Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • Infrastructure (8) Apply Infrastructure filter
  • Iron Ore (7) Apply Iron Ore filter
  • Industrial (3) Apply Industrial filter
  • Sand, rock, gravel and clay (2) Apply Sand, rock, gravel and clay filter
  • Clearing (1) Apply Clearing filter
  • Gold (1) Apply Gold filter
  • Oil and gas (1) Apply Oil and gas filter
  • Rare earth elements (1) Apply Rare earth elements filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by preliminary environmental factors:

  • (-) Remove Flora and Vegetation filter Flora and Vegetation
  • Terrestrial Fauna (10) Apply Terrestrial Fauna filter
  • Hydrological Processes (8) Apply Hydrological Processes filter
  • Air Quality (7) Apply Air Quality filter
  • Inland Waters Environmental Quality (7) Apply Inland Waters Environmental Quality filter
  • Social Surroundings (5) Apply Social Surroundings filter
  • Subterranean Fauna (3) Apply Subterranean Fauna filter
  • Terrestrial Environmental Quality (3) Apply Terrestrial Environmental Quality filter
  • Benthic Communities and Habitats (2) Apply Benthic Communities and Habitats filter
  • Marine Environmental Quality (2) Apply Marine Environmental Quality filter
  • Marine Fauna (2) Apply Marine Fauna filter
  • Landforms (1) Apply Landforms filter
  • People (1) Apply People filter

Filter by Proponent:

  • Cliffs Asia Pacific Iron Ore Pty Ltd (2) Apply Cliffs Asia Pacific Iron Ore Pty Ltd filter
  • Atlas Iron Limited (1) Apply Atlas Iron Limited filter
  • BHP Biliton Iron Ore (1) Apply BHP Biliton Iron Ore filter
  • BHP Billiton Petroleum Pty Ltd (1) Apply BHP Billiton Petroleum Pty Ltd filter
  • BHP Iron Ore Pty Ltd. (1) Apply BHP Iron Ore Pty Ltd. filter
  • Crosslands Resources Ltd (1) Apply Crosslands Resources Ltd filter
  • CSR Gyprock Fibre Cement (1) Apply CSR Gyprock Fibre Cement filter
  • Fortescue Metals Group Limited (1) Apply Fortescue Metals Group Limited filter
  • Grange Resources Limited (1) Apply Grange Resources Limited filter
  • Karara Mining Ltd (1) Apply Karara Mining Ltd filter
  • LG and HM McDonald (1) Apply LG and HM McDonald filter
  • Newcrest Mining Limited (1) Apply Newcrest Mining Limited filter
  • Pilbara Iron Pty Ltd (1) Apply Pilbara Iron Pty Ltd filter
  • Point Grey Development Company Pty Ltd (1) Apply Point Grey Development Company Pty Ltd filter
  • Portman Iron Ore Limited (1) Apply Portman Iron Ore Limited filter
  • Reed Resources Ltd (1) Apply Reed Resources Ltd filter
  • Rio Tinto Iron Ore (1) Apply Rio Tinto Iron Ore filter
  • Robe River Iron Associates (1) Apply Robe River Iron Associates filter
  • Robe River Mining Co Pty Ltd (1) Apply Robe River Mining Co Pty Ltd filter
  • Water Corporation (1) Apply Water Corporation filter

Filter by region:

  • Pilbara (10) Apply Pilbara filter
  • Mid West (3) Apply Mid West filter
  • South West (2) Apply South West filter
  • Gascoyne (1) Apply Gascoyne filter
  • Goldfields Esperance (1) Apply Goldfields Esperance filter
  • Great Southern (1) Apply Great Southern filter
  • Peel (1) Apply Peel filter
  • Wheatbelt (1) Apply Wheatbelt filter

Filter by last updated:

  • (-) Remove 2012 filter 2012
  1. Home
  2. Proposal search
  3. Ministerial Statement published
  4. 2012
  5. Flora and Vegetation

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Borrow Pits in Millstream Chichester National Park

Last updated: December 20, 2012

The proposal is for seven borrow pits in the Millstream Chichester National Park (MCNP) where up to 118 hectares (ha) will be disturbed, of which 90 ha is within the national park and the remainder in the excised rail corridor. All borrow pits within the MCNP are within existing Rio Tinto Iron Ore licence areas granted under the, Mining Act 1978, (Robe River Mining Company is a subsidiary of Rio Tinto) and all borrow material will only be used for projects or portions of projects that are... Read more...

Newman Satellite Development - Orebody 23

Last updated: December 4, 2012

The proposal is for mining of iron ore below the watertable from the Orebody 23 deposit on the Ophthalmia Range, including de-watering operations, approximately 13 kilometres north-east of Newman, Shire of East Pilbara. Read more...

Barrambie Vanadium Project

Last updated: October 22, 2012

To develop an open-cut vanadium mine and process plant at Barrambie, 75 kilometres north-west of the Sandstone townsite and 116 kilometres south-east of Meekatharra Read more...

Augusta Wastewater Treatment plant (s. 46)

Last updated: October 4, 2012

Request to change implementation conditions of Ministerial Statement 126 . Read more...

Windarling Range W3/5 Deposit Deepening

Last updated: August 29, 2012

The proposal is situated on Mining Leases M77/999 and M77/1000, approximately 130 kilometres north of Southern Cross in the Shire of Yilgarn. The proposal is to mine iron ore by open cut mining below the groundwater table in the portion of the W3/5 Deposit at Windarling Range. The depth of the open-cut mine will increase from nominally 400 metres Australian Height Datum (AHD) to nominally 315 metres AHD. Read more...

