Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions
      • Ministerial Statements

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chairman's Determinations

    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre
  • COVID-19 Update

Filter by industry sector:

  • (-) Remove Oil and gas filter Oil and gas
  • Infrastructure (8) Apply Infrastructure filter
  • Industrial (2) Apply Industrial filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by preliminary environmental factors:

  • Flora and Vegetation (19) Apply Flora and Vegetation filter
  • Marine Environmental Quality (19) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (16) Apply Benthic Communities and Habitats filter
  • Marine Fauna (15) Apply Marine Fauna filter
  • Terrestrial Fauna (15) Apply Terrestrial Fauna filter
  • Air Quality (12) Apply Air Quality filter
  • Social Surroundings (10) Apply Social Surroundings filter
  • Terrestrial Environmental Quality (7) Apply Terrestrial Environmental Quality filter
  • Coastal Processes (4) Apply Coastal Processes filter
  • Inland Waters Environmental Quality (4) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (3) Apply Hydrological Processes filter
  • Subterranean Fauna (3) Apply Subterranean Fauna filter
  • Landforms (2) Apply Landforms filter
  • Inland Waters (1) Apply Inland Waters filter

Filter by Proponent:

  • Chevron Australia Pty Ltd (9) Apply Chevron Australia Pty Ltd filter
  • West Australian Petroleum Pty Ltd (4) Apply West Australian Petroleum Pty Ltd filter
  • Apache Northwest Pty Ltd (3) Apply Apache Northwest Pty Ltd filter
  • Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited (3) Apply Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited filter
  • Sun Resources NL (2) Apply Sun Resources NL filter
  • Wesfarmers LPG Pty Ltd (2) Apply Wesfarmers LPG Pty Ltd filter
  • Western Mining Corporation Ltd (2) Apply Western Mining Corporation Ltd filter
  • Woodside Energy Ltd (2) Apply Woodside Energy Ltd filter
  • Woodside Offshore Petroleum Pty Ltd (2) Apply Woodside Offshore Petroleum Pty Ltd filter
  • Ampol Exploration Limited (1) Apply Ampol Exploration Limited filter
  • Ampol Exploration Ltd (1) Apply Ampol Exploration Ltd filter
  • Ampolex Ltd (1) Apply Ampolex Ltd filter
  • Apache Energy Ltd (1) Apply Apache Energy Ltd filter
  • Arc Energy Limited and Origin Energy Developments Pty Ltd (1) Apply Arc Energy Limited and Origin Energy Developments Pty Ltd filter
  • AWE Perth Pty Ltd (1) Apply AWE Perth Pty Ltd filter
  • BHP Billiton Petroleum Pty Ltd (1) Apply BHP Billiton Petroleum Pty Ltd filter
  • BHP Petroleum Pty Ltd and Dora! Resources N. L. (1) Apply BHP Petroleum Pty Ltd and Dora! Resources N. L. filter
  • BP Refinery (Kwinana) Pty Ltd (1) Apply BP Refinery (Kwinana) Pty Ltd filter
  • Caltex Oil (Austraiia) Pty Limited (1) Apply Caltex Oil (Austraiia) Pty Limited filter
  • Chevron Australia (1) Apply Chevron Australia filter
  • Chevron Australia Pty Ltd (for original proposal) (1) Apply Chevron Australia Pty Ltd (for original proposal) filter
  • Command Petroleum Holdings NL (1) Apply Command Petroleum Holdings NL filter
  • DBP Development group Nominees Pty Ltd (1) Apply DBP Development group Nominees Pty Ltd filter
  • DDG Operations Pty Ltd (1) Apply DDG Operations Pty Ltd filter
  • Doral Resources NL (1) Apply Doral Resources NL filter
  • Empire Oil Company (WA) Limited (1) Apply Empire Oil Company (WA) Limited filter
  • Lasmo Oil (Australia) Ltd (1) Apply Lasmo Oil (Australia) Ltd filter
  • Latent Petroleum Limited (1) Apply Latent Petroleum Limited filter
  • Minister for State Development (1) Apply Minister for State Development filter
  • Minora Resources NL (1) Apply Minora Resources NL filter
  • Mobil Australia Resources Company Pty Ltd (1) Apply Mobil Australia Resources Company Pty Ltd filter
  • Mobil Exploration and Producing Australia Pty Ltd (1) Apply Mobil Exploration and Producing Australia Pty Ltd filter
  • Normandy Pipeiines Pty Ltd and BHP Minerals Pty Ltd (1) Apply Normandy Pipeiines Pty Ltd and BHP Minerals Pty Ltd filter
  • Origin Energy Resources Limited (1) Apply Origin Energy Resources Limited filter
  • Petrochemical Industries Company Limited (PICL) (1) Apply Petrochemical Industries Company Limited (PICL) filter
  • RCMA Australia Pty Ltd (1) Apply RCMA Australia Pty Ltd filter
  • Roc Oil (WA) Limited (1) Apply Roc Oil (WA) Limited filter
  • State Energy Commission of Western Australia (1) Apply State Energy Commission of Western Australia filter
  • WAPET Pty Ltd (1) Apply WAPET Pty Ltd filter
  • Wesminco Oil Pty Ltd (1) Apply Wesminco Oil Pty Ltd filter
  • Woodside Energy (1) Apply Woodside Energy filter
  • Woodside Energy Ltd (1) Apply Woodside Energy Ltd filter

