Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (83) Apply Iron Ore filter
  • Infrastructure (50) Apply Infrastructure filter
  • Industrial (14) Apply Industrial filter
  • Oil and gas (11) Apply Oil and gas filter
  • Salt (7) Apply Salt filter
  • Gold (5) Apply Gold filter
  • Power generation (4) Apply Power generation filter
  • Copper (2) Apply Copper filter
  • Land use (1) Apply Land use filter
  • Manganese (1) Apply Manganese filter
  • Molybdenum (1) Apply Molybdenum filter
  • Rare earth elements (1) Apply Rare earth elements filter
  • Sand, rock, gravel and clay (1) Apply Sand, rock, gravel and clay filter
  • Uranium (1) Apply Uranium filter
  • Utilities (1) Apply Utilities filter
  • Waste management (1) Apply Waste management filter

Filter by current status:

  • Ministerial Statement published (103) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (28) Apply Decision on whether to assess has been published filter
  • EPA Report and Recommendations released - appeals open (6) Apply EPA Report and Recommendations released - appeals open filter
  • Assessment has been terminated under s40A of the EP Act (5) Apply Assessment has been terminated under s40A of the EP Act filter
  • Environmental Scoping Document approved (3) Apply Environmental Scoping Document approved filter
  • Assessment on Proponent Information – public submission period closed (2) Apply Assessment on Proponent Information – public submission period closed filter
  • Ministerial Statement withdrawn under s.47A (2) Apply Ministerial Statement withdrawn under s.47A filter
  • Environmental Review document open for public submissions (1) Apply Environmental Review document open for public submissions filter
  • EPA Report and Recommendations released - appeals closed (1) Apply EPA Report and Recommendations released - appeals closed filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter
  • Response to submission published (1) Apply Response to submission published filter

Filter by preliminary environmental factors:

  • (-) Remove Terrestrial Fauna filter Terrestrial Fauna
  • Flora and Vegetation (152) Apply Flora and Vegetation filter
  • Social Surroundings (90) Apply Social Surroundings filter
  • Subterranean Fauna (64) Apply Subterranean Fauna filter
  • Hydrological Processes (56) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (52) Apply Inland Waters Environmental Quality filter
  • Inland Waters (45) Apply Inland Waters filter
  • 37 (29) Apply 37 filter
  • Terrestrial Environmental Quality (24) Apply Terrestrial Environmental Quality filter
  • Marine Fauna (21) Apply Marine Fauna filter
  • Benthic Communities and Habitats (20) Apply Benthic Communities and Habitats filter
  • Marine Environmental Quality (20) Apply Marine Environmental Quality filter
  • Landforms (16) Apply Landforms filter
  • Coastal Processes (11) Apply Coastal Processes filter
  • 3144 (8) Apply 3144 filter
  • Greenhouse Gas Emissions (6) Apply Greenhouse Gas Emissions filter
  • People (4) Apply People filter
  • Air Quality (2) Apply Air Quality filter
  • Human Health (2) Apply Human Health filter

Filter by Proponent:

