Last updated: August 5, 2011
The proposal is to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are eleven separate looping sections proposed from south of Dampier to Wagerup West. Read more...Last updated: August 1, 2011
The proposal is to increase the mine dewatering rate up to 50 Gigalitres per annum and to inject surplus water into two brackish and one saline injection zones at the Christmas Creek Mine. Read more...Last updated: April 21, 2011
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. Read more...Last updated: March 14, 2011
Oakajee Rail Development is a component of the larger Oakajee Port and Rail Development. The proposed heavy haulage railway and the associated facilities covered in this proposal include 570 kilometres (km) of railway and associated rail infrastructure extending in a north-easterly direction from the North West Coastal Highway (NWCH) approximately 1.5km south of Olsen Road at Oakajee, approximately 24km north of Geraldton, to the Jack Hills mining operations located approximately 500km to the... Read more...Last updated: March 14, 2011
The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...Last updated: March 11, 2011
The proposal is to mine hematite and magnetite iron ore from the Blue Hills North and Terapod deposits, and construction of associated mine infrastructure, upgraded access road to Morawa, Tilley Siding, and powerline corridor in the Midwest region of Western Australia. Read more...Last updated: January 20, 2011
The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal also involves the construction and operation of an approximately 63 kilometre long wastewater discharge pipeline following the same... Read more...Last updated: November 4, 2010
Identification of potential corridors and areas for future installation of water and waste water pipelines and associated infrastructure throughout the southern suburbs of Perth. Read more...Last updated: October 28, 2010
The proposal is to develop an iron ore mine at the Koolyanobbing Iron Ore Project-Mt Jackson J1 Deposit (Mt Jackson J1 Deposit), located approximately 110 kilometres (km) north-north-east of Southern Cross in the Shire of Yilgarn. The proposal includes two mine pits to extract approximately 33 million tonnes of iron ore and associated mining infrastructure. The proposed mine required disturbance of approximately 605 hectares (ha) of native vegetation for pits, associated mine infrastructure,... Read more...Last updated: June 15, 2010
The strategic proposal is to: extend the Leeuwin Naturaliste National Park into the western part of Sussex Location 413; and develop the eastern part of Sussex Location 413 for tourism and residential purposes with associated public open space and foreshore reserves as generally depicted on the Development Guide Plan. Read more...Last updated: November 2, 2009
Midland Brick Company Pty Ltd (Midland Brick) referred a proposal to the Environmental Protection Authority (EPA) on 3 May 2002 to indefinitely extend the time limit of its environmental approval for its clay excavation operation at Hallet and Copley Roads, Upper Swan and to expand the environmental approval to include Lot 19 Copley Road, Lots 19, 45 and 46 St Albans Road and Lot 100 Great Northern Highway, Upper Swan for further clay excavation operations. The new areas to be included in the... Read more...Last updated: October 11, 2009
The proposal is to extend Roe Highway from South Street in Canning Vale to connect to Kwinana Freeway in Leeming over a distance of approximately 4.5 km. The highway is planned as a four-lane dual carriageway (two lanes in each direction), with provision for future upgrading to three lanes in each direction. The land required for any future upgrading will be provided in the median strip. The total footprint of the project area represents 62 hectares (ha). Approximately 53.9 ha of this area will... Read more...Last updated: April 28, 2009
The proponent proposes to mine up to 10.1 Mtpa of magnetite ore to produce 6 Mtpa of ore concentrate over a 15 year mine life. The magnetite concentrate would be conveyed to Port Hedland from the mine via a 110 km slurry pipeline located alongside the existing Pilbara Energy Pipeline (PEPL). The concentrate would be dewatered at a purpose-built facility located at Utah Point in the Port Hedland Port area, prior to shipping overseas, where it would be used predominantly in steel manufacture. Read more...Last updated: December 17, 2008
The proposal is to develop a new iron ore mine approximately 60 kilometres west-north-west of Tom Price and 25 kilometres south-west of the existing Brockman 2 mine. The major components of the project include: Three new mine pits- with approximately 20% of the orebody occurring below the water table; Dry processing plant- including crushers, overland conveyor and screens; this will be located to the north of the pits running east/west to the rail loop; Associated mine infrastructure- this... Read more...Last updated: August 9, 2007
The installation of a wet compression system and associated infrastructure within the existing Kemerton Power Station, and the construction of evaporation ponds and a water pipeline to deliver water from an existing offtake located about 4 kilometres to the east. The wet compression system will enable the power station to generate additional power at ambient temperatures above International Standards Organisation conditions by eliminating the sensitivity of the installed gas turbines to ambient... Read more...Last updated: November 17, 2006
The proposal is for the remaining life of the mine (50+ years), located west of Jimblebar Creek on Mining Lease 266SA. It entails increasing the iron ore production rate at the mine from 8 million tonnes per annum (Mtpa) to approximately 12Mtpa, and the mining of the currently undeveloped deposits on either side of the existing operation, including both in-situ hard rock and detrital ores. Approximately 600 million tonnes of Marra Mamba iron ore have been identified within the mining envelope.... Read more...Last updated: June 29, 2006
The proponent proposes to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are nine separate looping sections proposed from CS 1 south of Karratha, to CS 9, north of Gingin. Looping is a process of duplicating an existing pipeline between compressor stations for a certain distance. Once the specified distance is reached, it then ties back to the parallel pipeline. This design... Read more...Last updated: June 23, 2006
Proposal to develop the Wallaby Gold Mine. Located on the shore of Lake Carey, a naturally occurring saline wetland approximately 27 km south-west of Laverton. The Wallaby Gold Mine Project includes development of an open cut gold mine, waste rock dumps and infrastructure to support mining on the northern shoreline of the lake. Gold ore produced at the mine will be transported via overland conveyor to an existing processing plant with tailings placed in both an extended and a new tailings... Read more...Last updated: May 25, 2006
The proposal is for residential development on the East Clontarf site, approximately 18ha in size. The site is bounded by Manning Road, Centenary Avenue and the Canning River. It is zoned Urban in the Metropolitan Region Scheme (MRS) and Residential in the City of South Perth Town Planning Scheme. The foreshore area adjacent to the proposed development is identified for protection as Bush Forever site 333 and reserved for Parks and Recreation in the MRS. Read more...Last updated: March 28, 2006
The proposal is for the developing of mining operations at the areas of Trilogy and Kundip, construction of a haul road, construction and operation of a processing plant, and disposal of tailings at the RAV 8 site. Read more...