under Section 46 of the, Environmental Protection Act 1986, to allow for disposal of the... Read more...Last updated: November 21, 1997
The proposal is to establish Class IV waste disposal cells at the proponent's existing Red Hill Waste Disposal Facility. These waste cells would provide for the disposal of low hazard wastes, including contaminated soils and household hazardous wastes, within the Perth metropolitan area. The facility is located approximately 12 km north east of Midland on Toodyay Road, Red Hill. Read more...Last updated: August 28, 1997
The proposal is for a staged development of a 120 hectare prawn farm at Heron Point, approximately 35 kilometres south of Exmouth in Exmouth Gulf. Read more...