The proposal involves an extension to the Wheelarra Hill open pits and overburden storage areas, and the mining of the South Jimblebar and Hashimoto deposits, with disposal of overburden into adjacent Overburden Storage Areas (OSAs) and in-pit disposal. Inquiry under s46 related to Ministerial Statement 857, the subject of EPA Report 1371. Read more...Last updated: May 4, 2016
Life-of-mine proposal to mine iron ore within Mining Leases 270SA and 47/292 at a rate of approximately 45 million tonnes per annum, and subsequent rehabilitation and decommissioning of the site. Read more...Last updated: May 2, 2016
The proposal is to develop an iron ore mine on the Iron Valley tenement located in the Shire of East Pilbara approximately 90 kilometres north-west of Newman. The project would include an above watertable blast and hydraulic shovel open pit mine and supporting infrastructure including dry crushing and screening plant, run of mine pad, waste rock landform, internal roads, power production, hazardous materials storage, waste management facilities, office buildings and an accommodation camp. Read more...Last updated: April 26, 2016
Brikmakers Pty Ltd proposes to extract clay from Lot 7 Toy Rd Bindoon, within the Shire of Chittering. Approximately 15 hectares (ha) of predominately pasture land will be disturbed for the construction of two clay excavation pits, a stockpile area, two dams, and bunds. Upgrading of a causeway across the Brockman River, which traverses west to east along the southern portion of the property, together with a new crossover to Toy Road is also proposed. Read more...Last updated: March 3, 2016
The proposal includes the existing Hamersley Yandicoogina iron ore project and proposed expansion. The existing project includes open pit mining at the Junction Central and Junction South East operations and associated infrastructure, dewatering activities, closure and rehabilitation. The expansion includes the development of new pits at Junction South West and Oxbow, temporary waste landforms, the development of new infrastructure, additional dewatering and water disposal activities. The... Read more...Last updated: November 17, 2015
To extend the Argyle Diamond Mine operations to develop an underground diamond mine and associated infrastructure 110 km south of Kununurra in the Shire of Wyndham-East Kimberley. This inquiry relates to Ministerial Statement 711, the subject of EPA Report 1205 . Read more...Last updated: October 22, 2015
The proposal is to extend the existing Wheelarra Hill open pits, develop the South Jimblebar and Hashimoto deposits, and to increase the ore processing capacity by 30 million tonnes per annum (mtpa) to 75 mtpa. Open pit mining will occur above and below ground and will involve dewatering. Excess water will be discharged into the Ophthalmia Dam. Read more...Last updated: August 7, 2015
The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...Last updated: July 10, 2015
The proposal involves the expansion of existing operations of the Nammuldi-Silvergrass Iron Ore Project and is therefore a Revised Proposal.The proposal includes the additional clearing of approximately 3,900 ha of vegetation for mine pits, waste dumps and associated mine infrastructure and facilities, and approximately 2,500 ha for the IAA. Read more...Last updated: March 4, 2015
The proposal is for the construction and operation the Kintyre uranium project. The proposal includes the open cut mining of uranium ore, processing, and the transport of uranium ore concentrate to the Port of Adelaide. The project is located 260km north-east of Newman in the East Pilbara region of Western Australia. Read more...Last updated: February 9, 2015
The proposal is for the construction and operation of a diamond mine, power station and processing plant within Mining Lease 04/372 in the West Kimberley area 140 kilometres east of Derby, to process approximately 4.4 million tonnes per annum of ore. Read more...Last updated: October 24, 2014
The construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Inquiry into amending the conditions of Ministerial Statement 816 (extension of term). Read more...Last updated: October 17, 2014
To undertake mining and processing of up to 129 million tonnes of magnetite iron ore in the Central and Western deposits at the Balla Balla mine site and to construct and operate a pipeline to convey the magnetite slurry to Utah Point, Port Hedland. Inquiry under s46 in regard to changing the implementation conditions of Ministerial Statement 794 . Read more...Last updated: October 16, 2014
The proposal is to develop a mineral sands mine near the Keysbrook township. The proposal involves the extraction and processing of a low-grade heavy mineral sands deposit. This inquiry under s46 is in regard to a request for an extension of time for substantial commencement specified in Ministerial Statement 810 . Read more...Last updated: October 15, 2014
Fortescue Metals Group Limited (Fortescue) proposes to develop two new mines within the Solomon Project, a greenfield site approximately 60 kilometres (km) north of Tom Price and adjacent to the North Eastern boundary of the Karijini National Park, and to construct a 127 km railway from the new mines eastwards to the existing Fortescue railway. Read more...Last updated: June 18, 2014
The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...Last updated: June 4, 2014
The expansion of existing mining operations at Marandoo by mining below the water table, including expansion of the existing mine pit and development of new waste dumps. Read more...Last updated: March 12, 2014
The proposal is to construct and operate an iron ore mine and associated infrastructure at Weld Range. Open pit mining would occur above and below the water table and would involve dewatering. Excess water would be discharged to a lined evaporation pond. Read more...Last updated: February 6, 2014
The proposal has the following main components: a 345 km railway line from Port Hedland to proposed mining operations at Mindy Mindy. This railway will be constructed in two parts: Part 1 from Port Hedland to the Chichester Ranges and Part 2 from the Chichester Ranges to Mindy Mindy; construction of port facilities consisting of rail loop, car dumper, stockyard and ore handling facilities (including two stackers and a single reclaimer), rescreening facility and product conveyor out to a wharf... Read more...Last updated: January 16, 2014
The proposal is for the development of an iron ore mine at deposits 'A' and 'B' and ore processing operation at West Angelas 130 kilometres west of Newman, and construction of a rail line and expansion of port facilities at Cape Lambert. Read more...