  • BHP Billiton Iron Ore Pty Ltd (10) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Hamersley Iron Pty Limited (8) Apply Hamersley Iron Pty Limited filter
  • Fortescue Metals Group Limited (7) Apply Fortescue Metals Group Limited filter
  • Chevron Australia Pty Ltd (6) Apply Chevron Australia Pty Ltd filter
  • BHP Iron Ore Pty Ltd (5) Apply BHP Iron Ore Pty Ltd filter
  • API Management Pty Limited (4) Apply API Management Pty Limited filter
  • Forge Resources Swan Pty Ltd (3) Apply Forge Resources Swan Pty Ltd filter
  • Pilbara Energy (Generation) Pty Ltd (3) Apply Pilbara Energy (Generation) Pty Ltd filter
  • Robe River Mining Co. Pty. Ltd (3) Apply Robe River Mining Co. Pty. Ltd filter
  • Roy Hill Iron Ore Pty Ltd (3) Apply Roy Hill Iron Ore Pty Ltd filter
  • Water Corporation (3) Apply Water Corporation filter
  • Atlas Iron Pty Ltd (2) Apply Atlas Iron Pty Ltd filter
  • Atlas Iron Pty. Ltd. (2) Apply Atlas Iron Pty. Ltd. filter
  • Brockman Iron Pty Ltd (2) Apply Brockman Iron Pty Ltd filter
  • Bungaroo South Pty Ltd (2) Apply Bungaroo South Pty Ltd filter
  • Chichester Metals Pty Ltd (2) Apply Chichester Metals Pty Ltd filter
  • Fortescue Metals Group (2) Apply Fortescue Metals Group filter
  • Fortescue Metals Group Ltd (2) Apply Fortescue Metals Group Ltd filter
  • Hamersley Iron Pty Ltd (2) Apply Hamersley Iron Pty Ltd filter
  • Hancock Prospecting Pty Ltd (2) Apply Hancock Prospecting Pty Ltd filter
  • Leichhardt Industrials Pty Ltd (2) Apply Leichhardt Industrials Pty Ltd filter
  • Main Roads Western Australia (2) Apply Main Roads Western Australia filter
  • Mardie Minerals Pty Ltd (2) Apply Mardie Minerals Pty Ltd filter
  • NW Interconnected Power Pty Ltd (2) Apply NW Interconnected Power Pty Ltd filter
  • Onslow Iron Pty Ltd and API Management Pty Limited (2) Apply Onslow Iron Pty Ltd and API Management Pty Limited filter
  • PIOP Mine Co NL (2) Apply PIOP Mine Co NL filter
  • Roy Hill Infrastructure Pty Ltd (2) Apply Roy Hill Infrastructure Pty Ltd filter
  • Australian Methanol Company Pty Ltd (1) Apply Australian Methanol Company Pty Ltd filter
  • BHP Billiton Petroleum Pty Ltd (1) Apply BHP Billiton Petroleum Pty Ltd filter
  • Burrup Nitrates Pty Ltd (1) Apply Burrup Nitrates Pty Ltd filter
  • Chevron Australia (1) Apply Chevron Australia filter
  • Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited (1) Apply Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited filter
  • Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Ltd (1) Apply Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Ltd filter
  • Ferro Metals Australia Pty Ltd (1) Apply Ferro Metals Australia Pty Ltd filter
  • FMG (1) Apply FMG filter
  • Forge Resources (1) Apply Forge Resources filter
  • Hamersley HMS Pty Limited (1) Apply Hamersley HMS Pty Limited filter
  • Hope Downs Management Services Pty Ltd (1) Apply Hope Downs Management Services Pty Ltd filter
  • Iron Ore Holdings Ltd (1) Apply Iron Ore Holdings Ltd filter
  • Landcorp and Department of Mineral and Petroleum Resources (1) Apply Landcorp and Department of Mineral and Petroleum Resources filter
  • Methanex Corporation (1) Apply Methanex Corporation filter
  • Moly Metals Australia Pty Ltd (1) Apply Moly Metals Australia Pty Ltd filter
  • Pilbara Iron Pty Ltd (1) Apply Pilbara Iron Pty Ltd filter
  • Polaris Metals Pty Ltd (1) Apply Polaris Metals Pty Ltd filter
  • Port Hedland Port Authority (1) Apply Port Hedland Port Authority filter
  • Rio Tinto Iron Ore (1) Apply Rio Tinto Iron Ore filter
  • Rio Tinto Pty Ltd (1) Apply Rio Tinto Pty Ltd filter
  • Robe River Mining Co Pty Ltd (1) Apply Robe River Mining Co Pty Ltd filter
  • Robe River Mining Company Pty Ltd (1) Apply Robe River Mining Company Pty Ltd filter
  • Tropicana Joint Venture (1) Apply Tropicana Joint Venture filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara
  • Kimberley (2) Apply Kimberley filter
  1. Home
  2. Proposal search
  3. Terrestrial Fauna
  4. Pilbara

Asian Renewable Energy Hub

Last updated: April 11, 2024

NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...