Point Grey Marina

Last updated: August 1, 2012

The proposal is for the construction of an onshore marina (and associated boating infrastructure e.g. boat pens, jetties, navigational aids, entrance channel, protective groynes, public boat ramps and car parks) on the western side of the Point Grey peninsula. The proposal also includes the construction of a 2.5 kilometre navigation channel across the Harvey Estuary from the marina to the Dawesville Channel. Read more...

Pardoo Direct Shipping Ore Project Port Hedland

Last updated: July 24, 2012

The proposal is to develop and operate a direct shipping iron ore project in the Pilbara. The project involves the open-cut mining of eight small pits approximately 70 kilometres east of Port Hedland to obtain direct shipping ore quality haematite. Annual ore production will be 1.5 million tonnes. Read more...

Cape Riche Seawater Desalination Plant

Last updated: July 19, 2012

The proposal is for a desalination plant located approximately five kilometres (km) west of Cape Riche, and approximately 19 km from the nearest town of Wellstead. The desalination plant would be based on reverse osmosis technology. A seawater intake and pump station would be located 500 m east of Cheyne Inlet, and a brine outfall would be located on the south side of Cape Riche. Pipelines and infrastructure would be also constructed. Read more...

Cape Lambert to Emu Siding Rail Duplication

Last updated: June 19, 2012

The proposal is to construct and operate approximately 70 km of duplicate rail line and supporting infrastructure from the Cape Lambert Port facilities to Emu Siding. Read more...

Expansion to Limestone Quarry on Mining Lease 08/06 Sub Lease 3H/034, 8 km south-west of Exmouth

Last updated: May 30, 2012

The proposal is to clear up to 3.7 hectares of native vegetation for a limestone quarry, to screen the material on-site, re-establish an access road and rehabilitate all of the disturbed areas. Read more...

Koolyanobbing Iron Ore Project, Windarling W2 pit mining below the groundwater table

Last updated: May 30, 2012

The proposal is for open-cut mining of iron ore (haematite) below the groundwater table at the currently mined W2 pit at Windarling, approximately 90 kilometres north-north-east of Koolyanobbing. The open-cut mine will require a depth increase of approximately 114 metres from nominally 402 metres Australian Height Datum (AHD) to 288 metres AHD. This will enable mining of an estimated six million tonnes of ore. Read more...

Karara Iron Ore Project, 215 km east-south-east of Geraldton and 320 km north-north-east of Perth, Shire of Perenjori (s. 46)

Last updated: May 4, 2012

Inquiry under s46 regarding amendments to the conditions of Ministerial Statement 805 . Read more...

Telfer Project, Power Supply and Infrastructure Corridor, Port Hedland to Telfer Gold Mine, Great Sandy Desert

Last updated: May 2, 2012

The proposal is to supply power to an expanded mining operation at the Telfer Gold Mine. The proposed expansion of the Telfer Gold Mine associated with this proposal is being dealt with separately. That mine expansion is set out in a separate referral to the EPA (Newcrest Mining Limited 2002b). The mine expansion and power supply proposals have been separated because it is likely that the mine and power supply will eventually be operated by different proponents. Nevertheless, the proposals have... Read more...

Cape Lambert Port upgrade - increase in throughput to 85 Mtpa

Last updated: April 4, 2012

The proposal is to increase the throughput of iron ore to 85 million tonnes per annum at the Cape Lambert Port operations. Read more...

Pilbara Iron Ore and Infrastructure Project: East-West Railway and Mine Sites (Stage B)

Last updated: March 28, 2012

The original proposal, as set out in the proponent’s PER, comprised four iron ore mines in the Pilbara region, an ore beneficiation plant, a borefield, an accommodation village and 160km of east-west railway connecting to the north-south link to Port Hedland. Since release of the PER, FMG has made several major modifications to the proposal: the proposed mines at Mt Lewin and Mt Nicholas have been excised; the connecting infrastructure to those minesites is not now needed, leading to a change... Read more...

Cape Lambert Port B development

Last updated: March 28, 2012

The proposal is to construct and operate a second port (Port B) at Cape Lambert to process and export up to 130 million tonnes of ore per annum. Read more...

Expansion of Jurien Gypsum Mining Operation Ml70/1161

Last updated: March 12, 2012

The proposal is for the mining of a 53-hectare area and processing of approximately 1.3 million tonnes of gypsum recovered from Mining Lease 70/1161 using the facilities currently employed for operations in the adjacent Mining Lease 70/750. The proposal involves dredging and will form a permanent hypersaline water body of approximately four metres maximum depth. Dredging operations are proposed to be undertaken every second year over a 2 to 4 week period to excavate approximately 100,000 tonnes... Read more...

Port Hedland Outer Harbour Development

Last updated: February 28, 2012

The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...

Macedon Gas Development

Last updated: January 17, 2012

The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...

Jack Hills Expansion Project

Last updated: January 9, 2012

The proposal consists of a designated mining area containing two open pits, integrated waste and tailings landform, ore beneficiating plant and workshops, a combined gas pipeline spur and water pipe corridor, a services (possible water, gas, power transmission) corridor to Weld Range, the Byro Sub-basin Borefield and the Murchison Palaeochannel Borefield, a power station, airstrip, village and ancillaries. The Jack Hills Expansion Project is contiguous with the Stage 1 mine. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.