Filter by region:

  • Pilbara (38) Apply Pilbara filter
  • Gascoyne (7) Apply Gascoyne filter
  • Perth (7) Apply Perth filter
  • Mid West (5) Apply Mid West filter
  • Wheatbelt (3) Apply Wheatbelt filter
  • Goldfields Esperance (1) Apply Goldfields Esperance filter
  • Kimberley (1) Apply Kimberley filter
  • Peel (1) Apply Peel filter
  • South West (1) Apply South West filter

Filter by last updated:

  • 2022 (2) Apply 2022 filter
  • 2021 (2) Apply 2021 filter
  • 2020 (3) Apply 2020 filter
  • 2019 (4) Apply 2019 filter
  • 2018 (1) Apply 2018 filter
  • 2016 (1) Apply 2016 filter
  • 2015 (1) Apply 2015 filter
  • 2014 (1) Apply 2014 filter
  • 2013 (3) Apply 2013 filter
  • 2012 (2) Apply 2012 filter
  • 2011 (3) Apply 2011 filter
  • 2008 (3) Apply 2008 filter
  • 2006 (2) Apply 2006 filter
  • 2005 (3) Apply 2005 filter
  • 2004 (2) Apply 2004 filter
  • 2000 (1) Apply 2000 filter
  • 1999 (1) Apply 1999 filter
  • 1998 (2) Apply 1998 filter
  • 1997 (3) Apply 1997 filter
  • 1995 (2) Apply 1995 filter
  • 1994 (3) Apply 1994 filter
  • 1993 (1) Apply 1993 filter
  • 1992 (3) Apply 1992 filter
  • 1991 (7) Apply 1991 filter
  • 1990 (2) Apply 1990 filter
  • 1989 (3) Apply 1989 filter
  • 1988 (2) Apply 1988 filter
  • 1987 (1) Apply 1987 filter
  1. Home
  2. Proposal search
  3. Ministerial Statement published
  4. Oil and gas

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Scarborough Project Nearshore Component

Last updated: June 14, 2022

The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...

Wheatstone Development Proposal (S46) [2178]

Last updated: February 2, 2022

Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...

Cervantes-01 Conventional Well Drilling Proposal

Last updated: December 14, 2021

RCMA Australia is proposing to drill one conventional oil exploration well to determine if there is oil in the prospect, located 11 kilometres (km) south of Dongara / Port Denison in the onshore Perth Basin, within the Beekeepers Nature Reserve. The proposal includes all activities associated with drilling a conventional oil exploration well including site preparation, equipment mobilisation, drill, case and cement, decommissioning, demobilisation, site restoration and rehabilitation. The... Read more...

Waitsia Gas Project Stage 2

Last updated: October 4, 2021

The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites. The proposal includes clearing of up to 17 ha of native vegetation to support the following: Construction and operation of a new gas processing plant with a maximum export capacity of 250 terajoules per day; Drilling of up to 6 new production wells to supplement the existing 2 wells; Installation of a gas gathering system comprising of flowlines and... Read more...

Gas Pipeline from Griffin Oilfield to Mainland Facility near Onslow (S46) [2221]

Last updated: July 23, 2020

Change to condition 1 commitment 39 of Ministerial Statement 308 in order to consider the change of distance to the nearest sensitive receptor. Read more...