Koodaideri Iron Ore Mine and Infrastructure Project

Last updated: March 7, 2024

Hamersley Iron Pty. Limited (a wholly -owned subsidiary of Rio Tinto) proposes the development of a major iron ore mining operation in the central Pilbara region of Western Australia. The development will be centered around its Koodaideri deposits, located 110 kilometres west-north-west of Newman. The Proposal will involve the construction and operation of a greenfields mine and associated infrastructure. Mining will consist of open pits and supporting infrastructure, including a 167 kilometre... Read more...

Woodside Solar Facility

Last updated: February 29, 2024

Woodside Energy Ltd (Woodside) proposes to construct and operate the Woodside Solar Facility in the Maitland Strategic Industrial Area, located approximately 15 kilometres south-west of Karratha, in the Pilbara region of Western Australia. The proposal will generate electricity (up to 500 megawatts) from a large-scale solar photovoltaic (PV) farm and includes energy storage (battery) infrastructure. The Proposal is only for the infrastructure associated with the generation and storage of... Read more...

Cloudbreak Life of Mine Expansion

Last updated: February 9, 2024

The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...

BHP Billiton Iron Ore - Pilbara Strategic Proposal

Last updated: February 5, 2024

BHP Billiton Iron Ore has prepared a Strategic Proposal of its future operations in the Pilbara for the next 50 to 100 years. The Strategic Proposal will facilitate a more holistic and longer term view of mining activities in the Pilbara region by identifying and assessing how impacts to the environment at a landscape scale will be managed. Read more...

Winu Project

Last updated: December 22, 2023

Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...

Mulga Downs Hub and Rail Spur

Last updated: December 22, 2023

The Mulga Downs Hub and Rail Spur (the Proposal) is located approximately 210 km south of Port Hedland and 180 km northwest of Newman in the Pilbara region of Western Australia. The Proposal is for the development of a hub and rail spur to connect into the existing Roy Hill Railway for the transport of iron ore to Port Hedland. The Proposal includes truck unloading and train loading facilities, product rehandling facilities, stockyards, a laboratory, a rail loop and rail service tracks, lateral... Read more...

Ningaloo Lighthouse Resort Project

Last updated: December 15, 2023

Z1Z Resorts Pty Ltd proposes to redevelop the Ningaloo Lighthouse Holiday Park, located along Yardie Creek Road, North West Cape. The Proposal comprises the construction of new visitor accommodation; the construction of associated ancillary facilities (i.e., staff accommodation, power supply infrastructure, water supply and treatment, wastewater treatment and reuse, and replacement service station (vehicle refuelling) etc.); refurbishment of the Vlamingh Head Lighthouse Quarters (a part of... Read more...

Eliwana Iron Ore Mine

Last updated: November 6, 2023

Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price. Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years. The proposal involves the clearing of up to 8,560 ha of native... Read more...

Optimised Mardie Project

Last updated: October 19, 2023

Mardie Minerals Pty Ltd has approval to develop a greenfields high quality salt and SoP project and associated export facility at Mardie, approximately 80 km south-west of Karratha, in the Pilbara region of WA. The project will produce a high purity salt product, Sulphate of Potash (SoP) and other products that can be derived from sea water. The Proposal includes the expansion of the approved Mardie Project (Ministerial Statement [MS] 1175) including expanded concentrator and crystalliser ponds... Read more...

