Last updated: December 28, 2005
The proposal is to construct and operate a 23-kilometre pipeline from Kwinana Junction, in Kwinana to Hopelands (between Punrak Road and Henderson Road). This proposal is known as the Southern Looping Project, and comprises loop 10. The proponent has also referred a proposal to construct and operate a 194-kilometre pipeline from Compressor Station 1 south of Karratha, to Compressor Station 9, north of Gingin. This proposal, known as the Northern Looping Project , and comprising loops 1 to 9,... Read more...Last updated: March 4, 2005
The proposal is to construct and operate the South West Metropolitan Railway from Perth to Mandurah. The proposal includes the establishment of rail infrastructure between Perth and Mandurah with the northern section of the line running from the Perth Central Business District to Anketell tunnel via the Kwinana Freeway. South of the Anketell tunnel, the proposed railway passes through the local government areas of the Town of Kwinana, the City of Rockingham and the City of Mandurah, and... Read more...Last updated: September 20, 2004
Proposal to subdivide approximately 89 hectares of land being Lot 502 bounded by North Lake, Phoenix and Sudlow Roads and a rail reserve, for industrial and mixed business purposes. The proponent for the proposal is the Western Australian Land Authority trading as LandCorp (LandCorp). Read more...Last updated: June 25, 2004
Proposal by the Water Corporation to construct a Water Treatment Plant in Mundaring and Water Storage Tanks in Sawyers Valley. Read more...Last updated: July 11, 2003
The proposal is for the first stage of a Coral Coast Resort (CCR), which includes tourist, residential and incidental commercial facilities centred around an inland marina, at the site called Mauds Landing. The CCR proposal envisages the establishment, in the first stage, of a marina, a caravan park, an interpretative centre, a back-packers facility, stage one of a resort complex, provision of utilities infrastructure and the preparation of land with services for sale at a later date. The CCR... Read more...Last updated: May 12, 2003
Cable Sands (WA) Pty Ltd proposal to develop a mineral sands mine in a section of State Forest No.2, near Ludlow. Read more...Last updated: December 20, 2002
The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...Last updated: February 6, 2002
The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains. The M2 Project is located near Kununurra within the Victoria-Bonaparte Biogeographic Region and the project area extends over approximately 76,000 ha of land comprising the Weaber, Keep River and Knox Creek Plains, and involves approximately equal areas within WA and the NT. The proposal has been assessed in two parts: biodiversity and management. This assessment is of the management component. See... Read more...Last updated: September 14, 2001
The proposal is for a large-scale nickel and cobalt mining and processing operation which will involve the mining and processing of up to 15 million dry tonnes per annum (Mtpa) of lateritic ore to produce approximately 60,000 tonnes per annum (tpa) of nickel and up to 8,000 tpa of cobalt. The ore will be mined at Marshall Pool, 55 km south-south-east of Leinster, and Lawlers, 10 km south of Leinster. Read more...Last updated: August 30, 1999
Pacesetter Homes proposes to subdivide Lots 1588 and 10 Harpenden Street Southern River into 89 residential allotments. Read more...Last updated: June 4, 1999
The Western Australian Planning Commission proposes to rezone the majority of the Forrestfield Marshalling Yards to "Industrial" from the current Metropolitan Region Scheme reservation of "Railways" and to relocate the "Important Regional Road" (Dundas Road) to a site within the Forrestfield Marshalling Yards. Read more...Last updated: May 8, 1996
The proposal is to develop an upgraded tailings storage facility (TSF) at the Mt Keith nickel mine, located approximately 100 kilometres north of Leinster in the north-eastern Goldfields region of Western Australia Mining. Processing of nickel ore commenced at Mt Keith in 1994. To date, two conventional paddock storage type tailings cells have been used to store tailings, and the proponent has approval to construct an additional two cells. In 1990, a feasibility study into centralised thickened... Read more...Last updated: March 1, 1996
The Tony Scolaro Family Trust intends to redevelop an existing caravan park into a Park Home Estate. The proposal will involve the construction of new infrastructure including 120 park homes (demountable houses), associated access roads, a new wastewater treatment plan and infiltration areas for stormwater and treated wastewater. Read more...Last updated: May 13, 1992
An application for Renewal of Excavation Licence by Midland Brick Company Ltd was referred to the Environmental Protection Authority by the Shire of Swan in August 1990. the Authority assessed the environmental impact of the proposal by way of a Consultative Environmental Review in conjunction with four other nearby clay excavation proposals which, together with this proposal were thought to potentially impact on Ellen Brook Nature Reserve and to have common regional issues of rehabilitation... Read more...Last updated: December 21, 1991
Proposal to remove an estimated 295,650 m 3 of sand from a pastured hill which runs east-west along the northern boundary of Lot 242 Corio Road, Pinjarra. Read more...Last updated: January 17, 1990
The Port Geographe proposal is a residential canal development with harbour, commercial centre and a conservation area. The site lies on the coast immediately east of the existing Busselton built up area, between the ocean foreshore to the north and the Vasse estuary to the south and east. The project site has a total area of 300 hectares. Approximately 114 hectares of the site is proposed to become conservation area and be transferred to the Crown. Read more...