Gorgon Gas Development Revised and Expanded Proposal (s46) [2161]

Last updated: May 29, 2020

Section 46 - request for a change to Environmental Conditions: Inquire into the commencement of Condition 26 (Reservoir Carbon Dioxide Injection System) of Ministerial Statement 800. Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve

Last updated: April 3, 2020

The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island. Read more...

Pluto North West Shelf Interconnector Pipeline

Last updated: November 21, 2019

The Proposal is to construct and operate the Pluto to Northwest Shelf Interconnector, a 3.3 km long, steel buried natural gas pipeline, connecting the Pluto Interconnector Compressor Station to the Karratha Gas Plant which is operated by Woodside on behalf of the North West Shelf Project participants, located on the Burrup Peninsula in the North of Western Australia. The proposal will require the clearing of an estimated 10.69 ha.3.26 ha within the Karratha Gas Plant Lease and Buffer Zone Lease... Read more...

Gas pipeline from Griffin oilfield to mainland facility, near Onslow

Last updated: September 16, 2019

The proposal is to develop the Griffin oilfield which is located 68km offshore from Onslow. The oilfield will be developed using a floating production, storage and offloading facility and both oil and gas will be produced. The gas will be recovered and transported to the mainland via a submarine and onshore pipeline to a gas treatment plant and then on to the Dampier-Perth gas pipeline. This assessment comprises the portion of the offshore pipeline in State waters, bringing gas onshore to the... Read more...

Pluto LNG Development (Site B Option), Burrup Peninsula

Last updated: July 1, 2019

The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...

Wesfarmers LPG proposed upgrade

Last updated: March 26, 2019

The proposal is to upgrade the Liquefied Petroleum Gas (LPG) extraction plant at Kwinana. The proposed upgrade will coincide with a reduction in the concentration of LPG available in natural gas from the North West Shelf and enable the proponent to maintain existing levels of production of LPG. Read more...

Wheatstone Development - Gas Processing, Export Facilities and Infrastructure

Last updated: October 8, 2018

The Proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. Read more...

Browse Liquefied Natural Gas Precinct

Last updated: December 21, 2016

Note: In the matter of The Wilderness Society of WA (Inc) –v- Minister for Environment [2013] WASC, the Supreme Court of Western Australia found the Minister’s agreement decision invalid because the EPA’s decision to report was invalid., The proposal is a strategic environmental assessment for a common user LNG hub precinct for future Browse Basin gas processing in the Kimberley Region. Read more...

Gorgon Gas Development Fourth Train Expansion Proposal

Last updated: April 30, 2015

To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...

Gorgon Gas Development - Additional Construction Laydown and Operations Support Area

Last updated: April 2, 2014

Chevron Australia Pty Ltd proposes to clear an additional 32 hectares of land within a 36 hectare development envelope on Barrow Island. The clearing is for the purposes of an additional construction laydown and operations support area, required to support the construction and operation of the Gorgon Gas Development referred to in Ministerial Statement 800 dated 10 August 2009 and Ministerial Statement 865 dated 8 June 2011. Read more...

Gorgon Gas Development Barrow Island Nature Reserve

Last updated: June 26, 2013

Chevron Australia Pty Ltd, as operator for the Gorgon Joint Venturers, proposes to extract, pipe, liquefy and export 10 million tonnes per annum of natural gas from the Greater Gorgon and Jansz gas fields using facilities offshore and on Barrow Island, Western Australia. Read more...

Wheatstone Development (s46) [1960]

Last updated: January 30, 2013

The proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. The proposal includes: Subsea gas trunkline to bring produced hydrocarbons onshore to the LNG and Domgas plants; Product loading facility (PLF); Materials offloading facility (MOF); LNG and Domgas plants; Accommodation facilities;... Read more...

Wheatstone Development (s46) [1956]

Last updated: January 11, 2013

The proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. The proposal includes: Subsea gas trunkline to bring produced hydrocarbons onshore to the LNG and Domgas plants; Product loading facility (PLF); Materials offloading facility (MOF); LNG and Domgas plants; Accommodation facilities;... Read more...

Wheatstone Development – Gas Processing, Export Facilities and Infrastructure (s46)

Last updated: July 6, 2012

The proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. Inquiry under s46 to change conditions 6 and 8 of Ministerial Statement 873 . Read more...

Macedon Gas Development

Last updated: January 17, 2012

The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...

Pages

  • 1
  • 2
  • 3
  • 4
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
+618 6364 7000
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2022 Government of Western Australia. All rights reserved.