Uaroo Renewable Energy Hub

Last updated: October 18, 2023

Pilbara Energy (Generation) Pty Ltd proposes to construct and operate the Uaroo Renewable Energy Hub on the Uaroo and Emu Creek Pastoral Stations located 120 kilometres south of Onslow, in the Pilbara region of Western Australia. The proposal is to construct and operate a renewable energy generation hub to power Fortescue Metals Group Limited’s mining operations in the Pilbara. The proposal will generate electricity (up to 5.4 gigawatts) from up to 340 wind turbine generators and a solar farm.... Read more...

Sanjiv Ridge Project - Stage 2

Last updated: September 29, 2023

Atlas Iron Pty Ltd is proposing to develop and operate Stage 2 of the Sanjiv Ridge Project, a satellite operation to Stage 1, which will involve the above water table mining of approximately 10 million tonnes (Mt) of iron ore from the Glen Herring deposit which is located on an adjacent range 3 km west of Stage 1 and approximately 241 km south-east of Port Hedland in the Shire of East Pilbara. The proposal will consist of three new pits, four waste rock dumps and a 4 km haul road connecting to... Read more...

Newman Hub (Western Ridge) Derived Proposal

Last updated: September 8, 2023

BHP propose to expand existing mining operations at the Newman Hub in the Pilbara, approximately 2 kilometres (km) southwest of Newman. The Proposal is a derived proposal for mining operations at Newman (Western Ridge) authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement 1105. The proposal is to develop four iron ore deposits to expand BHP’s Newman Hub and includes: overburden storage areas ore and topsoil stockpiles haul and access roads overland conveyor 30 million... Read more...

Manuwarra Red Dog Highway – Revised Proposal

Last updated: July 4, 2023

In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve (S46) [2368]

Last updated: June 26, 2023

Inquiry into implementation Condition 10 (Terrestrial and Marine Quarantine Management System), Condition 16 (Long-term Marine Turtle Management Plan) and Condition 25 (Coastal Stability Management and Monitoring Plan) to ensure that they are effective and reflect a contemporary outcome-based condition setting. It is noted a preceding Section 46 inquiry into Ministerial 800 (dated 11-03-2023) has been requested by the Minister for Environment in relation to Conditions 9, and 15 (Inquiry 1).... Read more...

West Pilbara Iron Ore Project – Stage 1 Mine Area (S46) [2351 ]

Last updated: June 16, 2023

The requested change relates to condition 3 of Statement 1027 for an extension to the time limit for proposal implementation. Read more...

Solomon Iron Ore Project Expansion

Last updated: June 7, 2023

Fortescue Metals Group Limited is proposing to increase the footprint and mining life of the Solomon Iron Ore Project. The proposal consists of expanding mining operations and rail infrastructure beyond the current footprint. Fortescue Metals Group Limited is also seeking approval for an external borefield to provide an additional water supply to support the expansion. The extent of proposed ground disturbance is approximately: 11,322 hectares for the mine expansion within a development... Read more...

Marillana Iron Ore Project, Shire of East Pilbara (S46) [2352]

Last updated: October 31, 2022

The requested change relates to condition 3 of Statement 1055 for an extension to the time limit for proposal implementation. Read more...

Brockman Syncline 4 Iron Ore - Revised Proposal

Last updated: September 1, 2022

Hamersley Iron Pty Limited have submitted a revised proposal for Brockman IV. This proposal provides for the expansion of the existing mine including additional clearing and the release of excess water, as well as some other minor changes. Read more...

Ammonia Plant, Murujuga (Burrup Peninsula), Renewable Hydrogen Project

Last updated: August 4, 2022

Yara Pilbara Fertilisers Pty Ltd propose to modify the existing Pilbara Fertiliser project to include the development of a Renewable Hydrogen Plant and associated infrastructure. The proposal is located approximately 11 km north-west of Karratha in the Pilbara region of Western Australia. The proposal is adjacent to the National Heritage listed area and the Murujuga National Park. The proposal would include a total disturbance of 24.78 hectares. The proposal will result in reduction of... Read more...

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.