Last updated: July 29, 2019
The proposal is to develop and operate a mineral sands mine approximately 25 kilometres south-east of the township of Dongara in the Midwest Region of Western Australia. Read more...Last updated: July 8, 2019
The proposal is to revise the existing Pilbara Iron Ore and Infrastructure Project: East-West Railway and Mine Sites Stage B located approximately 70 to 100 km north of Newman in the Pilbara region of Western Australia. The proposal includes mines and associated infrastructure at Christmas Creek and Mindy Mindy, and an east-west railway to link the Stage A north-south railway (to Port Hedland) to the Christmas Creek Mine. The revision includes modification/expansion or development of additional... Read more...Last updated: June 7, 2019
Kalium Lakes Potash Pty Ltd is seeking to develop a sub-surface brine deposit to produce approximately 150 kilotonne per annum of Sulphate of Potash product and by-products. The process will involve evaporation and processing operations at the Beyondie, 10-Mile and Sunshine Lakes area. The Project is located approximately 160 kilometres south east of Newman, and 75 km east of the Kumarina Roadhouse, in the eastern Pilbara region of Western Australia. The proposal includes the development of... Read more...Last updated: May 15, 2019
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...Last updated: March 28, 2019
The EPA has received a third party referral for the development and operation of a Class II or III Putrescible Landfill on a property known as Allawuna, within the Shire of York. The proponent has advised the EPA that only Class II waste will be accepted. The proposal is located on Lots 9926, 26934, 4869 and 5831 Great Southern Highway, Saint Ronans. The proposal has a nominal life expectancy of 37 years and will accept between 150,000 and 250,000 tonnes of waste each year. Read more...Last updated: March 5, 2019
Pilbara Energy Company Pty Ltd (a wholly owned subsidiary of Fortescue Metals Group Limited (FMG)) is seeking to develop the Pilbara Transmission Project (the proposal), a high voltage power transmission network in the Pilbara region of Western Australia. The proposal is comprised of approximately 375 kilometres of 220 kilo-volt overhead transmission lines with terminal and substation infrastructure. The proposal is to be located within a 4780 hectare (ha) development envelope. The proposal... Read more...Last updated: March 5, 2019
DBNGP (WA) Nominees Pty Limited propose to construct 670m of underground natural gas pipeline between the Albemarle Kemerton Plant (a lithium hydroxide manufacturing plant) and the existing Dampier to Bunbury Natural Gas Pipeline. The proposal is located in Kemerton, approximately 17km north-east of Bunbury and will provide natural gas to the Albemarle Kemerton Plant (Ministerial Statement No. 1085) . The proposed pipeline will be constructed within a 30m wide corridor requiring clearing of 2.... Read more...Last updated: February 18, 2019
The proponent has requested consideration be given to removal of condition 9, which is the spider monitoring program. The Minister noted, that during the assessment of the proposal, offsets were proposed by the proponent but were not conditioned in Ministerial Statement 805. As part of this inquiry, the Minister requested that consideration is given to the application of offsets to the proposal and whether they should be included as a condition. Read more...Last updated: February 5, 2019
The proposal is to construct and operate a dual kaolin (clay) mine and a waste facility, accepting Class IV (Secure Landfill) and a V (Intractable Landfill) waste from all of Australia, including waste from offshore Oil and Gas facilities. The waste would include amongst other things low level radioactive wastes and persistent organic pollutants. The proposal would receive on average 100 000 tonnes of waste per annum for approximately 25 years. The proposal is located 140 kilometres west north... Read more...Last updated: February 4, 2019
The Shire of Ashburton is proposing the development of a new regional waste management facility located on undeveloped land at 150 Onslow Road, Talandji, approximately 36 km south of Onslow. The Pilbara Waste Management Facility will provide a range of waste management services including sustainable initiatives such as material reuse, recycling and recovery as well as treatment and disposal. The facility will include: - Class IV Landfill; - Bulk Waste Area including: Green... Read more...Last updated: December 12, 2018
The proposal is to extend the existing Red Hill Quarry to the west (West Quarry Pit Extension Area A) and north-west (West Quarry Pit Extension Area B) of the current pit, and extend the existing stockpile and dispatch area, and install a quaternary crusher. Read more...Last updated: December 12, 2018
The proposal is to construct and operate a dual carriageway road from the current terminus of Roe Highway at Kwinana Freeway in Jandakot to Stock Road in Coolbellup., Note:, The decision of the Supreme Court of Western Australia in, Save Beeliar Wetlands (Inc) and Anor v. Jacob, [2015] WASC 482 was overturned by the Court of Appeal on Friday 15 July 2016 in, Access the Court of Appeal decision, Jacob v Save Beeliar Wetlands (Inc), [2016] WASCA 126. The effect of the Court of Appeal decision is... Read more...Last updated: December 4, 2018
The proposal is to duplicate the existing Advanced Water Recycling Plant (AWRP) at the Beenyup facility in Craigie. The proposal also includes the construction of two water recharge sites and pipeline infrastructure along a 12.8 km route through the suburbs of Woodvale, Wanneroo, Ashby and Neerabup to recharge approximately 14 GL of recycled water to the Leederville and Yarragadee aquifers. The proposal forms Stage 2 of the Perth Groundwater Replenishment Scheme (GRWS) with the expansion of 14... Read more...Last updated: December 3, 2018
Wesfarmers Chemicals, Energy & Fertilisers Limited proposes to construct and operate a methanol plant with a production capacity of approximately 5,000 tonnes per day ( tpd ) on Site E within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. The proposal is adjacent to the Murujuga National Park. The proposal would result in the disturbance of approximately 75 hectares within Site E. Read more...Last updated: November 19, 2018
Argyle Cattle Company Pty Ltd proposes to disturb up to to 1,200 ha of native vegetation for 650 ha of irrigated pasture and fodder and associated infrastructure. The proposal is located 64 km south of Broome on the Great Northern Highway, in the Shire of Broome. Read more...Last updated: November 12, 2018
The proposal is to develop and operate an iron ore mine approximately 50 km west-northwest of Paraburdoo, Western Australia, a 20 km long gas pipeline corridor, and a 150 km long rail transport corridor that would connect the proposed mine to the West Pilbara Iron Ore Project Stage 1 infrastructure. Read more...Last updated: October 15, 2018
Changes to conditions 3-1 and 3-2 of Ministerial Statement 772 in order to extend the Time Limit of Authorisation Read more...